EP3855390 - METHOD FOR GENERATING INFORMATION FROM AT LEAST ONE CAMERA IMAGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2024 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 14.12.2022 | ||
Former | Request for examination was made Status updated on 28.01.2022 | ||
Former | The application has been published Status updated on 25.06.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastr. 27c 80686 München / DE | [2022/16] |
Former [2021/30] | For all designated states FRAUNHOFER-GESELLSCHAFT zur Förderung der angewandten Forschung e.V. Hansastraße 27c 80686 München / DE | Inventor(s) | 01 /
Seyler, Tobias Edith-Stein-Straße 9 79110 Freiburg / DE | 02 /
Beckmann, Tobias Lerchenstraße 49 79211 Denzlingen / DE | [2021/30] | Representative(s) | WSL Patentanwälte Partnerschaft mbB Kaiser-Friedrich-Ring 98 65185 Wiesbaden / DE | [2021/30] | Application number, filing date | 20153587.9 | 24.01.2020 | [2021/30] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3855390 | Date: | 28.07.2021 | Language: | DE | [2021/30] | Type: | B1 Patent specification | No.: | EP3855390 | Date: | 26.04.2023 | Language: | DE | [2023/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.06.2020 | Classification | IPC: | G06T7/00, G03H1/00 | [2021/30] | CPC: |
G06T7/0002 (EP,KR,US);
G06T7/97 (KR);
G03H1/0443 (EP,US);
G03H1/0465 (US);
G03H1/0866 (EP);
G03H1/22 (KR);
H04N23/80 (EP,KR,US);
H04N5/77 (KR);
G03H1/2645 (EP);
G03H2001/0458 (EP);
G03H2001/266 (EP);
G03H2222/13 (US);
G03H2226/11 (EP);
G03H2240/11 (US);
G06T2207/10016 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/09] |
Former [2021/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM ERZEUGEN EINER INFORMATION AUS MINDESTENS EINEM KAMERABILD | [2021/30] | English: | METHOD FOR GENERATING INFORMATION FROM AT LEAST ONE CAMERA IMAGE | [2021/30] | French: | PROCÉDÉ DE GÉNÉRATION DES INFORMATIONS À PARTIR D'AU MOINS UNE IMAGE DE CAMÉRA | [2021/30] | Examination procedure | 25.01.2022 | Examination requested [2022/09] | 25.01.2022 | Date on which the examining division has become responsible | 28.01.2022 | Amendment by applicant (claims and/or description) | 15.12.2022 | Communication of intention to grant the patent | 14.03.2023 | Fee for grant paid | 14.03.2023 | Fee for publishing/printing paid | 14.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.01.2024 | No opposition filed within time limit [2024/14] | Fees paid | Renewal fee | 14.01.2022 | Renewal fee patent year 03 | 20.01.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 26.04.2023 | CZ | 26.04.2023 | DK | 26.04.2023 | EE | 26.04.2023 | ES | 26.04.2023 | FI | 26.04.2023 | HR | 26.04.2023 | IT | 26.04.2023 | LT | 26.04.2023 | LV | 26.04.2023 | MC | 26.04.2023 | NL | 26.04.2023 | PL | 26.04.2023 | RO | 26.04.2023 | RS | 26.04.2023 | SE | 26.04.2023 | SI | 26.04.2023 | SK | 26.04.2023 | SM | 26.04.2023 | NO | 26.07.2023 | GR | 27.07.2023 | IS | 26.08.2023 | PT | 28.08.2023 | LU | 24.01.2024 | [2024/51] |
Former [2024/43] | CZ | 26.04.2023 | |
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 24.01.2024 | ||
Former [2024/40] | CZ | 26.04.2023 | |
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/26] | CZ | 26.04.2023 | |
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/25] | CZ | 26.04.2023 | |
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/10] | CZ | 26.04.2023 | |
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/08] | ES | 26.04.2023 | |
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/03] | ES | 26.04.2023 | |
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/01] | ES | 26.04.2023 | |
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/51] | ES | 26.04.2023 | |
HR | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/50] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/48] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
PT | 28.08.2023 | ||
Former [2023/46] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PT | 28.08.2023 | ||
Former [2023/43] | NL | 26.04.2023 | Documents cited: | Search | [XAI]US7038787 (PRICE JEFFERY R [US]); | [XA]US2017140144 (BOCK JOEL N [US], et al) |