Extract from the Register of European Patents

EP About this file: EP3772430

EP3772430 - A SEAT FOR A VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.04.2023
Database last updated on 10.03.2026
FormerThe patent has been granted
Status updated on  20.05.2022
FormerGrant of patent is intended
Status updated on  05.01.2022
FormerRequest for examination was made
Status updated on  11.10.2021
FormerGrant of patent is intended
Status updated on  30.09.2021
FormerRequest for examination was made
Status updated on  16.04.2021
FormerThe application has been published
Status updated on  08.01.2021
Most recent event   Tooltip15.11.2024Change - lapse in a contracting state
Updated state(s): BG
published on 18.12.2024  [2024/51]
Applicant(s)For all designated states
Ford Global Technologies, LLC
Suite 800
Fairlane Plaza South
330 Town Center Drive
Dearborn, MI 48126 / US
[2021/06]
Inventor(s)01 / JACKSON, Daniel T.
50 Wash Road Noak Bridge
Basildon, Essex SS15 4EN / GB
02 / NEUGEBAUER, James
104 Watchouse Road
Chelmsford, Essex CM2 8NH / GB
03 / WRIGHT, Ian, Sutherland
17 St. Fabians Drive
Chelmsford, Essex CM1 2PR / GB
04 / MURRAY, James, Nicholas
53 Roxwell Avenue
Chelmsford, Essex CM1 2NX / GB
 [2021/06]
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[2022/25]
Former [2021/06]Haseltine Lake Kempner LLP
138 Cheapside
London EC2V 6BJ / GB
Application number, filing date20187150.622.07.2020
[2021/06]
Priority number, dateGB2019001139609.08.2019         Original published format: GB 201911396
[2021/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3772430
Date:10.02.2021
Language:EN
[2021/06]
Type: B1 Patent specification 
No.:EP3772430
Date:22.06.2022
Language:EN
[2022/25]
Search report(s)(Supplementary) European search report - dispatched on:EP16.12.2020
ClassificationIPC:B60N2/30, B60N3/00
[2021/06]
CPC:
B60N3/004 (EP,CN); B60N2/22 (CN); B60N2/206 (GB);
B60N2/2222 (EP,CN); B60N2/3009 (EP); B60N2/32 (CN);
B60N2/6009 (EP); B60N2/64 (CN); B60N3/001 (GB) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/22]
Former [2021/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Former [2021/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SITZ FÜR EIN FAHRZEUG[2021/06]
English:A SEAT FOR A VEHICLE[2021/06]
French:SIÈGE POUR VÉHICULE[2021/06]
Examination procedure04.03.2021Amendment by applicant (claims and/or description)
13.04.2021Examination requested  [2021/20]
13.04.2021Date on which the examining division has become responsible
01.10.2021Communication of intention to grant the patent
08.10.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
14.01.2022Communication of intention to grant the patent
25.04.2022Receipt of the translation of the claim(s)
13.05.2022Fee for grant paid
13.05.2022Fee for publishing/printing paid
Opposition(s)23.03.2023No opposition filed within time limit [2023/22]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.07.2020
AL22.06.2022
AT22.06.2022
BG22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
MK22.06.2022
MT22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
TR22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
[2024/51]
Former [2024/44]HU22.07.2020
AL22.06.2022
AT22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
MK22.06.2022
MT22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
TR22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2024/29]HU22.07.2020
AL22.06.2022
AT22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
MK22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
TR22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2024/26]HU22.07.2020
AL22.06.2022
AT22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
MK22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2024/23]AL22.06.2022
AT22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
MK22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2024/20]AL22.06.2022
AT22.06.2022
CY22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2024/11]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/37]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/35]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
FR22.08.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/33]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
IE22.07.2022
LU22.07.2022
BE31.07.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/26]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
LU22.07.2022
BE31.07.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/21]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
LU22.07.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/17]AL22.06.2022
AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/16]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/12]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/11]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
PT24.10.2022
Former [2023/09]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RO22.06.2022
RS22.06.2022
SE22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
PT24.10.2022
Former [2023/08]AT22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
SE22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2023/07]AT22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
SE22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2023/02]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
SE22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/50]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
RS22.06.2022
SE22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/49]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
SE22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/47]FI22.06.2022
LT22.06.2022
SE22.06.2022
NO22.09.2022
Documents cited:Search[XY] GB2395118  (FORD GLOBAL TECH LLC et al.) [X] 1-6,13 * abstract * * figures 1-3 *[Y] 7-11
 [X] JPH05221256  (HANSUUYURUGEN TSUEE et al.) [X] 1-4,12,13 * abstract * * figures 1,3 *
 [X] DE102005025544  (JOHNSON CONTROLS GMBH et al.) [X] 1-4,13-15 * abstract * * figures 2a,2b *
 [X] WO2011154638  (PEUGEOT CITROEN AUTOMOBILES SA et al.) [X] 1-4,13 * abstract * * figures 1,2 *
 [Y] FR3008935  (PEUGEOT CITROEN AUTOMOBILES SA et al.) [Y] 7-11 * abstract * * figure 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.