EP3868211 - DEVICE AND METHOD FOR PRODUCING COEXTRUDED PRODUCTS WITH VARIABLE THICKNESS OF CASING MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2024 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 27.02.2023 | ||
Former | Examination is in progress Status updated on 20.10.2022 | ||
Former | Request for examination was made Status updated on 28.01.2022 | ||
Former | The application has been published Status updated on 23.07.2021 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Albert Handtmann Maschinenfabrik GmbH & Co. KG Hubertus-Liebrecht-Strasse 10-12 88400 Biberach / DE | [2021/34] | Inventor(s) | 01 /
Schliesser, Markus Auf der Bausch 15-1 88489 Wain / DE | 02 /
Baechtle, Manfred Brandhofstrasse 8 88433 Schemmerhofen / DE | [2021/34] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2021/34] | Application number, filing date | 20158401.8 | 20.02.2020 | [2021/34] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3868211 | Date: | 25.08.2021 | Language: | DE | [2021/34] | Type: | B1 Patent specification | No.: | EP3868211 | Date: | 02.08.2023 | Language: | DE | [2023/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.07.2020 | Classification | IPC: | A22C13/00 | [2021/34] | CPC: |
A22C13/0003 (EP,CN);
A22C11/02 (CN);
A22C11/0254 (US);
A22C11/006 (CN,US);
A22C11/008 (US);
A22C11/0227 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/09] |
Former [2021/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG COEXTRUDIERTER PRODUKTE MIT VERÄNDERBARER DICKE DES HÜLLENMATERIALS | [2021/34] | English: | DEVICE AND METHOD FOR PRODUCING COEXTRUDED PRODUCTS WITH VARIABLE THICKNESS OF CASING MATERIAL | [2021/34] | French: | DISPOSITIF ET PROCÉDÉ DE FABRICATION DE PRODUITS COEXTRUDÉS À ÉPAISSEUR VARIABLE DE LA MATIÈRE D'ENVELOPPE | [2021/34] | Examination procedure | 21.01.2022 | Amendment by applicant (claims and/or description) | 21.01.2022 | Examination requested [2022/09] | 21.01.2022 | Date on which the examining division has become responsible | 19.10.2022 | Despatch of a communication from the examining division (Time limit: M04) | 25.01.2023 | Reply to a communication from the examining division | 28.02.2023 | Communication of intention to grant the patent | 26.06.2023 | Fee for grant paid | 26.06.2023 | Fee for publishing/printing paid | 26.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.05.2024 | No opposition filed within time limit [2024/28] | Fees paid | Renewal fee | 22.02.2022 | Renewal fee patent year 03 | 23.02.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 02.08.2023 | CZ | 02.08.2023 | DK | 02.08.2023 | EE | 02.08.2023 | FI | 02.08.2023 | HR | 02.08.2023 | LT | 02.08.2023 | LV | 02.08.2023 | MC | 02.08.2023 | RO | 02.08.2023 | RS | 02.08.2023 | SE | 02.08.2023 | SI | 02.08.2023 | SK | 02.08.2023 | SM | 02.08.2023 | NO | 02.11.2023 | GR | 03.11.2023 | IS | 02.12.2023 | PT | 04.12.2023 | LU | 20.02.2024 | CH | 29.02.2024 | [2024/51] |
Former [2024/48] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 20.02.2024 | ||
CH | 29.02.2024 | ||
Former [2024/47] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
LU | 20.02.2024 | ||
Former [2024/45] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/36] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/23] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/22] | CZ | 02.08.2023 | |
DK | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/20] | FI | 02.08.2023 | |
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/10] | FI | 02.08.2023 | |
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/09] | FI | 02.08.2023 | |
LT | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/08] | LT | 02.08.2023 | |
NO | 02.11.2023 | ||
GR | 03.11.2023 | Documents cited: | Search | [XI]US2012321752 (VAN DE NIEUWELAAR ADRIANUS JOSEPHES [NL], et al) [X] 1-3,10,12,14 * paragraphs [0022] , [0042]; figures 1-5D * [I] 4-9,11,13,15; | [A]US2014023752 (OUFNAC DAVID S [US], et al) [A] 1-15* paragraph [0031]; figures 2A, 2B * | by applicant | EP1371293 | EP2016830 |