EP3742668 - POWER SOURCING EQUIPMENT, AND METHOD AND APPARATUS FOR POWER OVER ETHERNET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.03.2024 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 21.04.2023 | ||
Former | Grant of patent is intended Status updated on 01.01.2023 | ||
Former | Request for examination was made Status updated on 14.05.2021 | ||
Former | The application has been published Status updated on 23.10.2020 | Most recent event Tooltip | 11.10.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 13.11.2024 [2024/46] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2023/21] |
Former [2020/48] | For all designated states Huawei Technologies Co. Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
HE, Ling c/o Huawei Technologies Co., LTD. Huawei Administration Building, Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2020/48] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | [2023/21] |
Former [2020/48] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 20160351.1 | 11.10.2017 | [2020/48] | Priority number, date | CN201610895985 | 13.10.2016 Original published format: CN201610895985 | [2020/48] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3742668 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Type: | B1 Patent specification | No.: | EP3742668 | Date: | 24.05.2023 | Language: | EN | [2023/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.10.2020 | Classification | IPC: | H04L12/10, H04L12/40 | [2020/48] | CPC: |
H04L12/10 (EP,CN,US);
G05B7/02 (US);
G06F1/26 (US);
H04L12/12 (CN,US);
H04L12/40045 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/24] |
Former [2020/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STROMQUELLENAUSRÜSTUNG SOWIE VERFAHREN UND VORRICHTUNG FÜR STROM-ÜBER-ETHERNET | [2020/48] | English: | POWER SOURCING EQUIPMENT, AND METHOD AND APPARATUS FOR POWER OVER ETHERNET | [2020/48] | French: | ÉQUIPEMENT DE FOURNITURE D'ÉNERGIE ET PROCÉDÉ ET APPAREIL D'ALIMENTATION ÉLECTRIQUE PAR CÂBLE ETHERNET | [2020/48] | Examination procedure | 06.05.2021 | Amendment by applicant (claims and/or description) | 06.05.2021 | Examination requested [2021/24] | 06.05.2021 | Date on which the examining division has become responsible | 02.01.2023 | Communication of intention to grant the patent | 14.04.2023 | Fee for grant paid | 14.04.2023 | Fee for publishing/printing paid | 14.04.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17196006.5 / EP3309998 | Opposition(s) | 27.02.2024 | No opposition filed within time limit [2024/18] | Fees paid | Renewal fee | 02.03.2020 | Renewal fee patent year 03 | 30.10.2020 | Renewal fee patent year 04 | 29.10.2021 | Renewal fee patent year 05 | 31.10.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 24.05.2023 | CZ | 24.05.2023 | DK | 24.05.2023 | EE | 24.05.2023 | ES | 24.05.2023 | FI | 24.05.2023 | HR | 24.05.2023 | LT | 24.05.2023 | LV | 24.05.2023 | MC | 24.05.2023 | NL | 24.05.2023 | PL | 24.05.2023 | RO | 24.05.2023 | RS | 24.05.2023 | SE | 24.05.2023 | SI | 24.05.2023 | SK | 24.05.2023 | SM | 24.05.2023 | NO | 24.08.2023 | GR | 25.08.2023 | IS | 24.09.2023 | PT | 25.09.2023 | IE | 11.10.2023 | LU | 11.10.2023 | BE | 31.10.2023 | CH | 31.10.2023 | [2024/46] |
Former [2024/36] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
MC | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SI | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
LU | 11.10.2023 | ||
BE | 31.10.2023 | ||
CH | 31.10.2023 | ||
Former [2024/34] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
MC | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SI | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
LU | 11.10.2023 | ||
CH | 31.10.2023 | ||
Former [2024/30] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
MC | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SI | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
LU | 11.10.2023 | ||
Former [2024/28] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
MC | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SI | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2024/25] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SI | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2024/10] | AT | 24.05.2023 | |
CZ | 24.05.2023 | ||
DK | 24.05.2023 | ||
EE | 24.05.2023 | ||
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RO | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2024/08] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
SK | 24.05.2023 | ||
SM | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2024/03] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
FI | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2024/01] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
HR | 24.05.2023 | ||
LT | 24.05.2023 | ||
LV | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2023/51] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
HR | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
RS | 24.05.2023 | ||
SE | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2023/50] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
NL | 24.05.2023 | ||
PL | 24.05.2023 | ||
SE | 24.05.2023 | ||
NO | 24.08.2023 | ||
GR | 25.08.2023 | ||
IS | 24.09.2023 | ||
PT | 25.09.2023 | ||
Former [2023/48] | AT | 24.05.2023 | |
ES | 24.05.2023 | ||
NL | 24.05.2023 | ||
SE | 24.05.2023 | ||
NO | 24.08.2023 | ||
PT | 25.09.2023 | ||
Former [2023/46] | ES | 24.05.2023 | |
PT | 25.09.2023 | Documents cited: | Search | [A]US2006164775 (STINEMAN JOHN A JR [US], et al) [A] 1-15* the whole document *; | [A]US2009327766 (GHOSHAL SAJOL [US], et al) [A] 1-15 * the whole document *; | [A]US2014142765 (GAMMEL JOHN C [US]) [A] 1-15 * the whole document *; | [A]EP2933946 (HUAWEI TECH CO LTD [CN]) [A] 1-15 * abstract *; | [A]US9377794 (DWELLEY DAVID [US], et al) [A] 1-15 * abstract * * column 3, line 5 - column 11, line 23; figures 1-18; claims 1-16 * |