blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3677758

EP3677758 - EXHAUST GAS TREATMENT SYSTEM AND METHOD WITH IMPROVED REGENERATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.02.2023
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  25.02.2022
FormerGrant of patent is intended
Status updated on  06.12.2021
FormerExamination is in progress
Status updated on  25.06.2021
FormerRequest for examination was made
Status updated on  23.04.2021
FormerThe application has been published
Status updated on  05.06.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Deere & Company
One John Deere Place
Moline, IL 61265 / US
[2020/28]
Inventor(s)01 / Huang, Shyan-Cherng
John Deere Product Engineering Center
6725 Cedar Heights Drive
Cedar Falls, IA 50613 / US
02 / Dou, Danan
John Deere Product Engineering Center
6725 Cedar Heights Drive
Cedar Falls, IA 50613 / US
03 / Hruby, Eric. J
John Deere Product Engineering Center
6725 Cedar Heights Drive
Cedar Falls, IA 50613 / US
 [2020/33]
Former [2020/28]01 / Huang, Shyan-Cherng
c/o John Deere Waterloo Product Engineering Center
6725 Cedar Heights Drive
Waterloo, IA Iowa 50613 / US
02 / Dou, Danan
c/o John Deere Waterloo Product Engineering Center
6725 Cedar Heights Drive
Waterloo, IA Iowa 50613 / US
03 / Hruby, Eric. J
c/o John Deere Waterloo Product Engineering Center
6725 Cedar Heights Drive
Waterloo, IA Iowa 50613 / US
Representative(s)Millburn, Julie Elizabeth, et al
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[2022/13]
Former [2020/28]Robson, Aidan John
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
Application number, filing date20150192.103.01.2020
[2020/28]
Priority number, dateUS20191623924703.01.2019         Original published format: US201916239247
[2020/28]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3677758
Date:08.07.2020
Language:EN
[2020/28]
Type: A3 Search report 
No.:EP3677758
Date:21.10.2020
Language:EN
[2020/43]
Type: B1 Patent specification 
No.:EP3677758
Date:30.03.2022
Language:EN
[2022/13]
Search report(s)(Supplementary) European search report - dispatched on:EP23.09.2020
ClassificationIPC:F01N3/021, F01N3/023, F01N9/00, F01N3/10, F01N3/035, F01N3/025, F01N3/20, F01N3/027
[2020/28]
CPC:
F01N3/021 (EP); F01N9/002 (EP,US); B01D46/82 (US);
F01N3/023 (EP); F01N3/025 (EP); F01N3/0253 (US);
F01N3/027 (EP,US); F01N3/035 (EP,US); F01N3/10 (EP);
F01N3/103 (EP); F01N3/20 (EP); F01N3/2066 (EP);
F01N9/00 (EP); B01D2279/30 (US); B01D46/0027 (US);
B01D53/9431 (US); B01D53/9454 (US); F01N2340/06 (EP);
F01N2510/0682 (EP,US); F01N2590/08 (EP); F01N2610/02 (EP);
F01N2900/1404 (EP,US); Y02T10/12 (EP); Y02T10/40 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/21]
Former [2020/28]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABGASBEHANDLUNGSSYSTEM UND -VERFAHREN MIT VERBESSERTER REGENERATION[2020/28]
English:EXHAUST GAS TREATMENT SYSTEM AND METHOD WITH IMPROVED REGENERATION[2020/28]
French:SYSTÈME ET PROCÉDÉ DE TRAITEMENT DE GAZ D'ÉCHAPPEMENT À RÉGÉNÉRATION AMÉLIORÉE[2020/28]
Examination procedure19.04.2021Amendment by applicant (claims and/or description)
19.04.2021Examination requested  [2021/21]
19.04.2021Date on which the examining division has become responsible
25.06.2021Despatch of a communication from the examining division (Time limit: M04)
29.09.2021Reply to a communication from the examining division
07.12.2021Communication of intention to grant the patent
22.02.2022Fee for grant paid
22.02.2022Fee for publishing/printing paid
22.02.2022Receipt of the translation of the claim(s)
Opposition(s)03.01.2023No opposition filed within time limit [2023/10]
Fees paidRenewal fee
17.12.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL30.03.2022
AT30.03.2022
CZ30.03.2022
DK30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
IT30.03.2022
LT30.03.2022
LV30.03.2022
MC30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SI30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
[2024/29]
Former [2023/35]AL30.03.2022
AT30.03.2022
CZ30.03.2022
DK30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
IT30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SI30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
Former [2023/25]AL30.03.2022
AT30.03.2022
CZ30.03.2022
DK30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SI30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
Former [2023/07]AL30.03.2022
AT30.03.2022
CZ30.03.2022
DK30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
Former [2023/01]AL30.03.2022
AT30.03.2022
CZ30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
Former [2022/51]AT30.03.2022
CZ30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
IS30.07.2022
PT01.08.2022
Former [2022/50]AT30.03.2022
CZ30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
PL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
PT01.08.2022
Former [2022/49]AT30.03.2022
CZ30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SK30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
PT01.08.2022
Former [2022/48]AT30.03.2022
CZ30.03.2022
EE30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
PT01.08.2022
Former [2022/47]AT30.03.2022
ES30.03.2022
FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
RO30.03.2022
RS30.03.2022
SE30.03.2022
SM30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
PT01.08.2022
Former [2022/44]FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
NL30.03.2022
RS30.03.2022
SE30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
Former [2022/39]FI30.03.2022
HR30.03.2022
LT30.03.2022
LV30.03.2022
RS30.03.2022
SE30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
Former [2022/36]HR30.03.2022
LT30.03.2022
LV30.03.2022
RS30.03.2022
SE30.03.2022
BG30.06.2022
NO30.06.2022
GR01.07.2022
Former [2022/35]HR30.03.2022
LT30.03.2022
RS30.03.2022
SE30.03.2022
BG30.06.2022
NO30.06.2022
Former [2022/33]LT30.03.2022
NO30.06.2022
Documents cited:Search[XI]WO2012105890  (SCANIA CV AB [SE], et al) [X] 1-3,5,6,8,9,15 * page 5, line 5 - line 7 * * page 7, line 19 - line 28 * * page 9, line 27 - line 28 * * page 13, line 1 - page 14, line 27 * * page 15, line 33 - page 16, line 3 * * page 17, line 13 - line 14 * * page 22, line 8 - line 9 * * claims 1,2,6,8,9,15 * * figures 2,5,6,7 * [I] 7;
 [XI]DE102018106420  (FORD GLOBAL TECH LLC [US]) [X] 1,3-6,8 * paragraphs [0049] , [0 58] * * claims 1,12,14-16,20,21 * * figures 1, 3b * [I] 7,9;
 [XI]EP3199220  (TOYOTA MOTOR CO LTD [JP]) [X] 1,3,5-7,10 * paragraphs [0021] , [0 26] , [0 29] * * claim 1 * * figures 1,5 * [I] 8
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.