| EP3675563 - APPARATUS AND METHOD FOR SUPPORTING NETWORK ENTRY IN A MILLIMETER-WAVE MOBILE BROADBAND COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.11.2022 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 26.11.2021 | ||
| Former | Grant of patent is intended Status updated on 27.07.2021 | ||
| Former | Request for examination was made Status updated on 21.08.2020 | ||
| Former | The application has been published Status updated on 29.05.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129 Samsung-ro Yeongtong-Gu Suwon-Si Gyeonggi-do 16677 / KR | [2020/27] | Inventor(s) | 01 /
Li, Ying 2129 West Campbell Road, Apt. 1136 Dallas County Garland, TX 75044 / US | 02 /
Pi, Zhouyue 1051 Hot Springs Drive Collin County Allen, TX 75013 / US | [2020/27] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2020/27] | Application number, filing date | 20158024.8 | 15.06.2012 | [2020/27] | Priority number, date | US201161498380P | 17.06.2011 Original published format: US 201161498380 P | US201213489397 | 05.06.2012 Original published format: US201213489397 | [2020/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3675563 | Date: | 01.07.2020 | Language: | EN | [2020/27] | Type: | B1 Patent specification | No.: | EP3675563 | Date: | 29.12.2021 | Language: | EN | [2021/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.05.2020 | Classification | IPC: | H04W48/12, // H04W16/28, H04W48/20, H04W72/04, H04W74/00, H04B7/06 | [2020/27] | CPC: |
H04W48/12 (EP,US);
H04B7/0408 (KR);
H04B7/0417 (KR);
H04B7/06952 (EP,KR,US);
H04W36/08 (KR);
H04W36/085 (EP,US);
H04W72/20 (KR);
H04W74/0833 (KR);
H04W88/02 (KR);
H04W88/08 (KR);
H04B7/0619 (EP,US);
H04W16/28 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/39] |
| Former [2020/27] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR UNTERSTÜTZUNG EINER NETZWERKANMELDUNG IN EINEM MOBILEN MILLIMETERWELLENBREITBAND-KOMMUNIKATIONSSYSTEM | [2020/27] | English: | APPARATUS AND METHOD FOR SUPPORTING NETWORK ENTRY IN A MILLIMETER-WAVE MOBILE BROADBAND COMMUNICATION SYSTEM | [2020/27] | French: | APPAREIL ET PROCÉDÉ POUR LA PRISE EN CHARGE D'ENTRÉE DE RÉSEAU DANS UN SYSTÈME DE COMMUNICATION MOBILE À LARGE BANDE ET À ONDES MILLIMÉTRIQUES | [2020/27] | Examination procedure | 17.08.2020 | Examination requested [2020/39] | 17.08.2020 | Date on which the examining division has become responsible | 07.09.2020 | Amendment by applicant (claims and/or description) | 28.07.2021 | Communication of intention to grant the patent | 17.11.2021 | Fee for grant paid | 17.11.2021 | Fee for publishing/printing paid | 17.11.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12800684.8 / EP2721744 | Divisional application(s) | EP21209934.5 / EP3993505 | Opposition(s) | 30.09.2022 | No opposition filed within time limit [2022/49] | Fees paid | Renewal fee | 18.02.2020 | Renewal fee patent year 03 | 18.02.2020 | Renewal fee patent year 04 | 18.02.2020 | Renewal fee patent year 05 | 18.02.2020 | Renewal fee patent year 06 | 18.02.2020 | Renewal fee patent year 07 | 18.02.2020 | Renewal fee patent year 08 | 24.06.2020 | Renewal fee patent year 09 | 23.06.2021 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.06.2012 | AL | 29.12.2021 | AT | 29.12.2021 | CY | 29.12.2021 | CZ | 29.12.2021 | DK | 29.12.2021 | EE | 29.12.2021 | ES | 29.12.2021 | FI | 29.12.2021 | HR | 29.12.2021 | LT | 29.12.2021 | LV | 29.12.2021 | MC | 29.12.2021 | MK | 29.12.2021 | MT | 29.12.2021 | NL | 29.12.2021 | PL | 29.12.2021 | RO | 29.12.2021 | RS | 29.12.2021 | SE | 29.12.2021 | SI | 29.12.2021 | SK | 29.12.2021 | SM | 29.12.2021 | TR | 29.12.2021 | BG | 29.03.2022 | NO | 29.03.2022 | GR | 30.03.2022 | IS | 29.04.2022 | PT | 29.04.2022 | IE | 15.06.2022 | LU | 15.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | FR | 30.06.2022 | LI | 30.06.2022 | [2024/44] |
| Former [2024/29] | HU | 15.06.2012 | |
| AL | 29.12.2021 | ||
| AT | 29.12.2021 | ||
| CY | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| MK | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| TR | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/25] | HU | 15.06.2012 | |
| AL | 29.12.2021 | ||
| AT | 29.12.2021 | ||
| CY | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| MK | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/23] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CY | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| MK | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2024/20] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CY | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/26] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| BE | 30.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/22] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| CH | 30.06.2022 | ||
| FR | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/21] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| LU | 15.06.2022 | ||
| CH | 30.06.2022 | ||
| LI | 30.06.2022 | ||
| Former [2023/20] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| IE | 15.06.2022 | ||
| Former [2023/10] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SI | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| Former [2023/08] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| MC | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/49] | AL | 29.12.2021 | |
| AT | 29.12.2021 | ||
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/46] | AT | 29.12.2021 | |
| CZ | 29.12.2021 | ||
| DK | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/42] | AT | 29.12.2021 | |
| CZ | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| IS | 29.04.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/36] | AT | 29.12.2021 | |
| CZ | 29.12.2021 | ||
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| PL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/35] | CZ | 29.12.2021 | |
| EE | 29.12.2021 | ||
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SK | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/34] | EE | 29.12.2021 | |
| ES | 29.12.2021 | ||
| FI | 29.12.2021 | ||
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| RO | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| PT | 29.04.2022 | ||
| Former [2022/33] | FI | 29.12.2021 | |
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| SM | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| Former [2022/31] | FI | 29.12.2021 | |
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| NL | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| Former [2022/25] | FI | 29.12.2021 | |
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| NO | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| Former [2022/24] | FI | 29.12.2021 | |
| HR | 29.12.2021 | ||
| LT | 29.12.2021 | ||
| LV | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| SE | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| GR | 30.03.2022 | ||
| Former [2022/22] | FI | 29.12.2021 | |
| LT | 29.12.2021 | ||
| RS | 29.12.2021 | ||
| BG | 29.03.2022 | ||
| Former [2022/21] | RS | 29.12.2021 | |
| BG | 29.03.2022 | ||
| Former [2022/19] | BG | 29.03.2022 | Documents cited: | Search | [A] US2011007721 (TAGHAVI NASRABADI MOHAMMAD HOSSEIN et al.) [A] 1-14 * paragraph [0037] - paragraph [0047] * * figure 2 * | [A] ZHOUYUE PI ET AL: "System design and network architecture for a millimeter-wave mobile broadband (MMB) system", SARNOFF SYMPOSIUM, 2011 34TH IEEE, IEEE, 3 May 2011 (2011-05-03), pages 1 - 6, XP031993489, ISBN: 978-1-61284-681-1, DOI: 10.1109/SARNOF.2011.5876444 [A] 1-14 * section I * * section III.A * DOI: http://dx.doi.org/10.1109/SARNOF.2011.5876444 | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 10)", 3GPP STANDARD; 3GPP TS 36.300, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. V10.3.0, 5 April 2011 (2011-04-05), pages 1 - 197, XP050477175 [A] 1-14 * paragraph 10.1.5.1 * * Figure 10.1.5.1-1 * | [A] "IEEE Standard for Local and metropolitan area networks Part 16: Air Interface for Broadband Wireless Access Systems;IEEE Std 802.16-2009 (Revision of IEEE Std 802.16-2004)", STANDARD NO.: IEEE STD 802.16-2009 (2009) - 29 MAY 2009, IEEE, NEW YORK, NY, USA, 29 May 2009 (2009-05-29), pages 1 - 2080, XP068045637, ISBN: 978-0-7381-5919-5 [A] 1-14 * paragraph 6.3.2.3.36 * * paragraph 6.3.7.6.1 * * paragraph 6.3.7.6.3 * * paragraph 6.3.7.6.4 * * paragraph 6.3.9.5.1 * * Table 178 * * paragraph 8.3.7.2.1 * * Table 304 * * paragraph 6.3.2.4.49 * * table 152 * | [A] "Standard ECMA-387 High Rate 60 GHz PHY, MAC and PALs", 1 December 2010 (2010-12-01), pages 1 - 302, XP055183698, Retrieved from the Internet |