| EP3722225 - TRAY FOR PACKAGING FOOD PRODUCTS CONSTITUTED OF A FLAT SHEET OF MULTI-LAYER MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2024 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 26.05.2023 | ||
| Former | Grant of patent is intended Status updated on 28.02.2023 | ||
| Former | Examination is in progress Status updated on 26.08.2021 | ||
| Former | Request for examination was made Status updated on 04.12.2020 | ||
| Former | The application has been published Status updated on 11.09.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states G. Mondini SpA Via Brescia 5/7 25033 Cologne (BS) / IT | [2023/26] |
| Former [2020/42] | For all designated states G. Mondini SpA Via Brescia 5/7 25033 Cologne Bresciano (BS) / IT | Inventor(s) | 01 /
Mondini, Giovanni Via Marconi 100 25033 Cologne (Brescia) / IT | [2020/42] | Representative(s) | Ponchiroli, Simone, et al Ruffini Ponchiroli e Associati S.r.l. Via Caprera, 6 37126 Verona / IT | [2020/42] | Application number, filing date | 20172316.0 | 12.03.2019 | [2020/42] | Priority number, date | IT20180003743 | 19.03.2018 Original published format: IT201800003743 | [2020/42] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3722225 | Date: | 14.10.2020 | Language: | EN | [2020/42] | Type: | B1 Patent specification | No.: | EP3722225 | Date: | 28.06.2023 | Language: | EN | [2023/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.07.2020 | Classification | IPC: | B65D75/30, B65D77/20 | [2020/42] | CPC: |
B65D75/30 (EP,US);
B65D75/5838 (US);
B32B7/06 (US);
B65D1/34 (US);
B65D77/2052 (EP,US);
B32B2439/70 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/01] |
| Former [2020/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | TRAY ZUR VERPACKUNG VON LEBENSMITTELN, DER AUS EINER FLACHES BLATT AUS MEHRSCHICHTENMATERIAL GEBILDET IST | [2020/42] | English: | TRAY FOR PACKAGING FOOD PRODUCTS CONSTITUTED OF A FLAT SHEET OF MULTI-LAYER MATERIAL | [2020/42] | French: | PLATEAU D'EMBALLAGE DE PRODUITS ALIMENTAIRES CONSTITUÉ À PARTIR D'UNE FEUILLE PLATE EN MATÉRIAU MULTICOUCHE | [2020/42] | Examination procedure | 30.11.2020 | Examination requested [2021/01] | 30.11.2020 | Date on which the examining division has become responsible | 10.02.2021 | Amendment by applicant (claims and/or description) | 25.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.12.2021 | Reply to a communication from the examining division | 01.03.2023 | Communication of intention to grant the patent | 15.05.2023 | Fee for grant paid | 15.05.2023 | Fee for publishing/printing paid | 15.05.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP19162152.3 / EP3543170 | Opposition(s) | 02.04.2024 | No opposition filed within time limit [2024/23] | Fees paid | Renewal fee | 29.03.2021 | Renewal fee patent year 03 | 24.02.2022 | Renewal fee patent year 04 | 23.02.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 12.03.2019 | HU | 12.03.2019 | AT | 28.06.2023 | BG | 28.06.2023 | CZ | 28.06.2023 | DK | 28.06.2023 | EE | 28.06.2023 | FI | 28.06.2023 | HR | 28.06.2023 | LT | 28.06.2023 | LV | 28.06.2023 | MC | 28.06.2023 | NL | 28.06.2023 | PL | 28.06.2023 | RO | 28.06.2023 | RS | 28.06.2023 | SE | 28.06.2023 | SI | 28.06.2023 | SK | 28.06.2023 | SM | 28.06.2023 | TR | 28.06.2023 | NO | 28.09.2023 | GR | 29.09.2023 | IS | 28.10.2023 | PT | 30.10.2023 | IE | 12.03.2024 | LU | 12.03.2024 | BE | 31.03.2024 | CH | 31.03.2024 | [2026/05] |
| Former [2025/41] | CY | 12.03.2019 | |
| HU | 12.03.2019 | ||
| AT | 28.06.2023 | ||
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| IE | 12.03.2024 | ||
| LU | 12.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/37] | CY | 12.03.2019 | |
| AT | 28.06.2023 | ||
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| IE | 12.03.2024 | ||
| LU | 12.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/11] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| IE | 12.03.2024 | ||
| LU | 12.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/10] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| IE | 12.03.2024 | ||
| LU | 12.03.2024 | ||
| BE | 31.03.2024 | ||
| Former [2025/08] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| LU | 12.03.2024 | ||
| BE | 31.03.2024 | ||
| Former [2024/52] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| LU | 12.03.2024 | ||
| Former [2024/51] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/36] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/22] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/10] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/09] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| Former [2024/08] | FI | 28.06.2023 | |
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2024/03] | FI | 28.06.2023 | |
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2024/01] | HR | 28.06.2023 | |
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/52] | HR | 28.06.2023 | |
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/51] | HR | 28.06.2023 | |
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/50] | SE | 28.06.2023 | |
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/48] | SE | 28.06.2023 | |
| NO | 28.09.2023 | Documents cited: | Search | [A] WO2016182831 (CRYOVAC INC et al.) [A] 1-8 * pages 1-16 * * figures 1-8 * | [A] US3255880 (GROSSMAN ROBERT M et al.) [A] 1-8 * column 1, line 8 - column 3, line 56 * * figures 1-5 * | [I] US2874836 (WERTEPNY JR ALEXANDER W et al.) [I] 1-6,8 * column 1, line 15 - column 6, line 11 * * figures 1-8 * | [A] US2009250466 (FUJIMURA KAORU et al.) [A] 1-8 * paragraph [0007] - paragraph [0119] * * figures 31-33 * | [A] US3483964 (MUEHLING CHARLES LLOYD et al.) [A] 1-8 * column 1, line 55 - column 4, line 4 * * figures 1-5 * | [A] WO2011012649 (CRYOVAC INC et al.) [A] 1-8 * page 4, lines 22-25 * * page 1, lines 6-9 * |