| EP3709029 - POWER METER WITH MOVABLE TERMINAL BLOCKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.05.2025 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 24.05.2024 | ||
| Former | Grant of patent is intended Status updated on 20.02.2024 | ||
| Former | Examination is in progress Status updated on 16.12.2022 | ||
| Former | Request for examination was made Status updated on 14.08.2020 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): IE | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states Honeywell International Inc. 115 Tabor Road M/S 4D3 P.O.Box 377 Morris Plains, NJ 07950 / US | [2020/38] | Inventor(s) | 01 /
STAUB, Thomas HONEYWELL INTERNATIONAL INC., 115 Tabor Road, M/S 4D3, P. O. Box 377 Morris Plains, NJ 07950 / US | [2024/12] |
| Former [2020/38] | 01 /
STAUB, Thomas HONEYWELL INTERNATIONAL INC., 115 Tabor Road, M/S 4D3, P. O. Box 377 Morris Plains, NJ New Jersey 07950 / US | Representative(s) | Houghton, Mark Phillip Patent Outsourcing Limited 1 King Street Bakewell, Derbyshire DE45 1DZ / GB | [2024/26] |
| Former [2020/38] | Houghton, Mark Phillip Patent Outsourcing Limited Cornerhouse 1 King Street Bakewell Derbyshire DE45 1DZ / GB | Application number, filing date | 20161657.0 | 06.03.2020 | [2020/38] | Priority number, date | US201916299122 | 11.03.2019 Original published format: US201916299122 | [2020/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3709029 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3709029 | Date: | 26.06.2024 | Language: | EN | [2024/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.07.2020 | Classification | IPC: | G01R1/04, G01R11/04, G01R22/06 | [2020/38] | CPC: |
G01R1/04 (EP);
G01R11/04 (EP,US);
G01R1/0416 (EP);
G01R21/06 (US);
G01R22/065 (EP);
G01D4/02 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/38] | Title | German: | LEISTUNGSMESSER MIT BEWEGLICHEN KLEMMENBLÖCKEN | [2020/38] | English: | POWER METER WITH MOVABLE TERMINAL BLOCKS | [2020/38] | French: | WATTMÈTRE COMPORTANT DES BORNIERS MOBILES | [2020/38] | Examination procedure | 06.03.2020 | Examination requested [2020/38] | 15.03.2021 | Amendment by applicant (claims and/or description) | 19.12.2022 | Despatch of a communication from the examining division (Time limit: M04) | 19.04.2023 | Reply to a communication from the examining division | 21.02.2024 | Communication of intention to grant the patent | 22.05.2024 | Fee for grant paid | 22.05.2024 | Fee for publishing/printing paid | 22.05.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 27.03.2025 | No opposition filed within time limit [2025/23] | Fees paid | Renewal fee | 25.03.2022 | Renewal fee patent year 03 | 23.03.2023 | Renewal fee patent year 04 | 26.03.2024 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.06.2024 | BG | 26.06.2024 | CZ | 26.06.2024 | DK | 26.06.2024 | EE | 26.06.2024 | ES | 26.06.2024 | FI | 26.06.2024 | HR | 26.06.2024 | IT | 26.06.2024 | LV | 26.06.2024 | MC | 26.06.2024 | NL | 26.06.2024 | PL | 26.06.2024 | RO | 26.06.2024 | SE | 26.06.2024 | SK | 26.06.2024 | SM | 26.06.2024 | NO | 26.09.2024 | RS | 26.09.2024 | GR | 27.09.2024 | IS | 26.10.2024 | PT | 28.10.2024 | IE | 06.03.2025 | LU | 06.03.2025 | [2026/09] |
| Former [2025/52] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| DK | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| IT | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| MC | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SE | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| LU | 06.03.2025 | ||
| Former [2025/47] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| DK | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| IT | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| MC | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SE | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/42] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| DK | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| IT | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SE | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/21] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| DK | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| IT | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/11] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| IT | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/10] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| CZ | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| ES | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| RO | 26.06.2024 | ||
| SK | 26.06.2024 | ||
| SM | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/09] | AT | 26.06.2024 | |
| BG | 26.06.2024 | ||
| EE | 26.06.2024 | ||
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| IS | 26.10.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/08] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| PL | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| PT | 28.10.2024 | ||
| Former [2025/03] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| PT | 28.10.2024 | ||
| Former [2024/52] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NL | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| Former [2024/49] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| LV | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| RS | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| Former [2024/47] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| NO | 26.09.2024 | ||
| GR | 27.09.2024 | ||
| Former [2024/46] | BG | 26.06.2024 | |
| FI | 26.06.2024 | ||
| HR | 26.06.2024 | ||
| NO | 26.09.2024 | Documents cited: | Search | [I] DE10216913 (HAGER ELECTRO GMBH et al.) [I] 1-15 * paragraphs [0002] , [0042]; figures 1-5; claims 1-10 * | [A] DE2745531 (ALSTHOM CGEE et al.) [A] 1-15 * figures 1,2; claim 1 * | [I] DE202018106082 (WEIDMUELLER INTERFACE GMBH & CO KG et al.) [I] 1-15 * paragraph [0016] - paragraph [0026]; figures 1-10; claims 1-4 * | [A] US2012313622 (ROLLAND PATRICK et al.) [A] 1-15 * figures 1-5; claims 1-3 * | [A] WO2010067299 (GRINPAL ENERGY MAN PTY LTD et al.) [A] 1-15 * figure 1; claim 1 * | [A] US2007093125 (JAYNE ROB et al.) [A] 1-15 * paragraphs [0025] , [0026]; figures 2A-2D; claim 1 * | [A] RU89712 [A] 1-15 * claim 1 * |