blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4080477

EP4080477 - EARTHQUAKE EARLY-WARNING AND MONITORING SYSTEM AND METHOD FOR NUCLEAR POWER PLANT [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  23.09.2022
Database last updated on 03.09.2024
FormerThe international publication has been made
Status updated on  29.05.2021
Most recent event   Tooltip24.08.2024Amendment by applicant 
Applicant(s)For all designated states
China Nuclear Power Engineering Co., Ltd.
Engineering Company Office Building
Daya Bay Nuclear Power Base
Pengfei Road
Dapeng New District
Shenzhen, Guangdong 518124 / CN
For all designated states
China General Nuclear Power Corporation
33 Floor, South Building
CGN Tower
2002, Shennan Boulevard
Futian District
Shenzhen, Guangdong 518026 / CN
For all designated states
CGN Power Co., Ltd.
18 Floor, South Building of China Guangdong
Nuclear Building No. 2002
Shennan Avenue
Futian District
Shenzhen, Guangdong 518026 / CN
[2022/43]
Inventor(s)01 / LI, Lei
Building 2, Tian'an Digital Pioneer Park, No. 441
Longcheng Street, Longgang District
Shenzhen, Guangdong 518100 / CN
02 / LIU, Hong tao
Building 2, Tian'an Digital Pioneer Park, No. 441
Longcheng Street, Longgang District
Shenzhen, Guangdong 518100 / CN
03 / LI, Tianyou
Building 2, Tian'an Digital Pioneer Park, No. 441
Longcheng Street, Longgang District
Shenzhen, Guangdong 518100 / CN
04 / TIAN, Yajie
Building 2, Tian'an Digital Pioneer Park, No. 441
Longcheng Street, Longgang District
Shenzhen, Guangdong 518100 / CN
 [2022/43]
Representative(s)Greaves Brewster LLP
Copa House
Station Road
Cheddar, Somerset BS27 3AH / GB
[2022/43]
Application number, filing date19953597.229.11.2019
[2022/43]
WO2019CN121839
Priority number, dateCN20191112693518.11.2019         Original published format: CN201911126935
[2022/43]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021097897
Date:27.05.2021
Language:ZH
[2021/21]
Type: A1 Application with search report 
No.:EP4080477
Date:26.10.2022
Language:EN
[2022/43]
Search report(s)International search report - published on:CN27.05.2021
(Supplementary) European search report - dispatched on:EP06.02.2024
ClassificationIPC:G08B21/10, G08B27/00, G08B25/00, G08B25/14, // G01V1/00
[2024/10]
CPC:
G08B21/10 (EP,CN); G01V1/01 (EP,CN); G08B25/002 (EP);
G08B25/14 (EP); G08B27/00 (EP)
Former IPC [2022/43]G08B21/10, G01V1/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/43]
TitleGerman:ERDBEBENFRÜHWARN- UND ÜBERWACHUNGSSYSTEM UND VERFAHREN FÜR ATOMKRAFTWERK[2022/43]
English:EARTHQUAKE EARLY-WARNING AND MONITORING SYSTEM AND METHOD FOR NUCLEAR POWER PLANT[2022/43]
French:SYSTÈME ET PROCÉDÉ D'ALERTE PRÉCOCE ET DE SURVEILLANCE DE TREMBLEMENT DE TERRE POUR CENTRALE NUCLÉAIRE[2022/43]
Entry into regional phase06.09.2022Translation filed 
17.06.2022National basic fee paid 
17.06.2022Search fee paid 
17.06.2022Designation fee(s) paid 
17.06.2022Examination fee paid 
Examination proceduredeletedDeletion: Application deemed to be withdrawn, date of legal effect  [2022/43]
17.06.2022Examination requested  [2022/43]
07.07.2022Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time  [2022/43]
22.08.2024Amendment by applicant (claims and/or description)
22.08.2024Date on which the examining division has become responsible
Request for further processing for:The application is deemed to be withdrawn due to failure to file the translation
06.09.2022Request for further processing filed
06.09.2022Full payment received (date of receipt of payment)
Request granted
15.09.2022Decision despatched
Fees paidRenewal fee
17.06.2022Renewal fee patent year 03
24.11.2022Renewal fee patent year 04
24.11.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]CN107462919  (GUANGDONG NUCLEAR POWER JOINT VENTURE, et al) [A] 1,9,10,13* paragraphs [0002] , [0004] , [0007] , [0009] , [0011] , [0012] , [0024] , [0028] *;
 [I]KR101957763B  (KOREA INST GEOSCIENCE & MINERAL RESOURCES KIGAM [KR]) [I] 1-17 * paragraphs [0002] - [0005] - [0008] - [0012] - [0034] - [0042] - [0050] - [0079] - [0085] - [0093] - [0106] - [0116]; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.