EP3770638 - AUTOMATIC EXTERNAL RF GAIN CALIBRATION AND CONTINUOUS JAMMING MEASUREMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 09.01.2022 | ||
Former | Examination is in progress Status updated on 12.11.2021 | ||
Former | Request for examination was made Status updated on 30.07.2021 | ||
Former | The application has been published Status updated on 25.12.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Rockwell Collins, Inc. 400 Collins Road NE Cedar Rapids, IA 52498 / US | [2021/04] | Inventor(s) | 01 /
ULMER, Karl W. 1320 40th Street Place Marion, IA 52302 / US | 02 /
MUNDT, Troy V. 1320 Harvest Street North Liberty, IA 52317 / US | 03 /
BACHMAN, Gary L. 329 12th Ave SE Cedar Rapids, IA 52401 / US | [2021/04] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2021/04] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 20187309.8 | 23.07.2020 | [2021/04] | Priority number, date | US201916519610 | 23.07.2019 Original published format: US201916519610 | [2021/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3770638 | Date: | 27.01.2021 | Language: | EN | [2021/04] | Type: | B1 Patent specification | No.: | EP3770638 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.12.2020 | Classification | IPC: | G01S19/21, G01S7/40, H04B17/21, H04K3/00, H04W24/00, G01S7/36, H04B1/10, H04B1/18, G01S7/285, G01S7/35 | [2021/04] | CPC: |
G01S19/21 (EP,US);
G01S19/235 (US);
G01S7/285 (EP);
G01S7/352 (EP);
G01S7/4021 (EP);
H04B1/1027 (EP,US);
H04B1/109 (US);
H04B17/21 (EP);
H04K3/22 (EP);
H04K3/94 (EP);
H04B1/18 (US);
H04K2203/32 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/35] |
Former [2021/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | AUTOMATISCHE EXTERNE HF-VERSTÄRKUNGSKALIBRIERUNG UND KONTINUIERLICHE STÖRSENDUNGSMESSUNG | [2021/04] | English: | AUTOMATIC EXTERNAL RF GAIN CALIBRATION AND CONTINUOUS JAMMING MEASUREMENT | [2021/04] | French: | ÉTALONNAGE AUTOMATIQUE DE GAIN RF EXTERNE ET MESURE DE BROUILLAGE CONTINUE | [2021/04] | Examination procedure | 27.07.2021 | Amendment by applicant (claims and/or description) | 27.07.2021 | Examination requested [2021/35] | 27.07.2021 | Date on which the examining division has become responsible | 10.11.2021 | Despatch of a communication from the examining division (Time limit: M01) | 24.11.2021 | Reply to a communication from the examining division | 10.01.2022 | Communication of intention to grant the patent | 28.03.2022 | Fee for grant paid | 28.03.2022 | Fee for publishing/printing paid | 28.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.07.2020 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | IT | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | MT | 04.05.2022 | NL | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SE | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | TR | 04.05.2022 | IE | 23.07.2022 | LU | 23.07.2022 | BE | 31.07.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/44] |
Former [2024/29] | HU | 23.07.2020 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
TR | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/26] | HU | 23.07.2020 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/23] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/20] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/11] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/33] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 23.07.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 23.07.2022 | ||
BE | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/21] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 23.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/11] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/08] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/48] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Documents cited: | Search | [A]US2012176209 (VILLAIN FREDERIC FRANCOIS [FR], et al) [A] 1-15 * figure 1 * * paragraphs [0006] - [0008] *; | [A]US2014065994 (YOUNG LAWRENCE E [US], et al) [A] 1-15* abstract *; | [A]US2014184443 (RILEY STUART [US], et al) [A] 1-15 * abstract *; | [A]US9673917 (CONROY CORMAC S [US], et al) [A] 1-15 * abstract * |