| EP3709758 - METHOD FOR ENABLING DEVICE TO DEVICE COMMUNICATION IN A RADIO COMMUNICATIONS NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.06.2024 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 21.07.2023 | ||
| Former | Grant of patent is intended Status updated on 05.04.2023 | ||
| Former | Examination is in progress Status updated on 07.01.2022 | ||
| Former | Request for examination was made Status updated on 05.03.2021 | ||
| Former | The application has been published Status updated on 14.08.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [N/P] |
| Former [2023/34] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | ||
| Former [2020/38] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | Inventor(s) | 01 /
SORRENTINO, Stefano Hannebergsgatan 32 17168 Solna / SE | 02 /
FOLKE, Mats Rabattvägen 13 16243 Vällingby / SE | 03 /
WÄNSTEDT, Stefan Östra Brunnsgatan 30 B 97251 Luleå / SE | [2020/38] | Representative(s) | Taor, Simon Edward William Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2023/34] |
| Former [2020/38] | Finnegan Europe LLP 1 London Bridge London SE1 9BG / GB | Application number, filing date | 20170871.6 | 22.12.2014 | [2020/38] | Priority number, date | US201461974514P | 03.04.2014 Original published format: US 201461974514 P | [2020/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3709758 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3709758 | Date: | 23.08.2023 | Language: | EN | [2023/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.06.2020 | Classification | IPC: | H04W76/23, H04W76/14, H04W72/23 | [2023/14] | CPC: |
H04W76/23 (EP,US);
H04W72/27 (US);
H04W72/20 (US);
H04W72/23 (EP,US);
H04W76/14 (EP,US);
H04W92/18 (US)
|
| Former IPC [2020/38] | H04W76/00, H04W72/04, H04W72/12, H04W84/18, H04W88/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/14] |
| Former [2020/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR ERMÖGLICHUNG VON D2D-KOMMUNIKATION IN EINEM FUNKKOMMUNIKATIONSNETZ | [2020/38] | English: | METHOD FOR ENABLING DEVICE TO DEVICE COMMUNICATION IN A RADIO COMMUNICATIONS NETWORK | [2020/38] | French: | PROCÉDÉ POUR PERMETTRE DES COMMUNICATIONS DISPOSITIF À DISPOSITIF DANS UN RÉSEAU DE RADIOCOMMUNICATION | [2020/38] | Examination procedure | 01.03.2021 | Amendment by applicant (claims and/or description) | 01.03.2021 | Examination requested [2021/14] | 01.03.2021 | Date on which the examining division has become responsible | 11.01.2022 | Despatch of a communication from the examining division (Time limit: M04) | 17.05.2022 | Reply to a communication from the examining division | 06.04.2023 | Communication of intention to grant the patent | 18.07.2023 | Fee for grant paid | 18.07.2023 | Fee for publishing/printing paid | 18.07.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14888495.0 / EP3127394 | Opposition(s) | 24.05.2024 | No opposition filed within time limit [2024/31] | Fees paid | Renewal fee | 22.04.2020 | Renewal fee patent year 03 | 22.04.2020 | Renewal fee patent year 04 | 22.04.2020 | Renewal fee patent year 05 | 22.04.2020 | Renewal fee patent year 06 | 26.11.2020 | Renewal fee patent year 07 | 22.11.2021 | Renewal fee patent year 08 | 21.12.2022 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 22.12.2014 | HU | 22.12.2014 | AT | 23.08.2023 | BG | 23.08.2023 | CZ | 23.08.2023 | DK | 23.08.2023 | EE | 23.08.2023 | ES | 23.08.2023 | FI | 23.08.2023 | HR | 23.08.2023 | IT | 23.08.2023 | LT | 23.08.2023 | LV | 23.08.2023 | MC | 23.08.2023 | NL | 23.08.2023 | PL | 23.08.2023 | RO | 23.08.2023 | RS | 23.08.2023 | SE | 23.08.2023 | SI | 23.08.2023 | SK | 23.08.2023 | SM | 23.08.2023 | TR | 23.08.2023 | NO | 23.11.2023 | GR | 24.11.2023 | IE | 22.12.2023 | LU | 22.12.2023 | IS | 23.12.2023 | PT | 26.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | [2026/05] |
| Former [2025/39] | CY | 22.12.2014 | |
| HU | 22.12.2014 | ||
| AT | 23.08.2023 | ||
| BG | 23.08.2023 | ||
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| Former [2025/36] | CY | 22.12.2014 | |
| AT | 23.08.2023 | ||
| BG | 23.08.2023 | ||
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| Former [2024/51] | AT | 23.08.2023 | |
| BG | 23.08.2023 | ||
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| Former [2024/48] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| BE | 31.12.2023 | ||
| CH | 31.12.2023 | ||
| Former [2024/47] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| BE | 31.12.2023 | ||
| Former [2024/46] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IE | 22.12.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/40] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| MC | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| LU | 22.12.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/36] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SI | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/26] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| IT | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/23] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| EE | 23.08.2023 | ||
| ES | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SK | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/22] | AT | 23.08.2023 | |
| CZ | 23.08.2023 | ||
| DK | 23.08.2023 | ||
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RO | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/20] | AT | 23.08.2023 | |
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| SM | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/10] | AT | 23.08.2023 | |
| FI | 23.08.2023 | ||
| HR | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| LV | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| PL | 23.08.2023 | ||
| RS | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| PT | 26.12.2023 | ||
| Former [2024/09] | AT | 23.08.2023 | |
| FI | 23.08.2023 | ||
| LT | 23.08.2023 | ||
| NL | 23.08.2023 | ||
| SE | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | ||
| IS | 23.12.2023 | ||
| Former [2024/08] | LT | 23.08.2023 | |
| NL | 23.08.2023 | ||
| NO | 23.11.2023 | ||
| GR | 24.11.2023 | Documents cited: | Search | [XAI] WO2013162333 (KOREA ELECTRONICS TELECOMM et al.) [X] 1,2,4,5,7-12,15-17 * paragraphs [0257] - [0270] - [ 456] - [0482] - [ 509] - [0539] *[A] 14 [I] 3,6,13 | [XAI] US2015078279 (KO YOUNG JO et al.) * paragraphs [0211] - [0218] - [ 0331] - [0354] - [ 0370] - [0396] *[A] 14 [I] 3,6,13 | [A] WO2014010995 (LG ELECTRONICS INC et al.) [A] 1-17 * paragraphs [0124] - [0135] * | [A] US2015163790 (LEE JIHYUN et al.) * paragraphs [0120] - [0133] * | [A] US2012163252 (AHN JAE YOUNG et al.) [A] 1-17 * paragraphs [0074] - [0078] - [ 0098] - [0108]; figures 9, 10; claim 1 * | [A] LG ELECTRONICS: "Control design for D2D broadcast communication", vol. RAN WG1, no. Shenzhen, China; 20140331 - 20140404, 30 March 2014 (2014-03-30), XP050787021, Retrieved from the Internet | [A] CATR: "On control information of D2D communication", vol. RAN WG1, no. Shenzhen, China; 20140331 - 20140404, 30 March 2014 (2014-03-30), XP050787268, Retrieved from the Internet |