blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3874879

EP3874879 - METHOD AND INTEGRATED ACCESS BACKHAUL NODE FOR RESOURCE SCHEDULING [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  06.09.2024
Database last updated on 11.09.2024
FormerExamination is in progress
Status updated on  03.05.2024
FormerRequest for examination was made
Status updated on  06.08.2021
FormerThe international publication has been made
Status updated on  09.05.2020
Most recent event   Tooltip06.09.2024Withdrawal of applicationpublished on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2021/36]
Inventor(s)01 / WANG, Min
Granitstigen 27
977 53 Lulea / SE
02 / LIU, Jinhua
No. 5 Lize East Street
Chaoyang District
Beijing 100102 / CN
 [2021/36]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2021/36]
Application number, filing date19877778.130.10.2019
[2021/36]
WO2019CN114444
Priority number, dateWO2018CN11273630.10.2018         Original published format: PCT/CN2018/112736
[2021/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020088546
Date:07.05.2020
Language:EN
[2020/19]
Type: A1 Application with search report 
No.:EP3874879
Date:08.09.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 07.05.2020 takes the place of the publication of the European patent application.
[2021/36]
Search report(s)International search report - published on:CN07.05.2020
(Supplementary) European search report - dispatched on:EP14.06.2022
ClassificationIPC:H04W72/12, // H04L1/18, H04W84/04
[2022/28]
CPC:
H04W72/12 (EP,US); H04L1/1812 (US); H04L47/28 (EP);
H04L1/18 (EP); H04W84/047 (EP)
Former IPC [2021/36]H04W72/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/36]
TitleGerman:VERFAHREN UND BACKHAUL-KNOTEN MIT INTEGRIERTEM ZUGANG ZUR BETRIEBSMITTELPLANUNG[2021/36]
English:METHOD AND INTEGRATED ACCESS BACKHAUL NODE FOR RESOURCE SCHEDULING[2021/36]
French:PROCÉDÉ, ET NOEUD IAB (INTEGRATED ACCESS BACKHAUL) POUR LA PLANIFICATION DE RESSOURCES[2021/36]
Entry into regional phase16.04.2021National basic fee paid 
16.04.2021Search fee paid 
16.04.2021Designation fee(s) paid 
16.04.2021Examination fee paid 
Examination procedure16.04.2021Examination requested  [2021/36]
21.12.2022Amendment by applicant (claims and/or description)
03.05.2024Despatch of a communication from the examining division (Time limit: M04)
30.08.2024Application withdrawn by applicant  [2024/41]
Fees paidRenewal fee
27.10.2021Renewal fee patent year 03
27.10.2022Renewal fee patent year 04
27.10.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]  - NOKIA ET AL, "Resource allocation/coordination between Parent BH and Child links", vol. RAN WG1, no. Chengdu, China; 20181008 - 20181012, (20180928), 3GPP DRAFT; R1-1810675_IAB_RESOURCE ALLOCATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94b/Docs/R1%2D1810675%2Ezip, (20181211), XP051518080 [X] 1-3,6,8,11,12,14,15 * "2 Schedulable resources for IAB child link(s)" - "2.1 NR Rel-15 approach" * * "3 Resource allocation granularity: slot vs. mini-slot" - 4 "Multi-hop support and IAB-node processing times" * * "Appendix" * * figures 1, 2, 4-6 * * table 1 * [A] 7,9,10,13 [I] 4,5
 [XAI]  - NOKIA ET AL, "Resource allocation between backhaul and access links", vol. RAN WG1, no. Gothenburg, Sweden; 20180820 - 20180824, (20180810), 3GPP DRAFT; R1-1808580_IAB_RESOURCE ALLOCATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94/Docs/R1%2D1808580%2Ezip, (20180810), XP051515957 [X] 1-3,6,8,11,12,14,15 * "1 Introduction" * * "4 Scheduling and resource coordination between backhaul and access" - "5 Multi-hop support and IAB noded processing times" * * figures 5, 6 * * table 1 * [A] 7,9,10,13 [I] 4,5
 [A]  - AT&T, "Summary of 7.2.3.1 Enhancements to support NR backhaul links", vol. RAN WG1, no. Gothenburg, Sweden; 20180820 - 20180824, (20180825), 3GPP DRAFT; R1-1809941, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94/Docs/R1%2D1809941%2Ezip, (20181211), XP051517297 [A] 1-15 * "TDM/FDM/SDM access and backhaul traffic multiplexing" * * "3.3 Timing and Synchronization" *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.