| EP3750736 - HYDRAULIC DRIVE SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.10.2024 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 03.11.2023 | ||
| Former | Grant of patent is intended Status updated on 03.04.2023 | ||
| Former | Examination is in progress Status updated on 07.01.2022 | ||
| Former | Request for examination was made Status updated on 04.06.2021 | ||
| Former | The application has been published Status updated on 13.11.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states New Heights LLC 49 Eagle Dr. Leola, PA 17540 / US | [2020/51] | Inventor(s) | 01 /
BEILER, Aaron Jay 5472 Mountain View Drive Gap, PA 17527 / US | [2020/51] | Representative(s) | Prüfer & Partner mbB Patentanwälte · Rechtsanwälte Sohnckestraße 12 81479 München / DE | [2020/51] | Application number, filing date | 20186901.3 | 08.01.2018 | [2020/51] | Priority number, date | US201715402674 | 10.01.2017 Original published format: US201715402674 | [2020/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3750736 | Date: | 16.12.2020 | Language: | EN | [2020/51] | Type: | B1 Patent specification | No.: | EP3750736 | Date: | 06.12.2023 | Language: | EN | [2023/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.10.2020 | Classification | IPC: | B62D59/04, F16D11/14, F16D23/12, B60K7/00, B60K17/04 | [2023/14] | CPC: |
B62D59/04 (EP,US);
B60K17/046 (EP,US);
B60K7/0015 (EP,US);
B60K8/00 (US);
F16D11/14 (EP,US);
B60K2007/0038 (EP,US);
B60K2007/0092 (EP,US);
B60Y2200/147 (EP,US);
B60Y2400/421 (EP,US);
|
| Former IPC [2020/51] | B60K7/00, B60K17/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/27] |
| Former [2020/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HYDRAULISCHES ANTRIEBSSYSTEM | [2020/51] | English: | HYDRAULIC DRIVE SYSTEM | [2020/51] | French: | SYSTÈME D'ENTRAÎNEMENT HYDRAULIQUE | [2020/51] | Examination procedure | 31.05.2021 | Amendment by applicant (claims and/or description) | 31.05.2021 | Examination requested [2021/27] | 31.05.2021 | Date on which the examining division has become responsible | 07.01.2022 | Despatch of a communication from the examining division (Time limit: M04) | 03.05.2022 | Reply to a communication from the examining division | 04.04.2023 | Communication of intention to grant the patent | 30.08.2023 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 30.10.2023 | Fee for grant paid | 30.10.2023 | Fee for publishing/printing paid | 30.10.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18150656.9 / EP3354506 | Opposition(s) | 09.09.2024 | No opposition filed within time limit [2024/46] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 30.10.2023 | Request for further processing filed | 30.10.2023 | Full payment received (date of receipt of payment) Request granted | 08.11.2023 | Decision despatched | Fees paid | Renewal fee | 21.07.2020 | Renewal fee patent year 03 | 28.01.2021 | Renewal fee patent year 04 | 31.01.2022 | Renewal fee patent year 05 | 19.01.2023 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.01.2018 | HU | 08.01.2018 | AT | 06.12.2023 | CZ | 06.12.2023 | DK | 06.12.2023 | EE | 06.12.2023 | ES | 06.12.2023 | HR | 06.12.2023 | IT | 06.12.2023 | LT | 06.12.2023 | LV | 06.12.2023 | MC | 06.12.2023 | NL | 06.12.2023 | PL | 06.12.2023 | RO | 06.12.2023 | RS | 06.12.2023 | SE | 06.12.2023 | SI | 06.12.2023 | SK | 06.12.2023 | SM | 06.12.2023 | TR | 06.12.2023 | FI | 07.12.2023 | IE | 08.01.2024 | LU | 08.01.2024 | BE | 31.01.2024 | CH | 31.01.2024 | FR | 06.02.2024 | BG | 06.03.2024 | GB | 06.03.2024 | NO | 06.03.2024 | GR | 07.03.2024 | IS | 06.04.2024 | PT | 08.04.2024 | DE | 01.08.2024 | [2026/05] |
| Former [2025/45] | CY | 08.01.2018 | |
| HU | 08.01.2018 | ||
| AT | 06.12.2023 | ||
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| FI | 07.12.2023 | ||
| IE | 08.01.2024 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| FR | 06.02.2024 | ||
| BG | 06.03.2024 | ||
| GB | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2025/41] | CY | 08.01.2018 | |
| HU | 08.01.2018 | ||
| AT | 06.12.2023 | ||
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| IE | 08.01.2024 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| FR | 06.02.2024 | ||
| BG | 06.03.2024 | ||
| GB | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2025/37] | CY | 08.01.2018 | |
| AT | 06.12.2023 | ||
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| IE | 08.01.2024 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| FR | 06.02.2024 | ||
| BG | 06.03.2024 | ||
| GB | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2025/10] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| IE | 08.01.2024 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| FR | 06.02.2024 | ||
| BG | 06.03.2024 | ||
| GB | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2025/09] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| FR | 06.02.2024 | ||
| BG | 06.03.2024 | ||
| GB | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2024/49] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SI | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2024/48] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| CH | 31.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2024/47] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| DK | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BE | 31.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2024/46] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| DE | 01.08.2024 | ||
| Former [2024/45] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| MC | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| Former [2024/43] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| LU | 08.01.2024 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| Former [2024/36] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| IT | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| PL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SK | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| PT | 08.04.2024 | ||
| Former [2024/35] | AT | 06.12.2023 | |
| CZ | 06.12.2023 | ||
| EE | 06.12.2023 | ||
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| RO | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| Former [2024/34] | EE | 06.12.2023 | |
| ES | 06.12.2023 | ||
| HR | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| Former [2024/33] | ES | 06.12.2023 | |
| HR | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| SM | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| Former [2024/32] | ES | 06.12.2023 | |
| HR | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| IS | 06.04.2024 | ||
| Former [2024/26] | ES | 06.12.2023 | |
| HR | 06.12.2023 | ||
| LT | 06.12.2023 | ||
| LV | 06.12.2023 | ||
| NL | 06.12.2023 | ||
| RS | 06.12.2023 | ||
| SE | 06.12.2023 | ||
| BG | 06.03.2024 | ||
| NO | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| Former [2024/21] | LT | 06.12.2023 | |
| BG | 06.03.2024 | ||
| GR | 07.03.2024 | ||
| Former [2024/20] | GR | 07.03.2024 | Documents cited: | Search | [XYI] FR2409162 [X] 1,2,6-10 * figures 1-4 * * page 1 - page 1; figure 4 * * page 2, line 14 - line 30 *[Y] 3-5 [I] 11-15 | [Y] FR1309984 [Y] 3-5 * figures 2, 4, * * page 2, column 1, paragraphs 1, 2 * | [A] US2004200648 (TARASINSKI NICOLAI et al.) [A] 11,12 * figure 1 * * paragraphs [0014] , [0 27] * | [A] US2013160436 (SCHEIBEL JOERG et al.) [A] 1 * figure 2 * * paragraphs [0005] - [0007] - [0 13] - [0020] * |