EP3744625 - SYSTEMS AND METHODS FOR IMPROVING BUOYANCY OF UNDERWATER VEHICLES [Right-click to bookmark this link] | |||
Former [2020/49] | SYSTEMS AND METHODS FOR IMPROVING BUOYANCY UNDERWATER VEHICLES | ||
[2022/39] | Status | No opposition filed within time limit Status updated on 25.08.2023 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 16.09.2022 | ||
Former | Grant of patent is intended Status updated on 07.04.2022 | ||
Former | Request for examination was made Status updated on 04.06.2021 | ||
Former | The application has been published Status updated on 30.10.2020 | ||
Former | unknown Status updated on 28.06.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Hadal, Inc. 2107 Livingston Street, Suite B Oakland, CA 94606 / US | [2020/49] | Inventor(s) | 01 /
RIKOSKI, Richard J. Hadal, Inc. 2018 Central Avenue Apt. C Alameda, California 94501 / US | 02 /
POMPA, Jonathan 6931 E Spring Street Long Beach, California 90808 / US | 03 /
DAMUS, Robert S. 2465 Shoreline Drive Apt. 403 Alameda, California 94501 / US | 04 /
OWENS, Dylan 754 The Alameda Apt. 4401 San Jose, California 95126 / US | [2020/49] | Representative(s) | Carroll, Christopher P., et al Burns & Levinson London LLP 4-12 Regent Street, 4th Floor London SW1Y 4PE / GB | [2020/49] | Application number, filing date | 20170743.7 | 14.03.2014 | [2020/49] | Priority number, date | US201361792708P | 15.03.2013 Original published format: US 201361792708 P | [2020/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3744625 | Date: | 02.12.2020 | Language: | EN | [2020/49] | Type: | B1 Patent specification | No.: | EP3744625 | Date: | 19.10.2022 | Language: | EN | [2022/42] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.10.2020 | Classification | IPC: | B63G8/00, B63G8/22, // B63G8/39, B63B3/13 | [2020/49] | CPC: |
B22D31/00 (EP,US);
B63B35/40 (EP,US);
B29C44/3415 (EP);
B63B27/16 (EP,US);
B63B27/36 (EP,US);
B63B3/13 (EP,US);
B63G8/00 (EP,US);
B63G8/001 (EP,US);
B63G8/39 (EP,US);
B64U80/84 (EP,US);
F17C1/00 (EP,US);
G01S15/02 (US);
G01S15/104 (US);
G01S15/588 (US);
G01S15/60 (US);
G01S7/52004 (US);
H01M10/052 (US);
H01M10/4257 (EP);
H01M50/138 (EP,US);
B63B2027/165 (EP,US);
B63B2035/405 (EP,US);
B63G2008/004 (EP,US);
B63G2008/008 (EP,US);
G01S15/107 (US);
G01S15/8904 (US);
Y02E60/10 (EP);
Y02T70/10 (EP);
Y10T29/49117 (EP,US);
Y10T29/49826 (EP,US);
Y10T29/49893 (EP,US);
Y10T29/49989 (EP,US);
Y10T29/5176 (EP,US);
Y10T428/1352 (EP,US);
Y10T428/1376 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/27] |
Former [2020/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN ZUR VERBESSERUNG DES AUFTRIEBES VON UNTERWASSERFAHRZEUGEN | [2022/39] | English: | SYSTEMS AND METHODS FOR IMPROVING BUOYANCY OF UNDERWATER VEHICLES | [2022/39] | French: | SYSTÈMES ET PROCÉDÉS POUR AMÉLIORER LA FLOTTABILITÉ DE VÉHICULES SOUS-MARINS | [2022/39] |
Former [2020/49] | SYSTEME UND VERFAHREN FÜR VERBESSERTEN AUFTRIEB VON UNTERWASSERFAHRZEUGEN | ||
Former [2020/49] | SYSTEMS AND METHODS FOR IMPROVING BUOYANCY UNDERWATER VEHICLES | ||
Former [2020/49] | SYSTÈMES ET PROCÉDÉS D'AMÉLIORATION DE FLOTTABILITÉ DE VÉHICULES SOUS-MARINS | Examination procedure | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2020/49] | 29.06.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2020/49] | 01.06.2021 | Amendment by applicant (claims and/or description) | 01.06.2021 | Examination requested [2021/27] | 01.06.2021 | Date on which the examining division has become responsible | 08.04.2022 | Communication of intention to grant the patent | 08.08.2022 | Fee for grant paid | 08.08.2022 | Fee for publishing/printing paid | 08.08.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14725285.2 / EP2969739 | EP17200474.9 / EP3326902 | Opposition(s) | 20.07.2023 | No opposition filed within time limit [2023/39] | Request for further processing for: | 24.07.2020 | Request for further processing filed | 24.07.2020 | Full payment received (date of receipt of payment) Request granted | 04.08.2020 | Decision despatched | Fees paid | Renewal fee | 24.07.2020 | Renewal fee patent year 03 | 24.07.2020 | Renewal fee patent year 04 | 24.07.2020 | Renewal fee patent year 05 | 24.07.2020 | Renewal fee patent year 06 | 24.07.2020 | Renewal fee patent year 07 | 29.03.2021 | Renewal fee patent year 08 | 28.03.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.10.2022 | AT | 19.10.2022 | CZ | 19.10.2022 | DK | 19.10.2022 | EE | 19.10.2022 | ES | 19.10.2022 | FI | 19.10.2022 | HR | 19.10.2022 | IT | 19.10.2022 | LT | 19.10.2022 | LV | 19.10.2022 | MC | 19.10.2022 | NL | 19.10.2022 | PL | 19.10.2022 | RO | 19.10.2022 | RS | 19.10.2022 | SE | 19.10.2022 | SI | 19.10.2022 | SK | 19.10.2022 | SM | 19.10.2022 | GR | 20.01.2023 | IS | 19.02.2023 | PT | 20.02.2023 | IE | 14.03.2023 | LU | 14.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | [2024/26] |
Former [2024/12] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
IE | 14.03.2023 | ||
LU | 14.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/09] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
IE | 14.03.2023 | ||
LU | 14.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
IE | 14.03.2023 | ||
LU | 14.03.2023 | ||
Former [2024/02] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
LU | 14.03.2023 | ||
Former [2023/51] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/48] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/38] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/37] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/35] | AT | 19.10.2022 | |
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/34] | AT | 19.10.2022 | |
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/33] | AT | 19.10.2022 | |
DK | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/25] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/23] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
SE | 19.10.2022 | ||
GR | 20.01.2023 | ||
PT | 20.02.2023 | ||
Former [2023/22] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
LT | 19.10.2022 | ||
NL | 19.10.2022 | ||
SE | 19.10.2022 | ||
PT | 20.02.2023 | ||
Former [2023/20] | LT | 19.10.2022 | |
NL | 19.10.2022 | ||
Former [2023/17] | NL | 19.10.2022 | Documents cited: | Search | [A]GB1153248 (BENDIX CORP [US]) [A] 2,9* figure -; claim 1 *; | [X]US5613460 (STALLARD III CLINTON W [US]) [X] 1,2,4-9,11-14 * column 2, lines 37-52; figure - *; | [X]US2008262666 (MANNING DOUG [US]) [X] 1,8 * paragraphs [0035] - [0043]; figures 1-4 *; | [X]US2013059489 (VLOCK MICHAEL [US], et al) [X] 1,8 * paragraphs [0047] - [0057] - [0068] - [0082]; figures 1-3,10-17 * | by applicant | US20100802454 |