EP3753696 - A METHOD OF MAKING A WATERPROOF FLOOR SLAB ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 11.10.2021 | ||
Former | Request for examination was made Status updated on 28.05.2021 | ||
Former | The application has been published Status updated on 20.11.2020 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Lehto Group OYJ Voimatie 6 B 90440 Kempele / FI | [2020/52] | Inventor(s) | 01 /
LEHTONEN, Hannu Lehto Group Oyj Haapavedentie 540 86300 Oulainen / FI | [2020/52] | Representative(s) | Berggren Oy P.O. Box 16 Eteläinen Rautatiekatu 10A 00101 Helsinki / FI | [2022/08] |
Former [2020/52] | Berggren Oy, Helsinki & Oulu Isokatu 32 90100 Oulu / FI | Application number, filing date | 20179892.3 | 15.06.2020 | [2020/52] | Priority number, date | FI20190005533 | 19.06.2019 Original published format: FI 20195533 | [2020/52] | Filing language | FI | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3753696 | Date: | 23.12.2020 | Language: | EN | [2020/52] | Type: | B1 Patent specification | No.: | EP3753696 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.11.2020 | Classification | IPC: | B28B7/00, B28B7/36, B28B11/04, B32B3/30, B32B7/06, B32B7/12, B32B9/00, B32B9/04 | [2021/43] | CPC: |
B28B7/368 (EP,FI);
B28B1/16 (FI);
B28B11/04 (FI);
B28B11/046 (EP);
B28B7/0064 (EP,FI);
B32B3/30 (EP);
B32B7/06 (EP);
B32B7/12 (EP);
B32B9/002 (EP);
B32B9/005 (EP);
B32B9/04 (EP);
C04B41/45 (FI);
E04B1/34869 (FI);
E04C2/521 (FI);
E04F15/02188 (FI);
B32B2250/02 (EP);
B32B2255/00 (EP);
B32B2255/28 (EP);
B32B2307/538 (EP);
B32B2307/726 (EP);
B32B2307/7265 (EP);
|
Former IPC [2020/52] | B28B7/00, B28B7/36, B28B11/04, B32B13/00, E04B5/48, E04F15/02, E04G9/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/26] |
Former [2020/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES WASSERDICHTEN BODENPLATTENELEMENTS | [2020/52] | English: | A METHOD OF MAKING A WATERPROOF FLOOR SLAB ELEMENT | [2020/52] | French: | PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT DE DALLE DE PLANCHER ÉTANCHE À L'EAU | [2020/52] | Examination procedure | 21.05.2021 | Amendment by applicant (claims and/or description) | 21.05.2021 | Examination requested [2021/26] | 21.05.2021 | Date on which the examining division has become responsible | 12.10.2021 | Communication of intention to grant the patent | 13.01.2022 | Fee for grant paid | 13.01.2022 | Fee for publishing/printing paid | 13.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.06.2020 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | IT | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IE | 15.06.2022 | LU | 15.06.2022 | SE | 16.06.2022 | IS | 23.06.2022 | PT | 23.06.2022 | BE | 30.06.2022 | FR | 30.06.2022 | [2024/25] |
Former [2024/23] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
MK | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
SE | 16.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
BE | 30.06.2022 | ||
FR | 30.06.2022 | ||
Former [2024/20] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
SE | 16.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
BE | 30.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/35] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
SE | 16.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
BE | 30.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/26] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
SE | 16.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
BE | 30.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/22] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
SE | 16.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/21] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/20] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IE | 15.06.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/08] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | ES | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | ES | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | |
NO | 23.05.2022 | Documents cited: | Search | [A]DE652073 (HEINRICH EILENTROP) [A] 1-8 * page 1, line 56 - page 2, line 74 *; | [A]JP2000141328 (TAISEI CORP) [A] 1-8 * figure 1 * * paragraphs [0008] - [0011] *; | [AD]WO2018160002 (ANSEN CO LTD [KR]) [AD] 1-8 * figures 1-3 * * paragraphs [0033] , [0040] , [0045] , [0048] * | by applicant | WO2015057152 | BE1012572 | WO2018160002 |