blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3779261

EP3779261 - ROTARY BRACKET [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  16.10.2024
Database last updated on 02.11.2024
FormerExamination is in progress
Status updated on  08.12.2023
FormerRequest for examination was made
Status updated on  15.01.2021
FormerThe international publication has been made
Status updated on  09.05.2020
Most recent event   Tooltip16.10.2024New entry: Communication of intention to grant a patent 
Applicant(s)For all designated states
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Administration Building
Bantian, Longgang District
Shenzhen, Guangdong 518129 / CN
[2021/07]
Inventor(s)01 / JIANG, Yuxiao
Huawei Administration Building Bantian, Longgang
District
Shenzhen, Guangdong 518129 / CN
02 / WANG, Chenglong
Huawei Administration Building Bantian, Longgang
District
Shenzhen, Guangdong 518129 / CN
03 / SONG, Zheng
Huawei Administration Building Bantian, Longgang
District
Shenzhen, Guangdong 518129 / CN
04 / LV, Haiquan
Huawei Administration Building Bantian, Longgang
District
Shenzhen, Guangdong 518129 / CN
05 / YUAN, Dong
China Mobile Group Zhejiang Co., Ltd. Hangzhou
Branch No.18, No. 605, Shangtang Road
Hangzhou, Zhejiang 310015 / CN
06 / ZHENG, Chong
China Mobile Group Zhejiang Co., Ltd. Hangzhou
Branch No.18, No. 605, Shangtang Road
Hangzhou, Zhejiang 310015 / CN
07 / CAI, Wei
China Mobile Group Zhejiang Co., Ltd. Hangzhou
Branch No.18, No. 605, Shangtang Road
Hangzhou, Zhejiang 310015 / CN
 [2021/07]
Representative(s)Körber, Martin Hans, et al
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Karlstraße 7
80333 München / DE
[N/P]
Former [2021/07]Körber, Martin Hans
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Sonnenstrasse 33
80331 München / DE
Application number, filing date19879188.120.05.2019
[2021/07]
WO2019CN87517
Priority number, dateCN201821760447U29.10.2018         Original published format: CN 201821760447 U
[2021/07]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020087910
Date:07.05.2020
Language:ZH
[2020/19]
Type: A1 Application with search report 
No.:EP3779261
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)International search report - published on:CN07.05.2020
(Supplementary) European search report - dispatched on:EP05.07.2021
ClassificationIPC:F16M13/02, F16M11/04, F16M11/06, F16M11/10, F16M11/20, F16M11/22, H01Q1/12
[2021/31]
CPC:
F16M11/105 (EP,US); F16M11/06 (US); F16M11/048 (US);
F16M11/18 (US); F16M11/2014 (EP); F16M11/2092 (EP);
F16M11/22 (EP); F16M13/02 (EP,US); H01Q1/1221 (EP,US);
F16M2200/025 (EP); F16M2200/027 (EP); F16M2200/028 (EP);
F16M2200/08 (EP) (-)
Former IPC [2021/07]F16M13/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/07]
TitleGerman:DREHBÜGEL[2021/07]
English:ROTARY BRACKET[2021/07]
French:SUPPORT ROTATIF[2021/07]
Entry into regional phase12.11.2020Translation filed 
12.11.2020National basic fee paid 
12.11.2020Search fee paid 
12.11.2020Designation fee(s) paid 
12.11.2020Examination fee paid 
Examination procedure12.11.2020Examination requested  [2021/07]
30.12.2021Amendment by applicant (claims and/or description)
07.12.2023Despatch of a communication from the examining division (Time limit: M04)
05.04.2024Reply to a communication from the examining division
17.04.2024Despatch of a communication from the examining division (Time limit: M04)
16.08.2024Reply to a communication from the examining division
17.10.2024Communication of intention to grant the patent
Fees paidRenewal fee
27.05.2021Renewal fee patent year 03
31.03.2022Renewal fee patent year 04
24.05.2023Renewal fee patent year 05
16.05.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]US2681195  (BRADT FRANCIS J, et al);
 [A]US3208703  (ARNOLD HARLEY E, et al);
 [A]US6731250  (BERMAN ELLIOT [US]);
 [XA]US2004223078  (ZADOK ADAM [US]);
 [A]US2005196163  (MOOTZ JEFFERY S [US], et al)
International search[A]US6682029  (DIERKES BARRY [US]) [A] 1-13 * entire document *;
 [Y]CN203571378U  (JIYUAN POWER SUPPLY CO LTD OF HENAN ELECTRIC POWER CORP) [Y] 1, 5, 13 * description, paragraphs 15-23, and figure 1 *;
 [A]US2015201511  (LEE JUNGYUN [KR], et al) [A] 1-13* entire document *;
 [Y]CN107542314  (JIANG ZHEMING) [Y] 1, 5, 13 * description, paragraphs 15-17, and figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.