Extract from the Register of European Patents

EP About this file: EP3854248

EP3854248 - FLEXIBLE MANNEQUIN SHOES AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.08.2023
Database last updated on 09.04.2026
FormerThe patent has been granted
Status updated on  16.09.2022
FormerGrant of patent is intended
Status updated on  02.06.2022
FormerRequest for examination was made
Status updated on  25.06.2021
FormerThe international publication has been made
Status updated on  28.03.2020
Most recent event   Tooltip22.08.2025Lapse of the patent in a contracting state
New state(s): HU
published on 24.09.2025  [2025/39]
Applicant(s)For all designated states
Jung, Hyunju
205-1106, 150, Samseong-ro
Gangnam-gu
Seoul 06288 / KR
[2022/42]
Former [2021/30]For all designated states
Jung, Hyunju
205-1106, 150, Samseong-ro
Gangnam-gu
Seoul 06288 / KR
Inventor(s)01 / see applicant
...
 [2021/30]
Representative(s)Sach, Greg Robert
Valet Patent Services LLP
Siedlungsstrasse 4a
85253 Erdweg / DE
[2022/42]
Former [2021/30]M. Zardi & Co S.A.
Via G. B. Pioda, 6
6900 Lugano / CH
Application number, filing date19861773.017.09.2019
[2021/30]
WO2019KR12007
Priority number, dateKR2018011235719.09.2018         Original published format: KR 20180112357
[2021/30]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020060162
Date:26.03.2020
Language:KO
[2020/13]
Type: A1 Application with search report 
No.:EP3854248
Date:28.07.2021
Language:EN
[2021/30]
Type: B1 Patent specification 
No.:EP3854248
Date:19.10.2022
Language:EN
[2022/42]
Search report(s)International search report - published on:KR26.03.2020
(Supplementary) European search report - dispatched on:EP15.10.2021
ClassificationIPC:A43C11/00, A47F8/00, A43B3/16, A43B3/24, A47B91/00, A63H3/52
[2022/25]
CPC:
A47F8/00 (EP,KR); A63H3/52 (EP,KR,US); A43B3/16 (EP);
A43B3/24 (EP); A43B3/242 (EP); A43B3/244 (EP,US);
A43B3/246 (EP); A43B3/248 (EP,US); A43B3/26 (US);
A43C11/008 (KR); A47B91/005 (EP) (-)
Former IPC [2021/46]A43B3/28, A43C11/00, A47F8/00, A43B3/16, A43B3/24, A47B91/00
Former IPC [2021/30]A43B3/28, A43C11/00, A47F8/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:FLEXIBLE SCHAUFENSTERPUPPENSCHUHE UND VERFAHREN ZU IHRER HERSTELLUNG[2021/30]
English:FLEXIBLE MANNEQUIN SHOES AND METHOD FOR MANUFACTURING SAME[2021/30]
French:CHAUSSURES SOUPLES DE MANNEQUIN ET PROCÉDÉ DE FABRICATION DE TELLES CHAUSSURES[2021/30]
Entry into regional phase18.03.2021Translation filed 
18.03.2021National basic fee paid 
18.03.2021Search fee paid 
18.03.2021Designation fee(s) paid 
18.03.2021Examination fee paid 
Examination procedure18.03.2021Amendment by applicant (claims and/or description)
18.03.2021Examination requested  [2021/30]
03.06.2022Communication of intention to grant the patent
05.09.2022Fee for grant paid
05.09.2022Fee for publishing/printing paid
05.09.2022Receipt of the translation of the claim(s)
Opposition(s)20.07.2023No opposition filed within time limit [2023/39]
Fees paidRenewal fee
11.08.2021Renewal fee patent year 03
14.09.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY17.09.2019
HU17.09.2019
AL19.10.2022
AT19.10.2022
BG19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
MC19.10.2022
RS19.10.2022
SI19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
[2025/39]
Former [2025/36]CY17.09.2019
AL19.10.2022
AT19.10.2022
BG19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
MC19.10.2022
RS19.10.2022
SI19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2024/51]AL19.10.2022
AT19.10.2022
BG19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
MC19.10.2022
RS19.10.2022
SI19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2024/28]AL19.10.2022
AT19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
MC19.10.2022
RS19.10.2022
SI19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/51]AL19.10.2022
AT19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SI19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/38]AL19.10.2022
AT19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SK19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/37]AL19.10.2022
AT19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/35]AT19.10.2022
CZ19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/34]AT19.10.2022
DK19.10.2022
EE19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/33]AT19.10.2022
DK19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
SM19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/25]AT19.10.2022
FI19.10.2022
HR19.10.2022
LT19.10.2022
LV19.10.2022
RS19.10.2022
NO19.01.2023
GR20.01.2023
IS19.02.2023
PT20.02.2023
Former [2023/23]AT19.10.2022
FI19.10.2022
LT19.10.2022
LV19.10.2022
NO19.01.2023
GR20.01.2023
PT20.02.2023
Former [2023/22]AT19.10.2022
FI19.10.2022
LT19.10.2022
NO19.01.2023
PT20.02.2023
Former [2023/20]LT19.10.2022
NO19.01.2023
Documents cited:Search[A] KR101596208  (KIM JUNG SOOK et al.) [A] 1-16 * paragraph [0012] - paragraph [0038] * * figures 1-9 *
 [A] KR20140089029  (UNIV DONG EUI IND ACAD COOP FO et al.) [A] 1-16 * paragraph [0017] - paragraph [0038] * * figures 1-7 *
 [A] US2009119946  (BAKER LORI T et al.) [A] 1-16 * paragraph [0032] - paragraph [0040] * * figures 1-6 *
International search[A] KR20140089029  (UNIV DONG EUI IND ACAD COOP FO et al.) [A] 1-16 * See paragraph [0026]. claim 1; and figure 2. *
 [A] WO2016113082  (ADIDAS AG et al.) [A] 1-16 * See the entire document. *
 [A] KR20110136507  (WOO SOON KU et al.) [A] 1-16 * See the entire document. *
 [A] JP2000037203  (SALOMON SA et al.) [A] 1-16 * See the entire document. *
 [PX] KR101924103  (JUNG HYUN JU et al.) [PX] 1-16 * See claims 1-15; and figure 6. *
ExaminationUS3237822
by applicantKR101489561
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.