EP3840155 - FLOOR FLUSH MOUNTED BOX FOR ELECTRICAL CONNECTIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 08.12.2021 | ||
Former | Request for examination was made Status updated on 06.08.2021 | ||
Former | The application has been published Status updated on 21.05.2021 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states PUK Group GmbH & Co. KG Nobelstraße 45-55 12057 Berlin / DE | [2021/25] | Inventor(s) | 01 /
* * * | [2021/25] | Representative(s) | Jungblut & Seuss Patentanwälte Wittestraße 30J 13509 Berlin / DE | [2022/19] |
Former [2021/25] | Jungblut & Seuss Patentanwälte Max-Dohrn-Strasse 10 10589 Berlin / DE | Application number, filing date | 20020619.1 | 15.12.2020 | [2021/25] | Priority number, date | DE20191008682 | 16.12.2019 Original published format: DE102019008682 | [2021/25] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3840155 | Date: | 23.06.2021 | Language: | DE | [2021/25] | Type: | B1 Patent specification | No.: | EP3840155 | Date: | 11.05.2022 | Language: | DE | [2022/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.05.2021 | Classification | IPC: | H02G3/18, // H02G3/08, H02G3/14 | [2021/25] | CPC: |
H02G3/185 (EP);
H02G3/086 (EP);
H02G3/14 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/36] |
Former [2021/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BODENEINBAUEINHEIT FÜR ELEKTRISCHE ANSCHLÜSSE | [2021/25] | English: | FLOOR FLUSH MOUNTED BOX FOR ELECTRICAL CONNECTIONS | [2021/25] | French: | BOÎTE D'ENCASTREMENT AU SOL POUR LES CONNEXIONS ÉLECTRIQUES | [2021/25] | Examination procedure | 03.08.2021 | Examination requested [2021/36] | 03.08.2021 | Date on which the examining division has become responsible | 09.12.2021 | Communication of intention to grant the patent | 18.03.2022 | Receipt of the translation of the claim(s) | 31.03.2022 | Fee for grant paid | 31.03.2022 | Fee for publishing/printing paid | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 11.05.2022 | CY | 11.05.2022 | CZ | 11.05.2022 | DK | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | IT | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | MK | 11.05.2022 | MT | 11.05.2022 | RO | 11.05.2022 | RS | 11.05.2022 | SE | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | SM | 11.05.2022 | TR | 11.05.2022 | BG | 11.08.2022 | NO | 11.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | IE | 15.12.2022 | FR | 31.12.2022 | [2024/44] |
Former [2024/29] | AL | 11.05.2022 | |
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
MK | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
TR | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
FR | 31.12.2022 | ||
Former [2024/27] | AL | 11.05.2022 | |
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MK | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
FR | 31.12.2022 | ||
Former [2024/21] | AL | 11.05.2022 | |
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
FR | 31.12.2022 | ||
Former [2024/11] | AL | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
FR | 31.12.2022 | ||
Former [2023/52] | AL | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
FR | 31.12.2022 | ||
Former [2023/48] | AL | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 15.12.2022 | ||
Former [2023/25] | AL | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/17] | AL | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/08] | DK | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/07] | DK | 11.05.2022 | |
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | FI | 11.05.2022 | |
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | FI | 11.05.2022 | |
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | FI | 11.05.2022 | |
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | FI | 11.05.2022 | |
LT | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Documents cited: | Search | [A]US2003109172 (FODEN GLEN [CA], et al) [A] 1-10 * figures 1-4 ** paragraph [0022] - paragraph [0028] *; | [A]EP2541707 (BETTERMANN OBO GMBH & CO KG [DE]) [A] 1-10 * figures 3-7 * * paragraph [0029] - paragraph [0038] *; | [A]EP3331115 (PUK GROUP GMBH & CO KG [DE]) [A] 1-10 * figures 1-3 * * paragraph [0029] - paragraph [0032] * | by applicant | EP1376805 | EP2101385 |