EP3690233 - A BULKHEAD ARRANGEMENT FOR A WIND TURBINE BLADE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 07.12.2021 | ||
Former | Request for examination was made Status updated on 12.02.2021 | ||
Former | The application has been published Status updated on 03.07.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | [2022/12] |
Former [2020/32] | For all designated states LM WP Patent Holding A/S Jupitervej 6 6000 Kolding / DK | Inventor(s) | 01 /
SAINI, Aanchal c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | 02 /
MAJUMDER, Utsa c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | 03 /
CHRISTENSEN, Christian Munk c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | 04 /
LYSEMOSE, Christian Roed c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | 05 /
HANSEN, Peter c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | 06 /
NIELSEN, Finn Kjær c/o LM Wind Power A/S Jupitervej 6 6000 Kolding / DK | [2020/32] | Representative(s) | COPA Copenhagen Patents Rosenørns Allé 1, 2nd floor 1970 Frederiksberg C / DK | [2020/32] | Application number, filing date | 20166815.9 | 19.11.2013 | [2020/32] | Priority number, date | EP20120193160 | 19.11.2012 Original published format: EP 12193160 | [2020/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3690233 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Type: | B1 Patent specification | No.: | EP3690233 | Date: | 11.05.2022 | Language: | EN | [2022/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.07.2020 | Classification | IPC: | F03D80/00, F03D1/06 | [2021/49] | CPC: |
F03D1/0675 (EP,US);
F03D80/00 (EP);
Y02E10/72 (EP,US);
Y10T29/49336 (EP,US);
Y10T29/49337 (EP,US)
|
Former IPC [2020/32] | F03D1/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/11] |
Former [2020/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHOTTWAND FÜR DAS ROTORBLATT EINER WINDTURBINE | [2021/49] | English: | A BULKHEAD ARRANGEMENT FOR A WIND TURBINE BLADE | [2020/32] | French: | AGENCEMENT DE CLOISON POUR UNE PALE D'ÉOLIENNE | [2020/32] |
Former [2020/32] | SCHOTT FÜR DAS BLATT EINER WINDTURBINE | Examination procedure | 05.02.2021 | Amendment by applicant (claims and/or description) | 05.02.2021 | Examination requested [2021/11] | 05.02.2021 | Date on which the examining division has become responsible | 08.12.2021 | Communication of intention to grant the patent | 04.04.2022 | Fee for grant paid | 04.04.2022 | Fee for publishing/printing paid | 04.04.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP13792381.9 / EP2920458 | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] | Fees paid | Renewal fee | 30.03.2020 | Renewal fee patent year 03 | 30.03.2020 | Renewal fee patent year 04 | 30.03.2020 | Renewal fee patent year 05 | 30.03.2020 | Renewal fee patent year 06 | 30.03.2020 | Renewal fee patent year 07 | 19.11.2020 | Renewal fee patent year 08 | 18.11.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.11.2013 | AL | 11.05.2022 | AT | 11.05.2022 | CY | 11.05.2022 | CZ | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | IT | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | MK | 11.05.2022 | MT | 11.05.2022 | PL | 11.05.2022 | RO | 11.05.2022 | RS | 11.05.2022 | SE | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | SM | 11.05.2022 | TR | 11.05.2022 | BG | 11.08.2022 | NO | 11.08.2022 | GR | 12.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | IE | 19.11.2022 | LU | 19.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | [2024/44] |
Former [2024/29] | HU | 19.11.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
MK | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
TR | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/27] | HU | 19.11.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
MK | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 19.11.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 19.11.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/11] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
LU | 19.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/25] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/17] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Documents cited: | Search | [X]GB2254382 (LAWSON TANCRED SIR HENRY BERT [GB]) [X] 1-3,13,14 * page 8, paragraph 4; figures 1,2 *; | [A]WO2011144971 (TECSIS TECNOLOGIA E SIST S AVANCADOS LTDA [BR], et al) [A] 1,13,14* figures 3,4 *; | [X]DE102010042530 (REPOWER SYSTEMS SE [DE]) [X] 1-3,13,14 * paragraph [0038]; figure 2 *; | [X]US2012141287 (HYNUM DANIEL ALAN [US], et al) [X] 1-3,13,14 * paragraphs [0027] - [0028]; figures 2,6 * | by applicant | WO2012119934 |