blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3722780

EP3722780 - PARTICLE SIZE MEASURING APPARATUS AND MEASURING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.01.2023
Database last updated on 12.11.2024
FormerThe patent has been granted
Status updated on  11.02.2022
FormerGrant of patent is intended
Status updated on  11.10.2021
FormerExamination is in progress
Status updated on  14.05.2021
FormerRequest for examination was made
Status updated on  11.09.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024  [2024/44]
Applicant(s)For all designated states
Hitachi, Ltd.
6-6, Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8280 / JP
[2020/42]
Inventor(s)01 / MISAWA, Tomonari
c/o Hitachi, Ltd., 6-6, Marunouchi 1-chome
Chiyoda-ku, Tokyo 100-8280 / JP
 [2020/42]
Representative(s)Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
[2022/11]
Former [2020/42]Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
Application number, filing date20168854.608.04.2020
[2020/42]
Priority number, dateJP2019007418109.04.2019         Original published format: JP 2019074181
JP2019020345108.11.2019         Original published format: JP 2019203451
[2020/42]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3722780
Date:14.10.2020
Language:EN
[2020/42]
Type: A3 Search report 
No.:EP3722780
Date:23.12.2020
Language:EN
[2020/52]
Type: B1 Patent specification 
No.:EP3722780
Date:16.03.2022
Language:EN
[2022/11]
Search report(s)(Supplementary) European search report - dispatched on:EP25.11.2020
ClassificationIPC:G01N15/02, G01N15/14
[2020/42]
CPC:
G01N15/0211 (EP,CN,KR,US); G01N15/0227 (EP,KR,US); G01N15/10 (KR);
G01N15/1433 (EP); G01N15/147 (EP); G01N21/47 (KR);
G01N2015/0038 (EP); G01N2015/0294 (US); G01N2015/1029 (KR);
G01N2015/1493 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/09]
Former [2020/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TEILCHENGRÖSSENMESSVORRICHTUNG UND -VERFAHREN[2020/42]
English:PARTICLE SIZE MEASURING APPARATUS AND MEASURING METHOD[2020/42]
French:APPAREIL DE MESURE DE LA TAILLE DE PARTICULES ET PROCÉDÉ DE MESURE[2020/42]
Examination procedure08.04.2020Examination requested  [2020/42]
20.01.2021Amendment by applicant (claims and/or description)
17.05.2021Despatch of a communication from the examining division (Time limit: M03)
05.07.2021Reply to a communication from the examining division
29.10.2021Communication of intention to grant the patent
04.02.2022Fee for grant paid
04.02.2022Fee for publishing/printing paid
04.02.2022Receipt of the translation of the claim(s)
Opposition(s)19.12.2022No opposition filed within time limit [2023/08]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.04.2020
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
MT16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
[2024/44]
Former [2024/29]HU08.04.2020
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2024/25]HU08.04.2020
AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2024/23]AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2024/20]AL16.03.2022
AT16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/35]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/22]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
FR16.05.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/20]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
IE08.04.2022
LU08.04.2022
BE30.04.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/10]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
LU08.04.2022
BE30.04.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/08]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
LU08.04.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/07]AL16.03.2022
AT16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/06]AL16.03.2022
AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/01]AL16.03.2022
AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/51]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/50]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/49]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/48]AT16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/47]AT16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/44]FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/39]FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/36]HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/35]HR16.03.2022
LT16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
Former [2022/33]LT16.03.2022
NO16.06.2022
Documents cited:Search[XI]EP0281077  (NAGASU HIDEO [JP], et al) [X] 1,8 * figure 3 * * column 3, line 14 - column 4, line 3 * [I] 2-4,6,7;
 [XI]CN105115866  (UNIV TSINGHUA) [X] 1,8 * the whole document * [I] 2-4,6,7;
 [I]CN105115864  (UNIV TSINGHUA) [I] 1,8 * the whole document *;
 [I]EP3088863  (MALVERN INSTR LTD [GB]) [I] 1,8 * figures 1-3 ** paragraph [0043] - paragraph [0072] *;
 [XI]WO2017054070  (INST NAT D'OPTIQUE [CA]) [X] 1,8 * page 10, line 8 - page 19, line 21 * * figures 5,16 * [I] 2-4,6,7;
 [XI]EP3279636  (AIST [JP]) [X] 1,8 * figures 1-3 * * paragraph [0023] - paragraph [0026] * [I] 2-4,6,7
ExaminationUS2005099626
by applicantJP2009156595
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.