| EP3782719 - METHOD FOR MANUFACTURING AN EXCHANGE ELEMENT OF AN EXCHANGER WITH DOUBLE GAS FLOW [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.10.2024 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 17.11.2023 | ||
| Former | Grant of patent is intended Status updated on 08.11.2023 | ||
| Former | Request for examination was made Status updated on 13.09.2023 | ||
| Former | Grant of patent is intended Status updated on 29.05.2023 | ||
| Former | Request for examination was made Status updated on 22.01.2021 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states Commissariat à l'Energie Atomique et aux Energies Alternatives 25 Rue Leblanc Bat Le Ponant 75015 Paris / FR | [2024/44] |
| Former [2021/08] | For all designated states COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES 25, Rue Leblanc Bâtiment "Le Ponant D" 75015 Paris / FR | Inventor(s) | 01 /
MARIOTTO, Mathieu c/o CEA GRENOBLE 17 rue des Martyrs 38054 Grenoble Cedex 09 / FR | 02 /
BIGARRE, Janick c/o CEA GRENOBLE 17 rue des Martyrs 38054 Grenoble Cedex 09 / FR | [2021/08] | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [2023/51] |
| Former [2021/08] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 20187828.7 | 27.07.2020 | [2021/08] | Priority number, date | FR20190008822 | 01.08.2019 Original published format: FR 1908822 | [2021/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | EP3782719 | Date: | 24.02.2021 | Language: | FR | [2021/08] | Type: | A3 Search report | No.: | EP3782719 | Date: | 19.05.2021 | Language: | FR | [2021/20] | Type: | B1 Patent specification | No.: | EP3782719 | Date: | 20.12.2023 | Language: | FR | [2023/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.04.2021 | Classification | IPC: | B01D63/08, B01D63/14, B01D67/00, F28D9/00, F28D21/00, F28F13/00, F28F3/00, F28F21/06 | [2021/08] | CPC: |
B01D63/081 (EP);
B01D63/082 (EP,US);
B01D63/14 (EP);
F28D21/0014 (EP);
F28D21/0015 (EP);
F28D9/0037 (EP);
F28F13/003 (EP);
F28F21/06 (EP);
B01D2315/22 (EP);
B01D2323/42 (EP);
B01D2323/52 (EP);
B01D63/085 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/08] | Title | German: | HERSTELLUNGSVERFAHREN EINES AUSTAUSCHELEMENTS EINES DOPPELGASSTROMTAUSCHERS | [2021/08] | English: | METHOD FOR MANUFACTURING AN EXCHANGE ELEMENT OF AN EXCHANGER WITH DOUBLE GAS FLOW | [2021/08] | French: | PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT D'ÉCHANGE D'UN ÉCHANGEUR À DOUBLE FLUX DE GAZ | [2021/08] | Examination procedure | 27.07.2020 | Examination requested [2021/08] | 12.08.2021 | Amendment by applicant (claims and/or description) | 30.05.2023 | Communication of intention to grant the patent | 13.09.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.11.2023 | Communication of intention to grant the patent | 09.11.2023 | Fee for grant paid | 09.11.2023 | Fee for publishing/printing paid | 09.11.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 23.09.2024 | No opposition filed within time limit [2024/48] | Fees paid | Renewal fee | 21.07.2022 | Renewal fee patent year 03 | 21.07.2023 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 27.07.2020 | HU | 27.07.2020 | AT | 20.12.2023 | CZ | 20.12.2023 | DK | 20.12.2023 | EE | 20.12.2023 | ES | 20.12.2023 | FI | 20.12.2023 | HR | 20.12.2023 | IT | 20.12.2023 | LT | 20.12.2023 | LV | 20.12.2023 | MC | 20.12.2023 | NL | 20.12.2023 | PL | 20.12.2023 | RO | 20.12.2023 | RS | 20.12.2023 | SI | 20.12.2023 | SK | 20.12.2023 | SM | 20.12.2023 | BG | 20.03.2024 | NO | 20.03.2024 | GR | 21.03.2024 | IS | 20.04.2024 | PT | 22.04.2024 | IE | 27.07.2024 | LU | 27.07.2024 | BE | 31.07.2024 | CH | 31.07.2024 | [2026/16] |
| Former [2026/10] | CY | 27.07.2020 | |
| AT | 20.12.2023 | ||
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| MC | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| IE | 27.07.2024 | ||
| LU | 27.07.2024 | ||
| BE | 31.07.2024 | ||
| CH | 31.07.2024 | ||
| Former [2025/36] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| MC | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| IE | 27.07.2024 | ||
| LU | 27.07.2024 | ||
| BE | 31.07.2024 | ||
| CH | 31.07.2024 | ||
| Former [2025/22] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| MC | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| LU | 27.07.2024 | ||
| BE | 31.07.2024 | ||
| CH | 31.07.2024 | ||
| Former [2025/17] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| MC | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| LU | 27.07.2024 | ||
| Former [2025/11] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| MC | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| Former [2024/49] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SI | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| Former [2024/47] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| DK | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| Former [2024/36] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| IT | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| PL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SK | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| PT | 22.04.2024 | ||
| Former [2024/35] | AT | 20.12.2023 | |
| CZ | 20.12.2023 | ||
| EE | 20.12.2023 | ||
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| RO | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| Former [2024/34] | EE | 20.12.2023 | |
| ES | 20.12.2023 | ||
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| Former [2024/33] | ES | 20.12.2023 | |
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| SM | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| Former [2024/32] | ES | 20.12.2023 | |
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| IS | 20.04.2024 | ||
| Former [2024/26] | ES | 20.12.2023 | |
| FI | 20.12.2023 | ||
| HR | 20.12.2023 | ||
| LT | 20.12.2023 | ||
| LV | 20.12.2023 | ||
| NL | 20.12.2023 | ||
| RS | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| NO | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| Former [2024/21] | FI | 20.12.2023 | |
| LT | 20.12.2023 | ||
| BG | 20.03.2024 | ||
| GR | 21.03.2024 | ||
| Former [2024/20] | GR | 21.03.2024 | Documents cited: | Search | [I] US2018292146 (FURRER DAVID ULRICH et al.) | [I] EP3296678 (COMMISSARIAT ENERGIE ATOMIQUE et al.) [I] 1,2,7-10 * paragraphs [0042] , [0029] - [0036]; figures 2,3,6 * | [A] US2016121005 (NAKAHARA TAKAHIRO et al.) | [A] JPH0418923 (DAICEL CHEM et al.) [A] 1,2,7-10 * the whole document * | [I] SCHEITHAUER UWE ET AL: "Additive Manufacturing of Ceramic Heat Exchanger: Opportunities and Limits of the Lithography-Based Ceramic Manufacturing (LCM)", JOURNAL OF MATERIALS ENGINEERING AND PERFORMANCE, ASM INTERNATIONAL, MATERIALS PARK, OH, US, vol. 27, no. 1, 1 August 2017 (2017-08-01), pages 14 - 20, XP036409288, ISSN: 1059-9495, [retrieved on 20170801], DOI: 10.1007/S11665-017-2843-Z DOI: http://dx.doi.org/10.1007/s11665-017-2843-z | by applicant | EP3296678 |