blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4054232

EP4054232 - CELL MEASUREMENT METHOD, TERMINAL DEVICE, AND NETWORK DEVICE [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  20.06.2024
Database last updated on 16.09.2024
FormerRequest for examination was made
Status updated on  05.08.2022
FormerThe international publication has been made
Status updated on  10.05.2021
Most recent event   Tooltip20.06.2024Withdrawal of applicationpublished on 24.07.2024  [2024/30]
Applicant(s)For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
[2022/36]
Inventor(s)01 / FU, Zhe
No. 18, Haibin Road, Wusha, Chang' an
Dongguan, Guangdong 523860 / CN
 [2022/36]
Representative(s)Novagraaf Technologies
Bâtiment O2
2, rue Sarah Bernhardt
CS90017
92665 Asnières-sur-Seine Cedex / FR
[2022/36]
Application number, filing date19951215.301.11.2019
[2022/36]
WO2019CN115144
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021082009
Date:06.05.2021
Language:ZH
[2021/18]
Type: A1 Application with search report 
No.:EP4054232
Date:07.09.2022
Language:EN
[2022/36]
Search report(s)International search report - published on:CN06.05.2021
(Supplementary) European search report - dispatched on:EP11.10.2022
ClassificationIPC:H04W24/10, H04W36/30, H04W72/04, H04B7/185, H04W36/00
[2022/45]
CPC:
H04W36/0094 (EP); H04W24/08 (US); H04B7/1853 (EP);
H04W24/10 (US); H04W56/0015 (EP)
Former IPC [2022/36]H04W24/10, H04W36/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/36]
TitleGerman:ZELLENMESSVERFAHREN, ENDGERÄT UND NETZWERKVORRICHTUNG[2022/36]
English:CELL MEASUREMENT METHOD, TERMINAL DEVICE, AND NETWORK DEVICE[2022/36]
French:PROCÉDÉ DE MESURE DE CELLULE, DISPOSITIF TERMINAL, ET DISPOSITIF DE RÉSEAU[2022/36]
Entry into regional phase25.05.2022Translation filed 
25.05.2022National basic fee paid 
25.05.2022Search fee paid 
25.05.2022Designation fee(s) paid 
25.05.2022Examination fee paid 
Examination procedure25.05.2022Examination requested  [2022/36]
19.04.2023Amendment by applicant (claims and/or description)
19.04.2023Date on which the examining division has become responsible
14.06.2024Application withdrawn by applicant  [2024/30]
Fees paidRenewal fee
25.05.2022Renewal fee patent year 03
22.11.2022Renewal fee patent year 04
20.11.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[YA]WO2019160266  (LG ELECTRONICS INC [KR]) [Y] 6,13 * paragraph [0050] - paragraph [0084]; figures 1-3 * [A] 1-5,7-12,14,15;
 [XY]US2019306734  (HUANG DINHWA [TW], et al) [X] 1,2,4,8-10,14,15 * paragraph [0029] - paragraph [0095]; figures 1-6 * [Y] 3,5-7,11-13;
 [A]WO2019193125  (ERICSSON TELEFON AB L M [SE]) [A] 1-15* page 6, line 14 - page 29, line 18; figures 1-8 *;
 [YA]  - CATT, "Measurement Issues for NTN System", vol. RAN WG2, no. Chongqing, P.R.China; 20191014 - 20191018, (20191003), 3GPP DRAFT; R2-1912157 MEASUREMENT ISSUES FOR NTN SYSTEM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_107bis/Docs/R2-1912157.zip R2-1912157 Measurement Issues for NTN System.docx, (20191003), XP051803772 [Y] 3,5,7,11,12 * the whole document * [A] 1,2,4,6,8-10,13-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.