blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3705202

EP3705202 - CONVERSION OF A CONTINUOUS CASTING PLANT FOR BILLET OR BLOOM STRANDS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.11.2022
Database last updated on 21.08.2024
FormerThe patent has been granted
Status updated on  17.12.2021
FormerGrant of patent is intended
Status updated on  29.09.2021
FormerExamination is in progress
Status updated on  16.07.2021
FormerRequest for examination was made
Status updated on  12.03.2021
FormerThe application has been published
Status updated on  07.08.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Primetals Technologies Austria GmbH
Turmstraße 44
4031 Linz / AT
[2020/37]
Inventor(s)01 / Burzic, Denijel
Waldmüllergang 5
4020 Linz / DE
02 / Morton, Jeffrey
Kelzendorf 21
4211 Alberndorf i.d. Riedmark / AT
03 / Pühringer, August
Achleiten 1
AT/ 4722 Peuerbach / DE
 [2020/37]
Representative(s)Metals@Linz
Primetals Technologies Austria GmbH
Intellectual Property Upstream IP UP
Turmstraße 44
4031 Linz / AT
[2020/37]
Application number, filing date20153887.327.01.2020
[2020/37]
Priority number, dateAT2019005017306.03.2019         Original published format: AT 501732019
[2020/37]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3705202
Date:09.09.2020
Language:DE
[2020/37]
Type: B1 Patent specification 
No.:EP3705202
Date:19.01.2022
Language:DE
[2022/03]
Search report(s)(Supplementary) European search report - dispatched on:EP08.07.2020
ClassificationIPC:B22D11/12, B21B1/46, B22D11/126, B22D11/128, B22D11/14
[2020/37]
CPC:
B22D11/1206 (EP,CN); B22D11/126 (EP,AT,CN); B22D11/142 (EP,AT,CN);
B21B1/46 (AT); B22D11/043 (CN); B22D11/114 (CN);
B22D11/124 (CN); B22D11/128 (AT); B22D11/1282 (EP,AT);
B22D11/1284 (CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/15]
Former [2020/37]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:UMBAU EINER STRANGGIESSANLAGE FÜR KNÜPPEL- ODER VORBLOCKSTRÄNGE[2020/37]
English:CONVERSION OF A CONTINUOUS CASTING PLANT FOR BILLET OR BLOOM STRANDS[2020/37]
French:TRANSFORMATION D'UNE INSTALLATION DE COULÉE CONTINUE POUR BILLETTES ET BLOOMS[2020/37]
Examination procedure02.03.2021Amendment by applicant (claims and/or description)
09.03.2021Examination requested  [2021/15]
09.03.2021Date on which the examining division has become responsible
16.07.2021Despatch of a communication from the examining division (Time limit: M04)
20.08.2021Reply to a communication from the examining division
30.09.2021Communication of intention to grant the patent
13.12.2021Fee for grant paid
13.12.2021Fee for publishing/printing paid
13.12.2021Receipt of the translation of the claim(s)
Opposition(s)20.10.2022No opposition filed within time limit [2022/52]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.01.2020
AL19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
MK19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
TR19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
[2024/29]
Former [2024/25]HU27.01.2020
AL19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
MK19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2024/23]AL19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
MK19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2024/20]AL19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2023/10]AL19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2023/09]AL19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
IE27.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2023/06]AL19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
LU27.01.2022
BE31.01.2022
FR19.03.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2023/01]AL19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
LU27.01.2022
BE31.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/49]CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
LU27.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/48]CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SM19.01.2022
LU27.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/47]DK19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SM19.01.2022
LU27.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/46]DK19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
LU27.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/42]ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/39]ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
PT19.05.2022
Former [2022/36]ES19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
PT19.05.2022
Former [2022/35]ES19.01.2022
HR19.01.2022
LT19.01.2022
NL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
PT19.05.2022
Former [2022/34]ES19.01.2022
LT19.01.2022
NL19.01.2022
NO19.04.2022
PT19.05.2022
Former [2022/33]LT19.01.2022
NL19.01.2022
NO19.04.2022
Former [2022/31]NL19.01.2022
Documents cited:Search[IA]DE10236368  (SMS DEMAG AG [DE]) [I] 9-13 * abstract * * paragraphs [0001] , [0003] - [0006] - [0040] - [0042] * * figure 1 *[A] 1-8;
 [XA]CH712937  (SMS CONCAST AG [CH]) [X] 9-13 * abstract * * paragraphs [0004] , [0009] - [0013] - [0016] - [0018] * * figures 1,3 * [A] 1-8;
 [I]  - RALF THOME ET AL., "Principles of Billet Soft-reduction and Consequences for Continuous Casting", ISIJ INTERNATIONAL, (20060101), vol. 46, no. 12, pages 1839 - 1844, XP055300002 [I] 1-13 * abstract * * Abschnitte 2, 5 * * figures 2,4 * * page 1839, column left *
 [A]  - PRIOR ART PUBLISHING, (20130802), XP040627496 [A] 1-13 * erster Absatz *

DOI:   http://dx.doi.org/10.4421/PAPDEOTT001962
by applicantWO2009144107
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.