blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4018056

EP4018056 - A BRICK SLIP PANEL AND A METHOD OF MANUFACTURE A BRICK SLIP PANEL [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  08.03.2024
Database last updated on 02.11.2024
FormerRequest for examination was made
Status updated on  27.05.2022
FormerThe international publication has been made
Status updated on  05.03.2021
Most recent event   Tooltip08.03.2024Application deemed to be withdrawnpublished on 10.04.2024  [2024/15]
Applicant(s)For all designated states
Skonto Concrete Cladding, Sia
Emilia Melngaila iela 1a
Riga 1010 / LV
[2022/26]
Inventor(s)01 / RAVIS, Rihards
33. linija 3
2010 Jurmala / LV
 [2022/26]
Representative(s)Kromanis, Artis
AAA Law Latvia, SIA
Citadeles Street 12, 3rd floor
1010 Riga / LV
[N/P]
Former [2022/26]Kromanis, Artis
Petersona patents - AAA Law, SIA
Citadeles Street 12, 3rd floor
1010 Riga / LV
Application number, filing date19943827.623.08.2019
[2022/26]
WO2019IB57099
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021038268
Date:04.03.2021
Language:EN
[2021/09]
Type: A1 Application with search report 
No.:EP4018056
Date:29.06.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 04.03.2021 takes the place of the publication of the European patent application.
[2022/26]
Search report(s)International search report - published on:RU04.03.2021
(Supplementary) European search report - dispatched on:EP13.04.2023
ClassificationIPC:E04F13/14, E04F13/08, B28B7/00, B28B23/00
[2023/19]
CPC:
E04F13/0862 (EP,US); E04F13/0873 (US); B28B19/0061 (EP);
E04F13/0866 (EP,US); E04F13/142 (EP); E04F13/147 (US)
Former IPC [2022/26]E04F13/072, E04F13/14, E04F13/16, E04F13/22
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/26]
TitleGerman:ZIEGELRUTSCHPLATTE UND VERFAHREN ZU IHRER HERSTELLUNG[2022/26]
English:A BRICK SLIP PANEL AND A METHOD OF MANUFACTURE A BRICK SLIP PANEL[2022/26]
French:PANNEAU EN BRIQUETTES ET PROCÉDÉ DE FABRICATION D'UN PANNEAU EN BRIQUETTES[2022/26]
Entry into regional phase21.01.2022National basic fee paid 
21.01.2022Search fee paid 
21.01.2022Designation fee(s) paid 
21.01.2022Examination fee paid 
Examination procedure28.05.2020Request for preliminary examination filed
International Preliminary Examining Authority: RU
21.01.2022Amendment by applicant (claims and/or description)
21.01.2022Examination requested  [2022/26]
15.11.2023Application deemed to be withdrawn, date of legal effect  [2024/15]
05.12.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2024/15]
Fees paidRenewal fee
21.01.2022Renewal fee patent year 03
10.08.2022Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.08.202305   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]GB2045675  (IBSTOCK BUILDING PRODUCTS LTD) [Y] 6-9* page 1, lines 78-91; figure 1 *;
 [Y]US2013160393  (STEINMETZ MOSHE [US]) [Y] 1-9 * paragraphs [0006] , [0 24]; figures 2, 3 *;
 [Y]WO2017069802  (MAX LIFE LLC [US]) [Y] 1-5 * page 14, lines 10-14; figure 9 *
International search[A]US4299069  (NEUMANN ALFRED)[A] 1-8;
 [Y]WO9312308  (WORLDWIDE BUILDING SYSTEMS NV [NL]) [Y] 1-8 * p. 3 line 33 -p. 4 line 20, fig. 1, 6, 8 *;
 [Y]RU120680U  (KARAKOZOV EDUARD ANDREEVICH et al) [Y] 1-8 * p. 3 line 13 -p. 4 line 16, claims 1-4, fig. 1-3 *;
 [A]RU2016123793  (NESTA VLADIMIR NIKOLAEVICH) [A] 1-8
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.