blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3683419

EP3683419 - INTEGRATED COOLING AIR BOOST COMPRESSOR AND FUEL PUMP [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  29.03.2024
Database last updated on 22.08.2024
FormerGrant of patent is intended
Status updated on  26.11.2023
FormerExamination is in progress
Status updated on  08.04.2022
FormerRequest for examination was made
Status updated on  22.01.2021
FormerThe application has been published
Status updated on  19.06.2020
Most recent event   Tooltip29.03.2024(Expected) grantpublished on 01.05.2024  [2024/18]
Applicant(s)For all designated states
RTX Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2023/44]
Former [2021/12]For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Former [2020/30]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / HERRING, Neal R.
53 Wangonk Trail
East Hampton, CT Connecticut 06424 / US
 [2020/30]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2020/30]
Application number, filing date20152559.917.01.2020
[2020/30]
Priority number, dateUS201962793441P17.01.2019         Original published format: US 201962793441 P
[2020/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3683419
Date:22.07.2020
Language:EN
[2020/30]
Type: B1 Patent specification 
No.:EP3683419
Date:01.05.2024
Language:EN
[2024/18]
Search report(s)(Supplementary) European search report - dispatched on:EP15.06.2020
ClassificationIPC:F02C6/08, F02C7/22, F02C7/32
[2020/30]
CPC:
F02C6/08 (EP); F02C9/44 (US); F02C3/04 (US);
F02C7/22 (EP); F02C7/32 (EP)
C-Set:
F02C7/236, F02C6/08 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/08]
Former [2020/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:INTEGRIERTER KÜHLLUFT-BOOSTVERDICHTER UND KRAFTSTOFFPUMPE[2020/30]
English:INTEGRATED COOLING AIR BOOST COMPRESSOR AND FUEL PUMP[2020/30]
French:COMPRESSEUR À SURPRESSION D'AIR DE REFROIDISSEMENT INTÉGRÉ ET POMPE À CARBURANT[2020/30]
Examination procedure20.01.2021Amendment by applicant (claims and/or description)
20.01.2021Examination requested  [2021/08]
20.01.2021Date on which the examining division has become responsible
12.04.2022Despatch of a communication from the examining division (Time limit: M06)
19.10.2022Reply to a communication from the examining division
27.11.2023Communication of intention to grant the patent
25.03.2024Fee for grant paid
25.03.2024Fee for publishing/printing paid
25.03.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
20.01.2022Renewal fee patent year 03
19.01.2023Renewal fee patent year 04
23.01.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I]US2970437  (ANDERSON ROBERT J) [I] 1,4,5,7-9 * figure 1 *;
 [Y]US5392614  (COFFINBERRY GEORGE A [US]) [Y] 1-9 * figures 1, 2, 9 * * paragraph [0001] *;
 [Y]US2010003148  (DELDALLE REGIS MICHEL PAUL [FR]) [Y] 1-9 * figure 1 *;
 [A]DE102012207574  (TGE GAS ENGINEERING GMBH [DE]) [A] 1* figures 1, 2 *;
 [XI]US2015275769  (FOUTCH DAVID W [US], et al) [X] 1,6 * figure 2 * * paragraph [0048] * [I] 4,5,7-9
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.