EP3771869 - GAS DISCHARGE SYSTEM COMPRISING AT LEAST ONE VORTEX TUBE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 23.01.2023 | ||
Former | Examination is in progress Status updated on 01.07.2022 | ||
Former | Request for examination was made Status updated on 14.05.2021 | ||
Former | The application has been published Status updated on 01.01.2021 | ||
Former | unknown Status updated on 03.09.2020 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): FR | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states Ontras Gastransport GmbH Maximilianallee 4 04129 Leipzig / DE | [2021/05] | Inventor(s) | 01 /
Päßler, Steffen Scheunhornweg 46 14542 Werder / DE | 02 /
Skorzus, Karsten Bahnweg 6 08280 Aue / DE | [2021/05] | Representative(s) | Castell, Klaus Patentanwaltskanzlei Liermann-Castell Oberstraße 135 52349 Düren / DE | [2023/23] |
Former [2021/05] | Castell, Klaus Patentanwaltskanzlei Liermann-Castell Am Rurufer 2 52349 Düren / DE | Application number, filing date | 20020320.6 | 10.07.2020 | [2021/05] | Priority number, date | DE201910120358 | 29.07.2019 Original published format: DE102019120358 | [2021/05] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3771869 | Date: | 03.02.2021 | Language: | DE | [2021/05] | Type: | B1 Patent specification | No.: | EP3771869 | Date: | 07.06.2023 | Language: | DE | [2023/23] | Type: | B8 Corrected title page of specification | No.: | EP3771869 | Date: | 23.08.2023 | [2023/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.12.2020 | Classification | IPC: | F25B9/04, F17C7/00, F17D1/02, F28F27/00 | [2021/05] | CPC: |
F28F27/00 (EP);
F17D1/02 (EP);
F25B9/04 (EP);
F25B2309/022 (EP);
F28D2021/0047 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/24] |
Former [2021/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GASENTSPANNUNGSANLAGE MIT MINDESTENS EINEM WIRBELROHR | [2023/33] | English: | GAS DISCHARGE SYSTEM COMPRISING AT LEAST ONE VORTEX TUBE | [2021/05] | French: | INSTALLATION DE DÉTENTE DE GAZ COMPRENANT AU MOINS UN TUBE À TURBILLON | [2021/05] |
Former [2021/05] | GASENTSPANNUNGSANLAGE MIT MINDESTENS EINEM WIRBELROHR | Examination procedure | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2021/05] | 04.09.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2021/05] | 07.05.2021 | Examination requested [2021/24] | 07.05.2021 | Date on which the examining division has become responsible | 02.08.2021 | Amendment by applicant (claims and/or description) | 30.06.2022 | Despatch of a communication from the examining division (Time limit: M04) | 15.08.2022 | Reply to a communication from the examining division | 24.01.2023 | Communication of intention to grant the patent | 22.03.2023 | Fee for grant paid | 22.03.2023 | Fee for publishing/printing paid | 28.04.2023 | Receipt of the translation of the claim(s) | 07.07.2023 | Request for correction of the decision to grant filed | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Request for further processing for: | 10.09.2020 | Request for further processing filed | 10.09.2020 | Full payment received (date of receipt of payment) Request granted | 22.09.2020 | Decision despatched | Fees paid | Renewal fee | 20.07.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | NL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | CZ | 10.07.2023 | IE | 10.07.2023 | LU | 10.07.2023 | BE | 31.07.2023 | FR | 07.08.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | [2024/34] |
Former [2024/33] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
CZ | 10.07.2023 | ||
IE | 10.07.2023 | ||
LU | 10.07.2023 | ||
BE | 31.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/26] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
CZ | 10.07.2023 | ||
LU | 10.07.2023 | ||
BE | 31.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/25] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
CZ | 10.07.2023 | ||
LU | 10.07.2023 | ||
BE | 31.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/23] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
CZ | 10.07.2023 | ||
LU | 10.07.2023 | ||
BE | 31.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/18] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
LU | 10.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/16] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | EE | 07.06.2023 | |
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/52] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Documents cited: | Search | [XAY]US3672179 (FOSTER-PEGG RICHARD W) [X] 1,8 * the whole document * [A] 2,3 [Y] 6; | [YD]US5911740 (TUNKEL LEV [US], et al) [YD] 6 * column 2, lines 23-50; figures 1-4 *; | [A]DE102010033124 (DAIMLER AG [DE]) [A] 1-10* the whole document *; | [X]CN202791341U (TIANJIN MACHINERY MFG BRANCH BITUO E COMMERCE CO LTD) [X] 1,8 * abstract *; | [XA]CN104165269 (CHINA PETROLEUM & CHEMICAL, et al) [X] 1,3,8 * abstract * [A] 2,4,5; | [XAY]CN107990145 (UNIV DALIAN TECH) [X] 1,7,8,10 * abstract * * paragraphs [0027] - [0030] * [A] 3-6,9 [Y] 2; | [Y] - ATTALLA M ET AL, "Experimental investigation for thermal performance of series and parallel Ranque-Hilsch vortex tube systems", APPLIED THERMAL ENGINEERING, PERGAMON, OXFORD, GB, (20170518), vol. 123, doi:10.1016/J.APPLTHERMALENG.2017.05.084, ISSN 1359-4311, pages 327 - 339, XP085124824 [Y] 2 * the whole document * DOI: http://dx.doi.org/10.1016/j.applthermaleng.2017.05.084 | by applicant | US5911740 | WO2011031576 |