blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3705742

EP3705742 - CONNECTING ROD FOR INTERNAL COMBUSTION ENGINE AND METHOD FOR PRODUCING SAID CONNECTING ROD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.09.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  24.09.2021
FormerGrant of patent is intended
Status updated on  18.05.2021
FormerRequest for examination was made
Status updated on  12.03.2021
FormerThe application has been published
Status updated on  07.08.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Streparava S.p.A. Con Socio Unico
Via Zocco 13
25030 Adro / IT
[2020/37]
Inventor(s)01 / CECCHEL, Silvia
c/o STREPARAVA S.P.A. CON SOCIO UNICO Via Zocco
13
25030 ADRO (BS) / IT
02 / FERRARIO, Davide
c/o STREPARAVA S.P.A. CON SOCIO UNICO Via Zocco
13
25030 ADRO (BS) / IT
03 / MEGA, Francesco
c/o STREPARAVA S.P.A. CON SOCIO UNICO Via Zocco
13
25030 ADRO (BS) / IT
 [2020/37]
Representative(s)Cicchetti, Angelo, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2020/37]
Application number, filing date20161045.804.03.2020
[2020/37]
Priority number, dateIT2019000311104.03.2019         Original published format: IT201900003111
[2020/37]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3705742
Date:09.09.2020
Language:EN
[2020/37]
Type: B1 Patent specification 
No.:EP3705742
Date:27.10.2021
Language:EN
[2021/43]
Search report(s)(Supplementary) European search report - dispatched on:EP04.08.2020
ClassificationIPC:F16C7/02, B33Y80/00
[2020/37]
CPC:
F16C7/023 (EP,US); B22F10/28 (EP,US); B22F5/008 (EP);
B22F5/10 (EP); B22F7/062 (EP); B22F7/08 (EP);
B23K15/0086 (EP); B23K26/342 (EP); B33Y10/00 (EP);
B33Y80/00 (EP); B22F3/17 (EP); F16C2220/24 (EP);
Y02P10/25 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/15]
Former [2020/37]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PLEUELSTANGE FÜR VERBRENNUNGSMOTOR UND HERSTELLUNGSVERFAHREN DER PLEUELSTANGE[2021/21]
English:CONNECTING ROD FOR INTERNAL COMBUSTION ENGINE AND METHOD FOR PRODUCING SAID CONNECTING ROD[2020/37]
French:BIELLE POUR MOTEUR À COMBUSTION INTERNE ET MÉTHODE DE PRODUCTION DE LADITE BIELLE[2021/21]
Former [2020/37]PLEUELSTANGE FÜR VERBRENNUNGSMOTOR UND HERSTELLUNGSVERFAHREN DER PLEUELSTANGE
Former [2020/37]BIELLE POUR MOTEUR À COMBUSTION INTERNE ET MÉTHODE DE PRODUCTION DE LADITE BIELLE
Examination procedure08.03.2021Examination requested  [2021/15]
08.03.2021Date on which the examining division has become responsible
09.03.2021Amendment by applicant (claims and/or description)
19.05.2021Communication of intention to grant the patent
16.09.2021Fee for grant paid
16.09.2021Fee for publishing/printing paid
16.09.2021Receipt of the translation of the claim(s)
Opposition(s)28.07.2022No opposition filed within time limit [2022/40]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.03.2020
AL27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
MK27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
TR27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
BE31.03.2022
FR31.03.2022
[2024/29]
Former [2024/25]HU04.03.2020
AL27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
MK27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
BE31.03.2022
FR31.03.2022
Former [2024/23]AL27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
MK27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
BE31.03.2022
FR31.03.2022
Former [2024/20]AL27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
BE31.03.2022
FR31.03.2022
Former [2023/10]AL27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
BE31.03.2022
FR31.03.2022
Former [2023/08]AL27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
IE04.03.2022
LU04.03.2022
FR31.03.2022
Former [2023/06]AL27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
FR31.03.2022
Former [2023/01]AL27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/49]AL27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/47]CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/35]CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/34]EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/33]ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
SM27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/25]ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/24]ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
BG27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/23]ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
PL27.10.2021
RS27.10.2021
BG27.01.2022
PT28.02.2022
Former [2022/22]FI27.10.2021
LT27.10.2021
RS27.10.2021
BG27.01.2022
Former [2022/21]RS27.10.2021
BG27.01.2022
Former [2022/19]BG27.01.2022
Documents cited:Search[XAI]DE102017120418  (FEV EUROPE GMBH [DE]) [X] 1-5,9-13,15,16 * paragraphs [0001] - [0005] - [00 8] , [0 28] , [ 31] * * figures 2-5, 8-10 * [A] 6-8 [I] 14;
 [XI]US2018216658  (BROWN TYSON W [US], et al) [X] 1,2,4,5,9,11-13,16 * paragraphs [0002] , [0 13] , [0 24] , [0 44] - [0048] - [0 50] , [0 54] , [0 59] , [0 68] , [0 74] - [0076] * * figures 1A, 1G, 1H, 3A, 3B, 4C * [I] 10,14,15;
 [A]FR3062438  (SAFRAN TRANS SYSTEMS [FR]) [A] 1,13-16 * claim 7 ** figure 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.