| EP3854248 - FLEXIBLE MANNEQUIN SHOES AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.08.2023 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 16.09.2022 | ||
| Former | Grant of patent is intended Status updated on 02.06.2022 | ||
| Former | Request for examination was made Status updated on 25.06.2021 | ||
| Former | The international publication has been made Status updated on 28.03.2020 | Most recent event Tooltip | 22.08.2025 | Lapse of the patent in a contracting state New state(s): HU | published on 24.09.2025 [2025/39] | Applicant(s) | For all designated states Jung, Hyunju 205-1106, 150, Samseong-ro Gangnam-gu Seoul 06288 / KR | [2022/42] |
| Former [2021/30] | For all designated states Jung, Hyunju 205-1106, 150, Samseong-ro Gangnam-gu Seoul 06288 / KR | Inventor(s) | 01 /
see applicant ... | [2021/30] | Representative(s) | Sach, Greg Robert Valet Patent Services LLP Siedlungsstrasse 4a 85253 Erdweg / DE | [2022/42] |
| Former [2021/30] | M. Zardi & Co S.A. Via G. B. Pioda, 6 6900 Lugano / CH | Application number, filing date | 19861773.0 | 17.09.2019 | [2021/30] | WO2019KR12007 | Priority number, date | KR20180112357 | 19.09.2018 Original published format: KR 20180112357 | [2021/30] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020060162 | Date: | 26.03.2020 | Language: | KO | [2020/13] | Type: | A1 Application with search report | No.: | EP3854248 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Type: | B1 Patent specification | No.: | EP3854248 | Date: | 19.10.2022 | Language: | EN | [2022/42] | Search report(s) | International search report - published on: | KR | 26.03.2020 | (Supplementary) European search report - dispatched on: | EP | 15.10.2021 | Classification | IPC: | A43C11/00, A47F8/00, A43B3/16, A43B3/24, A47B91/00, A63H3/52 | [2022/25] | CPC: |
A47F8/00 (EP,KR);
A63H3/52 (EP,KR,US);
A43B3/16 (EP);
A43B3/24 (EP);
A43B3/242 (EP);
A43B3/244 (EP,US);
A43B3/246 (EP);
A43B3/248 (EP,US);
A43B3/26 (US);
|
| Former IPC [2021/46] | A43B3/28, A43C11/00, A47F8/00, A43B3/16, A43B3/24, A47B91/00 | ||
| Former IPC [2021/30] | A43B3/28, A43C11/00, A47F8/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | FLEXIBLE SCHAUFENSTERPUPPENSCHUHE UND VERFAHREN ZU IHRER HERSTELLUNG | [2021/30] | English: | FLEXIBLE MANNEQUIN SHOES AND METHOD FOR MANUFACTURING SAME | [2021/30] | French: | CHAUSSURES SOUPLES DE MANNEQUIN ET PROCÉDÉ DE FABRICATION DE TELLES CHAUSSURES | [2021/30] | Entry into regional phase | 18.03.2021 | Translation filed | 18.03.2021 | National basic fee paid | 18.03.2021 | Search fee paid | 18.03.2021 | Designation fee(s) paid | 18.03.2021 | Examination fee paid | Examination procedure | 18.03.2021 | Amendment by applicant (claims and/or description) | 18.03.2021 | Examination requested [2021/30] | 03.06.2022 | Communication of intention to grant the patent | 05.09.2022 | Fee for grant paid | 05.09.2022 | Fee for publishing/printing paid | 05.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 20.07.2023 | No opposition filed within time limit [2023/39] | Fees paid | Renewal fee | 11.08.2021 | Renewal fee patent year 03 | 14.09.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 17.09.2019 | HU | 17.09.2019 | AL | 19.10.2022 | AT | 19.10.2022 | BG | 19.10.2022 | CZ | 19.10.2022 | DK | 19.10.2022 | EE | 19.10.2022 | FI | 19.10.2022 | HR | 19.10.2022 | LT | 19.10.2022 | LV | 19.10.2022 | MC | 19.10.2022 | RS | 19.10.2022 | SI | 19.10.2022 | SK | 19.10.2022 | SM | 19.10.2022 | NO | 19.01.2023 | GR | 20.01.2023 | IS | 19.02.2023 | PT | 20.02.2023 | [2025/39] |
| Former [2025/36] | CY | 17.09.2019 | |
| AL | 19.10.2022 | ||
| AT | 19.10.2022 | ||
| BG | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| MC | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SI | 19.10.2022 | ||
| SK | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2024/51] | AL | 19.10.2022 | |
| AT | 19.10.2022 | ||
| BG | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| MC | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SI | 19.10.2022 | ||
| SK | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2024/28] | AL | 19.10.2022 | |
| AT | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| MC | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SI | 19.10.2022 | ||
| SK | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/51] | AL | 19.10.2022 | |
| AT | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SI | 19.10.2022 | ||
| SK | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/38] | AL | 19.10.2022 | |
| AT | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SK | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/37] | AL | 19.10.2022 | |
| AT | 19.10.2022 | ||
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/35] | AT | 19.10.2022 | |
| CZ | 19.10.2022 | ||
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/34] | AT | 19.10.2022 | |
| DK | 19.10.2022 | ||
| EE | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/33] | AT | 19.10.2022 | |
| DK | 19.10.2022 | ||
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| SM | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/25] | AT | 19.10.2022 | |
| FI | 19.10.2022 | ||
| HR | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| RS | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| IS | 19.02.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/23] | AT | 19.10.2022 | |
| FI | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| LV | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| GR | 20.01.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/22] | AT | 19.10.2022 | |
| FI | 19.10.2022 | ||
| LT | 19.10.2022 | ||
| NO | 19.01.2023 | ||
| PT | 20.02.2023 | ||
| Former [2023/20] | LT | 19.10.2022 | |
| NO | 19.01.2023 | Documents cited: | Search | [A] KR101596208 (KIM JUNG SOOK et al.) [A] 1-16 * paragraph [0012] - paragraph [0038] * * figures 1-9 * | [A] KR20140089029 (UNIV DONG EUI IND ACAD COOP FO et al.) [A] 1-16 * paragraph [0017] - paragraph [0038] * * figures 1-7 * | [A] US2009119946 (BAKER LORI T et al.) [A] 1-16 * paragraph [0032] - paragraph [0040] * * figures 1-6 * | International search | [A] KR20140089029 (UNIV DONG EUI IND ACAD COOP FO et al.) [A] 1-16 * See paragraph [0026]. claim 1; and figure 2. * | [A] WO2016113082 (ADIDAS AG et al.) [A] 1-16 * See the entire document. * | [A] KR20110136507 (WOO SOON KU et al.) [A] 1-16 * See the entire document. * | [A] JP2000037203 (SALOMON SA et al.) [A] 1-16 * See the entire document. * | [PX] KR101924103 (JUNG HYUN JU et al.) [PX] 1-16 * See claims 1-15; and figure 6. * | Examination | US3237822 | by applicant | KR101489561 |