EP3664296 - TOUCH SENSOR ASSEMBLY AND DOOR INCLUDING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 19.01.2021 | ||
Former | Request for examination was made Status updated on 08.05.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2020/24] | Inventor(s) | 01 /
PARK, Jinseung c/o IP Center, LG Electronics Inc. 51, Gasan digital 1-ro, Geumcheon-gu Seoul 08592 / KR | 02 /
PARK, Seungje c/o IP Center, LG Electronics Inc. 51, Gasan digital 1-ro, Geumcheon-gu Seoul 08592 / KR | [2020/24] | Representative(s) | Ter Meer Steinmeister & Partner Patentanwälte mbB Nymphenburger Straße 4 80335 München / DE | [2020/24] | Application number, filing date | 20153594.5 | 22.12.2015 | [2020/24] | Priority number, date | KR20140188229 | 24.12.2014 Original published format: KR 20140188229 | [2020/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3664296 | Date: | 10.06.2020 | Language: | EN | [2020/24] | Type: | B1 Patent specification | No.: | EP3664296 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.04.2020 | Classification | IPC: | H03K17/96, F25D23/02, F25D29/00 | [2020/24] | CPC: |
F25D23/02 (EP,KR,US);
G06F3/041 (KR,US);
F25D29/003 (CN);
F25D23/028 (CN);
F25D29/005 (EP,CN,US);
H03K17/9643 (EP,US);
F25D2323/02 (CN);
F25D2400/36 (CN);
F25D2700/00 (CN);
H03K2217/96015 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/24] | Title | German: | BERÜHRUNGSSENSORANORDNUNG UND TÜR DAMIT | [2020/24] | English: | TOUCH SENSOR ASSEMBLY AND DOOR INCLUDING THE SAME | [2020/24] | French: | ENSEMBLE CAPTEUR TACTILE ET PORTE COMPORTANT UN TEL DISPOSITIF | [2020/24] | Examination procedure | 24.01.2020 | Examination requested [2020/24] | 26.06.2020 | Amendment by applicant (claims and/or description) | 20.01.2021 | Communication of intention to grant the patent | 14.05.2021 | Fee for grant paid | 14.05.2021 | Fee for publishing/printing paid | 14.05.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15201840.4 / EP3043475 | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 24.01.2020 | Renewal fee patent year 03 | 24.01.2020 | Renewal fee patent year 04 | 24.01.2020 | Renewal fee patent year 05 | 24.12.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2015 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | IE | 22.12.2021 | LU | 22.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | FR | 31.12.2021 | LI | 31.12.2021 | [2024/42] |
Former [2024/29] | HU | 22.12.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
TR | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/23] | HU | 22.12.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/33] | HU | 22.12.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2022/48] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
Former [2022/46] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
LU | 22.12.2021 | ||
Former [2022/33] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/26] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/21] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/11] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/08] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Documents cited: | Search | [YA]DE29722565U (SCHURTER GMBH [DE]) [Y] 1-3,5-11,13-15 * page 4, line 22 - line 27; figure 1 * [A] 4,12; | [YA]WO2007105950 (SWITCH B V D [NL], et al) [Y] 1-3,5-11,13-15 * page 8, lines 1-22; figure 6 * [A] 4,12; | [E]EP3007361 (E G O ELEKTRO GERÄTEBAU GMBH [DE]) [E] 1-3,13,14 * paragraph [0022] - paragraph [0028]; figure 1 * * paragraph [0001] *; | [E]EP3037755 (LG ELECTRONICS INC [KR]) [E] 1-3,5-11,13-15* figures 23,24,34, 16,20,1 * | by applicant | KR100634365B |