| EP3754328 - DEVICE FOR ADJUSTING AND CHANGING BEAM CATCHERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.04.2025 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 27.04.2024 | ||
| Former | Grant of patent is intended Status updated on 20.02.2024 | ||
| Former | Examination is in progress Status updated on 26.08.2022 | ||
| Former | Request for examination was made Status updated on 18.12.2020 | ||
| Former | The application has been published Status updated on 20.11.2020 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states Bruker AXS GmbH Östliche Rheinbrückenstrasse 49 76187 Karlsruhe / DE | [2020/52] | Inventor(s) | 01 /
Gehrlein, Wolfgang Im Mühlsändel 13 76761 Rülzheim / DE | [2020/52] | Representative(s) | Kohler Schmid Möbus Patentanwälte Partnerschaftsgesellschaft mbB Gropiusplatz 10 70563 Stuttgart / DE | [2020/52] | Application number, filing date | 20178646.4 | 08.06.2020 | [2020/52] | Priority number, date | DE201910208834 | 18.06.2019 Original published format: DE102019208834 | [2020/52] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP3754328 | Date: | 23.12.2020 | Language: | DE | [2020/52] | Type: | A3 Search report | No.: | EP3754328 | Date: | 30.12.2020 | Language: | DE | [2020/53] | Type: | B1 Patent specification | No.: | EP3754328 | Date: | 29.05.2024 | Language: | DE | [2024/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.12.2020 | Classification | IPC: | G01N23/201, G21K1/10 | [2021/01] | CPC: |
G01N23/201 (EP,US);
G01N23/20008 (US);
G01N23/207 (US);
G21K1/10 (EP,US);
G01N2223/321 (EP,US)
|
| Former IPC [2020/52] | G01N23/201 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/03] |
| Former [2020/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG ZUM JUSTIEREN UND WECHSELN VON STRAHLFÄNGERN | [2020/52] | English: | DEVICE FOR ADJUSTING AND CHANGING BEAM CATCHERS | [2020/52] | French: | DISPOSITIF D'AJUSTEMENT ET DE CHANGEMENT DE RÉCEPTEURS DE RAYONNEMENT | [2020/52] | Examination procedure | 15.12.2020 | Amendment by applicant (claims and/or description) | 15.12.2020 | Examination requested [2021/03] | 15.12.2020 | Date on which the examining division has become responsible | 26.08.2022 | Despatch of a communication from the examining division (Time limit: M04) | 23.09.2022 | Reply to a communication from the examining division | 21.02.2024 | Communication of intention to grant the patent | 17.04.2024 | Fee for grant paid | 17.04.2024 | Fee for publishing/printing paid | 17.04.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2025 | No opposition filed within time limit [2025/19] | Fees paid | Renewal fee | 22.06.2022 | Renewal fee patent year 03 | 31.03.2023 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.06.2020 | HU | 08.06.2020 | BG | 29.05.2024 | CZ | 29.05.2024 | DK | 29.05.2024 | EE | 29.05.2024 | ES | 29.05.2024 | FI | 29.05.2024 | HR | 29.05.2024 | IT | 29.05.2024 | LV | 29.05.2024 | MC | 29.05.2024 | PL | 29.05.2024 | PT | 29.05.2024 | RO | 29.05.2024 | SE | 29.05.2024 | SI | 29.05.2024 | SK | 29.05.2024 | SM | 29.05.2024 | IE | 08.06.2024 | LU | 08.06.2024 | BE | 30.06.2024 | CH | 30.06.2024 | NO | 29.08.2024 | RS | 29.08.2024 | GR | 30.08.2024 | IS | 29.09.2024 | [2026/16] |
| Former [2025/51] | CY | 08.06.2020 | |
| BG | 29.05.2024 | ||
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| PT | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SE | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| IE | 08.06.2024 | ||
| LU | 08.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/45] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| PT | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SE | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| IE | 08.06.2024 | ||
| LU | 08.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/42] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SE | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| IE | 08.06.2024 | ||
| LU | 08.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/22] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SI | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| IE | 08.06.2024 | ||
| LU | 08.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/13] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| LU | 08.06.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/11] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| IT | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| MC | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/10] | BG | 29.05.2024 | |
| CZ | 29.05.2024 | ||
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| RO | 29.05.2024 | ||
| SK | 29.05.2024 | ||
| SM | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/09] | BG | 29.05.2024 | |
| DK | 29.05.2024 | ||
| EE | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2025/08] | BG | 29.05.2024 | |
| DK | 29.05.2024 | ||
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/49] | BG | 29.05.2024 | |
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| LV | 29.05.2024 | ||
| PL | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| RS | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/48] | BG | 29.05.2024 | |
| ES | 29.05.2024 | ||
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/47] | BG | 29.05.2024 | |
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| GR | 30.08.2024 | ||
| IS | 29.09.2024 | ||
| Former [2024/46] | BG | 29.05.2024 | |
| FI | 29.05.2024 | ||
| HR | 29.05.2024 | ||
| NO | 29.08.2024 | ||
| IS | 29.09.2024 | Documents cited: | Search | [XI] KR101608669 (TECHVALLEY CO LTD et al.) | [XI] WO9642088 (X RAY OPTICAL SYS INC et al.) [X] 1,2,10-14 * paragraphs [0004] , [0026] , [0029] , [0034] , [0036] , [0058]; figure 3 *[I] 3,8,9,15 | [Y] EP3441981 (BRUKER AXS GMBH et al.) [Y] 4-7 * figure 4 * | [IY] LCLS: "ENGINEERING SPECIFICATION DOCUMENT (ESD) R0 LUSI SUB-SYSTEM XCS Detector Mover LUSI XCS Large Angle Detector Mover Engineering Specification", 13 April 2009 (2009-04-13), XP055753100, Retrieved from the Internet | [IY] HENDRIK LINDEMANN: "Entwicklung eines Positioniersystems fr ein Absorptionselement im Hochvakuum", MASTERARBEIT, 1 January 2018 (2018-01-01), pages I-X, 1 - 117, XP055712843, Retrieved from the Internet DOI: http://dx.doi.org/10.3204/PUBDB-2018-02731 | [A] Z. BU ET AL: "A Small-Angle X-ray Scattering Apparatus for Studying Biological Macromolecules in Solution", JOURNAL OF APPLIED CRYSTALLOGRAPHY, vol. 31, no. 4, 1 August 1998 (1998-08-01), pages 533 - 543, XP055022431, ISSN: 0021-8898, DOI: 10.1107/S0021889897015422 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1107/S0021889897015422 | by applicant | US7295650 | US2004206908 |