| EP3708795 - STRUCTURAL HONEYCOMB PANEL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.07.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 19.08.2022 | ||
| Former | Grant of patent is intended Status updated on 07.04.2022 | ||
| Former | Request for examination was made Status updated on 19.03.2021 | ||
| Former | The application has been published Status updated on 14.08.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2020/38] | Inventor(s) | 01 /
HARRIS, Meggan 95 Shailor Hill Road Colchester, CT Connecticut 06415 / US | [2020/41] |
| Former [2020/38] | 01 /
HARRIS, Meggan 83 Dara Drive Colchester, CT Connecticut 06415 / US | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
| Former [2020/38] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 20170218.0 | 09.12.2014 | [2020/38] | Priority number, date | US201361915073P | 12.12.2013 Original published format: US 201361915073 P | [2020/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3708795 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3708795 | Date: | 21.09.2022 | Language: | EN | [2022/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.08.2020 | Classification | IPC: | F01D25/24, F01D25/12, F02C7/12, F02C7/20, F16S1/00, F02K1/82, F02C7/24 | [2020/38] | CPC: |
F01D25/12 (EP,US);
B22F5/10 (EP,US);
F01D25/24 (EP,US);
F01D9/02 (US);
F02C7/24 (EP,US);
F02K1/822 (EP,US);
B22F10/25 (EP,US);
B22F10/38 (EP,US);
B22F2207/11 (EP,US);
B22F5/009 (EP,US);
B33Y10/00 (US);
B33Y80/00 (US);
F05D2220/32 (US);
F05D2230/22 (EP,US);
F05D2230/31 (EP,US);
F05D2230/53 (EP,US);
F05D2250/132 (EP,US);
F05D2250/283 (EP,US);
F05D2250/314 (EP,US);
F05D2260/202 (EP,US);
Y02P10/25 (US);
Y02T50/60 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/16] |
| Former [2020/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STRUKTURELLE WABENTAFEL | [2020/38] | English: | STRUCTURAL HONEYCOMB PANEL | [2020/38] | French: | PANNEAU STRUCTURAL EN NID D'ABEILLE | [2020/38] | Examination procedure | 16.03.2021 | Amendment by applicant (claims and/or description) | 16.03.2021 | Examination requested [2021/16] | 16.03.2021 | Date on which the examining division has become responsible | 08.04.2022 | Communication of intention to grant the patent | 16.08.2022 | Fee for grant paid | 16.08.2022 | Fee for publishing/printing paid | 16.08.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14883752.9 / EP3080406 | Opposition(s) | 22.06.2023 | No opposition filed within time limit [2023/35] | Fees paid | Renewal fee | 08.05.2020 | Renewal fee patent year 03 | 08.05.2020 | Renewal fee patent year 04 | 08.05.2020 | Renewal fee patent year 05 | 08.05.2020 | Renewal fee patent year 06 | 17.12.2020 | Renewal fee patent year 07 | 16.12.2021 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.12.2014 | AL | 21.09.2022 | AT | 21.09.2022 | BG | 21.09.2022 | CY | 21.09.2022 | CZ | 21.09.2022 | DK | 21.09.2022 | EE | 21.09.2022 | ES | 21.09.2022 | FI | 21.09.2022 | HR | 21.09.2022 | IT | 21.09.2022 | LT | 21.09.2022 | LV | 21.09.2022 | MC | 21.09.2022 | MK | 21.09.2022 | MT | 21.09.2022 | NL | 21.09.2022 | PL | 21.09.2022 | RO | 21.09.2022 | RS | 21.09.2022 | SE | 21.09.2022 | SI | 21.09.2022 | SK | 21.09.2022 | SM | 21.09.2022 | TR | 21.09.2022 | IE | 09.12.2022 | LU | 09.12.2022 | NO | 21.12.2022 | GR | 22.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | IS | 21.01.2023 | PT | 23.01.2023 | [2024/44] |
| Former [2024/34] | HU | 09.12.2014 | |
| AL | 21.09.2022 | ||
| AT | 21.09.2022 | ||
| BG | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| IT | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| MC | 21.09.2022 | ||
| MK | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| TR | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2024/29] | HU | 09.12.2014 | |
| AL | 21.09.2022 | ||
| AT | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| IT | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| MC | 21.09.2022 | ||
| MK | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| TR | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2024/27] | HU | 09.12.2014 | |
| AL | 21.09.2022 | ||
| AT | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| IT | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| MK | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2024/26] | HU | 09.12.2014 | |
| AL | 21.09.2022 | ||
| AT | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| IT | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2024/25] | HU | 09.12.2014 | |
| AL | 21.09.2022 | ||
| AT | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2024/21] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CY | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/49] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/48] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| IE | 09.12.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/47] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/38] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| LU | 09.12.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/37] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SI | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/34] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| DK | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/30] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| NL | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/29] | AL | 21.09.2022 | |
| AT | 21.09.2022 | ||
| CZ | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/26] | AT | 21.09.2022 | |
| CZ | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| PL | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| IS | 21.01.2023 | ||
| PT | 23.01.2023 | ||
| Former [2023/23] | AT | 21.09.2022 | |
| CZ | 21.09.2022 | ||
| EE | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SK | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| PT | 23.01.2023 | ||
| Former [2023/22] | AT | 21.09.2022 | |
| CZ | 21.09.2022 | ||
| ES | 21.09.2022 | ||
| FI | 21.09.2022 | ||
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| RO | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| PT | 23.01.2023 | ||
| Former [2023/20] | FI | 21.09.2022 | |
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| SM | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| Former [2023/10] | FI | 21.09.2022 | |
| HR | 21.09.2022 | ||
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| GR | 22.12.2022 | ||
| Former [2023/09] | FI | 21.09.2022 | |
| LT | 21.09.2022 | ||
| LV | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| NO | 21.12.2022 | ||
| Former [2023/08] | FI | 21.09.2022 | |
| LT | 21.09.2022 | ||
| RS | 21.09.2022 | ||
| SE | 21.09.2022 | ||
| NO | 21.12.2022 | Documents cited: | Search | [IA] GB2452476 (ASSYSTEM UK LTD et al.) | [IA] US6122892 (GONIDEC PATRICK et al.) [I] 1-3,7-11,15 * page 4, line 21 - page 6, line 15 * * page 7, line 23 - page 8, line 3 * * page 11, line 17 - page 15, line 8 * * abstract *[A] 4-6,12-14 | [A] JPH06106662 (HITACHI LTD et al.) [A] 1,4,6,9,12,14 | [A] US2010192590 (JOHNSON MICHAEL ROBERT et al.) [A] 1-3,10,11 * abstract * | by applicant | US201313869042 |