blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3876324

EP3876324 - SECONDARY BATTERY CELL TRANSFER APPARATUS FOR PROCESS OF FOLDING SECONDARY BATTERY CELL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.07.2023
Database last updated on 18.11.2024
FormerThe patent has been granted
Status updated on  05.08.2022
FormerGrant of patent is intended
Status updated on  29.03.2022
FormerRequest for examination was made
Status updated on  06.08.2021
Most recent event   Tooltip15.11.2024Lapse of the patent in a contracting state
New state(s): BG
published on 18.12.2024 [2024/51]
Applicant(s)For all designated states
Clever Co., Ltd.
3, Gukdong-gil
Naesu-eup
Cheongwon-gu
Chungcheongbuk-do
Cheongju-si 28154 / KR
[2021/36]
Inventor(s)01 / JEONG, Jong Hong
Clever Co., Ltd.
45, Yeocheon 3-gil
Ochang-eup
Cheongwong-gu, Chungcheongbuk-do
28127 Cheongju-si / KR
02 / KIM, Sang Jin
Clever Co., Ltd.
204, 1510-dong, 183 Doan-dong-ro, Seo-gu
35355 Daejeon Metropolitan City / KR
 [2021/36]
Representative(s)SJW Patentanwälte
Goethestraße 21
80336 München / DE
[N/P]
Former [2021/36]Scheele, Friedrich
Scheele Wetzel Patentanwälte
Bayerstraße 83
80335 München / DE
Application number, filing date20185977.415.07.2020
[2021/36]
Priority number, dateKR2020002748205.03.2020         Original published format: KR 20200027482
[2021/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3876324
Date:08.09.2021
Language:EN
[2021/36]
Type: B1 Patent specification 
No.:EP3876324
Date:07.09.2022
Language:EN
[2022/36]
Search report(s)(Supplementary) European search report - dispatched on:EP21.01.2021
ClassificationIPC:H01M10/04
[2021/36]
CPC:
H01M10/0404 (EP,CN); B29C65/7847 (KR); B65G47/90 (CN);
H01M10/0583 (US); B29C65/02 (KR); B29C65/74 (KR);
B29C66/433 (KR); B65G37/00 (CN); H01M50/116 (KR);
H01M50/256 (US); B29L2031/3468 (KR); Y02E60/10 (EP);
Y02P70/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/36]
TitleGerman:SEKUNDÄRBATTERIEZELLENTRANSFERVORRICHTUNG FÜR PROZESS DER FALTUNG EINER SEKUNDÄRBATTERIEZELLE[2021/36]
English:SECONDARY BATTERY CELL TRANSFER APPARATUS FOR PROCESS OF FOLDING SECONDARY BATTERY CELL[2021/36]
French:APPAREIL DE TRANSFERT DE CELLULE DE BATTERIE SECONDAIRE POUR UN PROCESSUS DE PLIAGE DE CELLULE DE BATTERIE SECONDAIRE[2021/36]
Examination procedure15.07.2020Examination requested  [2021/36]
30.03.2022Communication of intention to grant the patent
01.08.2022Fee for grant paid
01.08.2022Fee for publishing/printing paid
01.08.2022Receipt of the translation of the claim(s)
Opposition(s)08.06.2023No opposition filed within time limit [2023/33]
Fees paidRenewal fee
19.07.2022Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL07.09.2022
AT07.09.2022
BG07.09.2022
CZ07.09.2022
DK07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
IT07.09.2022
LT07.09.2022
LV07.09.2022
MC07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SI07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
[2024/51]
Former [2024/26]AL07.09.2022
AT07.09.2022
CZ07.09.2022
DK07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
IT07.09.2022
LT07.09.2022
LV07.09.2022
MC07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SI07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2024/14]AL07.09.2022
AT07.09.2022
CZ07.09.2022
DK07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
MC07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SI07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/37]AL07.09.2022
AT07.09.2022
CZ07.09.2022
DK07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SI07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/34]AL07.09.2022
AT07.09.2022
CZ07.09.2022
DK07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/30]AL07.09.2022
AT07.09.2022
CZ07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
NL07.09.2022
RO07.09.2022
RS07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/29]AL07.09.2022
AT07.09.2022
CZ07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RO07.09.2022
RS07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/27]AT07.09.2022
CZ07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RO07.09.2022
RS07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
IS07.01.2023
PT09.01.2023
Former [2023/23]AT07.09.2022
CZ07.09.2022
EE07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RO07.09.2022
RS07.09.2022
SK07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
PT09.01.2023
Former [2023/22]AT07.09.2022
CZ07.09.2022
ES07.09.2022
FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RO07.09.2022
RS07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
PT09.01.2023
Former [2023/20]FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RS07.09.2022
SM07.09.2022
NO07.12.2022
GR08.12.2022
Former [2023/10]FI07.09.2022
HR07.09.2022
LT07.09.2022
LV07.09.2022
RS07.09.2022
NO07.12.2022
GR08.12.2022
Former [2023/09]FI07.09.2022
LT07.09.2022
LV07.09.2022
RS07.09.2022
NO07.12.2022
Former [2023/08]FI07.09.2022
LT07.09.2022
RS07.09.2022
NO07.12.2022
Documents cited:Search[A]KR20040026543  (SFA ENGINEERING CORP) [A] 1-12 * figures 1-22; claims 1-27 *;
 [A]KR20120069902  (YULLIN TECHNOLOGY CO LTD [KR]) [A] 1-12 * figures 1-16 *;
 [A]KR20170089276  (LG CHEMICAL LTD [KR]) [A] 1-12 * claim 1 *;
 [AD]KR101766966B  (JEONG JONG HONG [KR]) [AD] 1-12* figures 1-11; claim 1 *;
 [A]KR101974443B  (KIM YOUNG HUN [KR]) [A] 1-12 * paragraphs [0010] - [0011]; figure 1 *;
 [A]US2019363393  (HASHEM AMJAD QUSAY [US], et al) [A] 1-12 * figures 1,3; claims 1-23 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.