blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3874668

EP3874668 - METHODS AND APPARATUSES OF DETERMINING QUASI CO-LOCATION (QCL) ASSUMPTIONS FOR BEAM OPERATIONS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.07.2024
Database last updated on 12.10.2024
FormerExamination is in progress
Status updated on  14.04.2023
FormerRequest for examination was made
Status updated on  06.08.2021
FormerThe international publication has been made
Status updated on  09.05.2020
Most recent event   Tooltip19.07.2024Application deemed to be withdrawnpublished on 21.08.2024  [2024/34]
Applicant(s)For all designated states
FG Innovation Company Limited
Flat 2623, 26/F Tuen Mun Central Square
22 Hoi Wing Road
Tuen Mun, New Territories
Hong Kong / CN
[2021/36]
Inventor(s)01 / CHENG, Chienchun
FACA, CHIEN-CHUN CHENG
6F, No. 185, Jingye 1st Road
Zhongshan District
Taipei City, Taiwan 11492 / TW
02 / TSAI, Tsunghua
TSUNG-HUA TSAI
12F.-7, No. 135, Ciyun Rd., East Dist.
Hsinchu City, Taiwan 30072 / TW
03 / CHENG, Yuhsin
FACA, 5F-1, YU-HSIN CHENG 5F-1
No. 5, Hsin-An Rd.
Hsinchu Science-based Industrial Park
Hsinchu City, Taiwan 300 / TW
04 / LIN, Wanchen
WAN-CHEN LIN
No. 130, Zhuangjing Rd.
Hualien City, Taiwan 970 / CN
 [2021/36]
Representative(s)Uexküll & Stolberg
Partnerschaft von
Patent- und Rechtsanwälten mbB
Maria-Theresia-Str. 13
81675 München / DE
[N/P]
Former [2021/36]Müller Hoffmann & Partner
Patentanwälte mbB
St.-Martin-Strasse 58
81541 München / DE
Application number, filing date19880818.022.10.2019
[2021/36]
WO2019CN112403
Priority number, dateUS201862754165P01.11.2018         Original published format: US 201862754165 P
[2021/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020088295
Date:07.05.2020
Language:EN
[2020/19]
Type: A1 Application with search report 
No.:EP3874668
Date:08.09.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 07.05.2020 takes the place of the publication of the European patent application.
[2021/36]
Search report(s)International search report - published on:CN07.05.2020
(Supplementary) European search report - dispatched on:EP20.06.2022
ClassificationIPC:H04L5/00
[2021/36]
CPC:
H04L5/0053 (EP,KR); H04L5/0007 (EP,KR); H04W72/51 (KR,US);
H04L5/0023 (EP); H04L5/0032 (KR,US); H04L5/0044 (EP);
H04L5/005 (EP,KR,US); H04L5/0098 (EP,KR); H04W72/044 (KR,US);
H04W72/23 (KR,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/36]
TitleGerman:VERFAHREN UND VORRICHTUNGEN ZUR BESTIMMUNG VON QUASI-KOLLOKATIONS(QCL)-ANNAHMEN FÜR STRAHLOPERATIONEN[2021/36]
English:METHODS AND APPARATUSES OF DETERMINING QUASI CO-LOCATION (QCL) ASSUMPTIONS FOR BEAM OPERATIONS[2021/36]
French:PROCÉDÉS ET APPAREILS DE DÉTERMINATION DE SUPPOSITIONS DE QUASI-CO-LOCALISATION (QCL) POUR OPÉRATIONS DE FAISCEAU[2021/36]
Entry into regional phase25.05.2020Translation filed 
12.05.2021National basic fee paid 
12.05.2021Search fee paid 
12.05.2021Designation fee(s) paid 
12.05.2021Examination fee paid 
Examination procedure12.05.2021Examination requested  [2021/36]
15.01.2023Amendment by applicant (claims and/or description)
14.04.2023Despatch of a communication from the examining division (Time limit: M04)
23.08.2023Reply to a communication from the examining division
30.11.2023Despatch of a communication from the examining division (Time limit: M04)
03.04.2024Application deemed to be withdrawn, date of legal effect  [2024/34]
23.04.2024Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2024/34]
Fees paidRenewal fee
28.10.2021Renewal fee patent year 03
22.09.2022Renewal fee patent year 04
26.09.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]  - INTEL CORPORATION, "Remaining Issues on Beam Management", (20180929), pages 1 - 15, 3GPP DRAFT; R1-1810751 REMAINING ISSUES ON BM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94b/Docs/R1%2D1810751%2Ezip, XP051518155 [X] 1-3,11 * Sections 2.1 and 2.2 * [I] 4-10
 [XY]  - ZTE, "Maintenance for Reference signals and QCL", vol. RAN WG1, no. Gothenburg, Sweden; 20180820 - 20180824, (20180811), 3GPP DRAFT; R1-1808197 MAINTENANCE FOR REFERENCE SIGNALS AND QCL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94/Docs/R1%2D1808197%2Ezip, (20180811), XP051515582 [X] 1 * Section 2.6 * [Y] 2-11
 [XY]  - LG ELECTRONICS, "Remaining issues on downlink control channel", vol. RAN WG1, no. Gothenburg, Sweden; 20180820 - 20180824, (20180811), pages 1 - 9, 3GPP DRAFT; R1-1808490 REMAINING ISSUES ON DOWNLINK CONTROL CHANNEL_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94/Docs/R1%2D1808490%2Ezip, (20180811), XP051515868 [X] 1 * section 2.6 * [Y] 2-11
 [XY]  - NOKIA ET AL, "Feature lead summary on QCL", vol. RAN WG1, no. Gothenburg, Sweden; 20180820 - 20180824, (20180822), 3GPP DRAFT; R1-1809758, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94/Docs/R1%2D1809758%2Ezip, (20180822), XP051517119 [X] 1 * page 9 * [Y] 2-11
 [Y]  - VIVO, "Maintenance for beam management", vol. RAN WG1, no. Chengdu, China; 20181008 - 20181012, (20180929), pages 1 - 6, 3GPP DRAFT; R1-1810366_MAINTENANCE FOR BEAM MANAGEMENT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F94b/Docs/R1%2D1810366%2Ezip, (20180929), XP051517775 [Y] 2-11 * Section 2.1.3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.