| EP3879163 - METHOD OF MARKING A PIPE WITH A SEALING STOPPER [Right-click to bookmark this link] | |||
| Former [2021/37] | SEALING STOPPER | ||
| [2024/03] | Status | No opposition filed within time limit Status updated on 04.04.2025 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 27.04.2024 | ||
| Former | Grant of patent is intended Status updated on 01.01.2024 | ||
| Former | Examination is in progress Status updated on 15.12.2022 | ||
| Former | Request for examination was made Status updated on 21.01.2022 | ||
| Former | The application has been published Status updated on 13.08.2021 | Most recent event Tooltip | 17.10.2025 | Lapse of the patent in a contracting state New state(s): MC | published on 19.11.2025 [2025/47] | Applicant(s) | For all designated states Geberit International AG Schachenstrasse 77 8645 Jona / CH | [2024/28] |
| Former [2021/37] | For all designated states Geberit International AG Schachenstrasse 77 8645 Jona / CH | Inventor(s) | 01 /
RÖST, Andreas Steinackerstr. 13 8645 Jona / CH | [2021/37] | Representative(s) | Frischknecht, Harry Ralph Isler & Pedrazzini AG Giesshübelstrasse 45 Postfach 1772 8027 Zürich / CH | [2021/37] | Application number, filing date | 20162689.2 | 12.03.2020 | [2021/37] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3879163 | Date: | 15.09.2021 | Language: | DE | [2021/37] | Type: | B1 Patent specification | No.: | EP3879163 | Date: | 29.05.2024 | Language: | DE | [2024/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2020 | Classification | IPC: | F16L55/11, B25H7/04, B25H7/00 | [2021/37] | CPC: |
F16L55/11 (EP);
B25H7/005 (EP);
B25H7/04 (EP);
F16L2201/60 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/08] |
| Former [2021/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR MARKIERUNG EINES ROHRS MIT EINEM VERSCHLUSSSTOPFEN | [2024/03] | English: | METHOD OF MARKING A PIPE WITH A SEALING STOPPER | [2024/03] | French: | PROCÉDURE DE MARQUAGE D'UN TUYAU AVEC UN BOUCHON D'OBTURATION | [2024/03] |
| Former [2021/37] | VERSCHLUSSSTOPFEN | ||
| Former [2021/37] | SEALING STOPPER | ||
| Former [2021/37] | BOUCHON D'OBTURATION | Examination procedure | 18.01.2022 | Examination requested [2022/08] | 18.01.2022 | Date on which the examining division has become responsible | 01.03.2022 | Amendment by applicant (claims and/or description) | 14.12.2022 | Despatch of a communication from the examining division (Time limit: M04) | 08.03.2023 | Reply to a communication from the examining division | 02.01.2024 | Communication of intention to grant the patent | 22.04.2024 | Fee for grant paid | 22.04.2024 | Fee for publishing/printing paid | 22.04.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2025 | No opposition filed within time limit [2025/19] | Fees paid | Renewal fee | 11.03.2022 | Renewal fee patent year 03 | 16.03.2023 | Renewal fee patent year 04 | 13.03.2024 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 29.05.2024 | CZ | 29.05.2024 | DK | 29.05.2024 | EE | 29.05.2024 | ES | 29.05.2024 | FI | 29.05.2024 | HR | 29.05.2024 | IT | 29.05.2024 | LV | 29.05.2024 | MC | 29.05.2024 | NL | 29.05.2024 | PL | 29.05.2024 | RO | 29.05.2024 | SE | 29.05.2024 | SI | 29.05.2024 | SK | 29.05.2024 | SM | 29.05.2024 | NO | 29.08.2024 | RS | 29.08.2024 | GR | 30.08.2024 | IS | 29.09.2024 | [2025/47] |
| Former [2025/42] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SE | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/22] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/11] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/10] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/09] | BG | 29.05.2024 | |
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/08] | BG | 29.05.2024 | |
| DK | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/52] | BG | 29.05.2024 | |
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| NL | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/49] | BG | 29.05.2024 | |
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/48] | BG | 29.05.2024 | |
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/47] | BG | 29.05.2024 | |
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/46] | BG | 29.05.2024 | |
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| IS | 29.09.2024 | Documents cited: | Search | [XAY] ITUB20155084 (MONTANARI ANTONIO et al.) [X] 1-3,5-14,17-19 * the whole document *[A] 4,20 [Y] 15,16 | [XA] US5622208 (VINSON CHRIS A et al.) [X] 1,2,5,7,8,10,12-14 * the whole document *[A] 4,20 | [XAY] NL2001686 (DAF TRUCKS NV et al.) [X] 1-3,5-7,14,17-19 * the whole document *[A] 4,20 [Y] 15,16 | [Y] US6360779 (WAGNER ROBERT JOSEPH et al.) [Y] 15,16 * abstract * | [A] US2016008965 (GLEDHILL JEREMY et al.) [A] 1-20 * the whole document * | Examination | CH716372 |