EP3883162 - DATA TRANSMISSION METHOD, AND TERMINAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2024 Database last updated on 26.12.2024 | |
Former | The patent has been granted Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 27.02.2023 | ||
Former | Request for examination was made Status updated on 20.08.2021 | ||
Former | The international publication has been made Status updated on 20.06.2020 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Vivo Mobile Communication Co., Ltd. 283 BBK Road Wusha Chang'An Dongguan, Guangdong 523860 / CN | [2021/38] | Inventor(s) | 01 /
WU, Yumin 283, BBK Road,xWusha,xChang'an Dongguan, Guangdong 523860 / CN | 02 /
BAO, Wei 283, BBK Road, Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [2021/38] | Representative(s) | Winter, Brandl - Partnerschaft mbB Alois-Steinecker-Straße 22 85354 Freising / DE | [2021/38] | Application number, filing date | 19895478.6 | 27.11.2019 | [2021/38] | WO2019CN121232 | Priority number, date | CN201811535437 | 14.12.2018 Original published format: CN201811535437 | [2021/38] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020119457 | Date: | 18.06.2020 | Language: | ZH | [2020/25] | Type: | A1 Application with search report | No.: | EP3883162 | Date: | 22.09.2021 | Language: | EN | [2021/38] | Type: | B1 Patent specification | No.: | EP3883162 | Date: | 02.08.2023 | Language: | EN | [2023/31] | Search report(s) | International search report - published on: | CN | 18.06.2020 | (Supplementary) European search report - dispatched on: | EP | 23.12.2021 | Classification | IPC: | H04L1/1822, H04W72/04, H04L1/1867, H04W80/02 | [2023/10] | CPC: |
H04L1/1822 (EP);
H04L1/1806 (CN,KR);
H04W72/21 (EP,US);
H04L1/1812 (CN,KR);
H04L1/1819 (US);
H04L1/1874 (EP,CN,KR,US);
H04L1/188 (EP);
H04L1/1893 (EP);
H04W72/0446 (US);
H04W80/02 (EP,US)
(-)
|
Former IPC [2022/04] | H04L1/18, H04W72/04 | ||
Former IPC [2021/38] | H04L1/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/38] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | DATEIÜBERTRAGUNGSVERFAHREN UND ENDGERÄT | [2021/38] | English: | DATA TRANSMISSION METHOD, AND TERMINAL | [2021/38] | French: | PROCÉDÉ DE TRANSMISSION DE DONNÉES, ET TERMINAL | [2021/38] | Entry into regional phase | 18.06.2021 | Translation filed | 18.06.2021 | National basic fee paid | 18.06.2021 | Search fee paid | 18.06.2021 | Designation fee(s) paid | 18.06.2021 | Examination fee paid | Examination procedure | 18.06.2021 | Examination requested [2021/38] | 21.07.2022 | Amendment by applicant (claims and/or description) | 28.02.2023 | Communication of intention to grant the patent | 21.06.2023 | Fee for grant paid | 21.06.2023 | Fee for publishing/printing paid | 21.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.05.2024 | No opposition filed within time limit [2024/28] | Fees paid | Renewal fee | 18.06.2021 | Renewal fee patent year 03 | 13.10.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 02.08.2023 | BG | 02.08.2023 | CZ | 02.08.2023 | DK | 02.08.2023 | EE | 02.08.2023 | FI | 02.08.2023 | HR | 02.08.2023 | LT | 02.08.2023 | LV | 02.08.2023 | MC | 02.08.2023 | PL | 02.08.2023 | RO | 02.08.2023 | RS | 02.08.2023 | SE | 02.08.2023 | SI | 02.08.2023 | SM | 02.08.2023 | NO | 02.11.2023 | GR | 03.11.2023 | IE | 27.11.2023 | LU | 27.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | IS | 02.12.2023 | [2024/51] |
Former [2024/47] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IE | 27.11.2023 | ||
LU | 27.11.2023 | ||
BE | 30.11.2023 | ||
CH | 30.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/46] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IE | 27.11.2023 | ||
LU | 27.11.2023 | ||
CH | 30.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/36] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
LU | 27.11.2023 | ||
CH | 30.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/34] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
LU | 27.11.2023 | ||
CH | 30.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/32] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/23] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/22] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/20] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/10] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/09] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
LT | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/08] | LT | 02.08.2023 | |
NO | 02.11.2023 | ||
GR | 03.11.2023 |