EP3693489 - A COMBUSTOR WALL WITH BOND COAT LAYER AND LAYER OF NETWORKED CERAMIC NANOFIBERS [Right-click to bookmark this link] | |||
Former [2020/33] | ARTICLE WITH BOND COAT LAYER AND LAYER OF NETWORKED CERAMIC NANOFIBERS | ||
[2023/16] | Status | No opposition filed within time limit Status updated on 27.06.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 21.07.2023 | ||
Former | Grant of patent is intended Status updated on 30.03.2023 | ||
Former | Request for examination was made Status updated on 19.02.2021 | ||
Former | The application has been published Status updated on 10.07.2020 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states RTX Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2023/44] |
Former [2021/12] | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | ||
Former [2020/33] | For all designated states United Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | Inventor(s) | 01 /
DING, Zhongfen 30 Bissell Ct. South Windsor, CT 06074 / US | [2023/34] |
Former [2020/33] | 01 /
DING, Zhongfen 30 Bissell Ct. South Windsor, CT Connecticut 06074 / US | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/33] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 20156422.6 | 10.02.2020 | [2020/33] | Priority number, date | US201916270645 | 08.02.2019 Original published format: US201916270645 | [2020/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3693489 | Date: | 12.08.2020 | Language: | EN | [2020/33] | Type: | B1 Patent specification | No.: | EP3693489 | Date: | 23.08.2023 | Language: | EN | [2023/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.05.2020 | Classification | IPC: | C23C4/10, C23C4/11, C23C4/18, C23C24/00, C23C28/00, F01D5/28 | [2020/33] | CPC: |
C23C4/10 (EP);
F23R3/002 (US);
C04B35/10 (US);
C04B35/48 (US);
C04B35/62222 (US);
C04B35/6225 (US);
C23C24/00 (EP);
C23C28/3215 (EP);
C23C28/345 (EP);
C23C28/3455 (EP);
C23C28/36 (EP);
C23C4/11 (EP);
C23C4/18 (EP);
F01D5/288 (EP);
C04B2235/3217 (US);
C04B2235/3244 (US);
C04B2235/5236 (US);
C04B2235/5264 (US);
F02K3/04 (US);
F05D2300/2112 (US);
F05D2300/2118 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/12] |
Former [2020/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BRENNKAMMERWAND MIT EINER HAFTBESCHICHTUNGSLAGE UND EINER LAGE AUS VERNETZTEN KERAMISCHEN NANOFASERN | [2023/16] | English: | A COMBUSTOR WALL WITH BOND COAT LAYER AND LAYER OF NETWORKED CERAMIC NANOFIBERS | [2023/16] | French: | PAROI D'UNE CHAMBRE DE COMBUSTION AVEC UNE COUCHE DE REVÊTEMENT DE LIAISON ET UNE COUCHE DE NANOFIBRES CÉRAMIQUES EN RÉSEAU | [2023/16] |
Former [2020/33] | ARTIKEL MIT HAFTBESCHICHTUNGSLAGE UND LAGE AUS VERNETZTEN KERAMISCHEN NANOFASERN | ||
Former [2020/33] | ARTICLE WITH BOND COAT LAYER AND LAYER OF NETWORKED CERAMIC NANOFIBERS | ||
Former [2020/33] | ARTICLE DOTÉ D'UNE COUCHE DE REVÊTEMENT DE LIAISON ET D'UNE COUCHE DE NANOFIBRES CÉRAMIQUES EN RÉSEAU | Examination procedure | 12.02.2021 | Amendment by applicant (claims and/or description) | 12.02.2021 | Examination requested [2021/12] | 12.02.2021 | Date on which the examining division has become responsible | 31.03.2023 | Communication of intention to grant the patent | 13.07.2023 | Fee for grant paid | 13.07.2023 | Fee for publishing/printing paid | 13.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 24.05.2024 | No opposition filed within time limit [2024/31] | Fees paid | Renewal fee | 17.02.2022 | Renewal fee patent year 03 | 22.02.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 23.08.2023 | BG | 23.08.2023 | CZ | 23.08.2023 | DK | 23.08.2023 | EE | 23.08.2023 | ES | 23.08.2023 | FI | 23.08.2023 | HR | 23.08.2023 | IT | 23.08.2023 | LT | 23.08.2023 | LV | 23.08.2023 | MC | 23.08.2023 | NL | 23.08.2023 | PL | 23.08.2023 | RO | 23.08.2023 | RS | 23.08.2023 | SE | 23.08.2023 | SI | 23.08.2023 | SK | 23.08.2023 | SM | 23.08.2023 | NO | 23.11.2023 | GR | 24.11.2023 | IS | 23.12.2023 | PT | 26.12.2023 | LU | 10.02.2024 | CH | 29.02.2024 | [2024/51] |
Former [2024/48] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
MC | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
LU | 10.02.2024 | ||
CH | 29.02.2024 | ||
Former [2024/47] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
MC | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
LU | 10.02.2024 | ||
Former [2024/45] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
MC | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/36] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/26] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/23] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/22] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/20] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/10] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/09] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
LT | 23.08.2023 | ||
NL | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
Former [2024/08] | LT | 23.08.2023 | |
NL | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | Documents cited: | Search | [Y]EP1939317 (UNITED TECHNOLOGIES CORP [US]) [Y] 9,11,12 * claims 1-11 * * paragraphs [0008] - [0009] ** paragraphs [0014] - [0021] *; | [XAYI]US2017179445 (FETSKO THOMAS E [US], et al) [X] 1-3,6 * paragraphs [0007] , [0027] , [0031] - [0040] - [0043] * * paragraphs [0051] - [0052] - [0056] * * claims 1,3,7-8 * [A] 4,5,9,11-15 [Y] 10 [I] 7,8; | [XAYI]CN108754495 (GUANGDONG INST NEW MAT) [X] 1,4-6 *passages refer to the English translated document* * page 2, paragraph 2. Summary - page 3, paragraph 8 * * page 4, paragraph 3. Detailed ways - page 5, paragraph 4 * * page 7, paragraph 1 - page 8, paragraph 2 * * page 14, paragraph 5. Test case; examples 2-3 * * figure 1; claims 1-2,10 * [A] 2,3,13-15 [Y] 9-12 [I] 7,8 |