EP3792020 - RAZOR ASSEMBLY FOR RAZOR WITH INDUCTION HEATING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.05.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 23.06.2023 | ||
Former | Grant of patent is intended Status updated on 13.04.2023 | ||
Former | Request for examination was made Status updated on 17.09.2021 | ||
Former | The application has been published Status updated on 12.02.2021 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): BE, SI | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states Dorco Co., Ltd. 36-9 Hyoryeong-ro, 70-gil Seocho-gu Seoul 06723 / KR | [2021/11] | Inventor(s) | 01 /
JANG, Sejun c/o Dorco Co., Ltd. 36-9, Hyoryeong-ro 70-gil Seocho-gu 06723 Seoul / KR | 02 /
LEE, Youngjin c/o Dorco Co., Ltd. 36-9, Hyoryeong-ro 70-gil Seocho-gu 06723 Seoul / KR | [2021/11] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2021/11] | Application number, filing date | 20190427.3 | 11.08.2020 | [2021/11] | Priority number, date | US201916567999 | 11.09.2019 Original published format: US201916567999 | [2021/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3792020 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Type: | B1 Patent specification | No.: | EP3792020 | Date: | 26.07.2023 | Language: | EN | [2023/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.01.2021 | Classification | IPC: | B26B21/48, B26B21/40 | [2021/11] | CPC: |
B26B21/48 (EP,KR,US);
B26B21/20 (KR);
B26B21/222 (US);
B26B21/4012 (KR);
B26B21/4018 (US);
B26B21/4043 (KR);
B26B21/405 (EP);
B26B21/52 (KR);
B26B21/521 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/42] |
Former [2021/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RASIERANORDNUNG FÜR RASIERER MIT INDUKTIONSHEIZSYSTEM | [2021/11] | English: | RAZOR ASSEMBLY FOR RAZOR WITH INDUCTION HEATING SYSTEM | [2021/11] | French: | ENSEMBLE RASOIR DOTÉ D'UN SYSTÈME DE CHAUFFAGE À INDUCTION | [2021/11] | Examination procedure | 15.09.2021 | Amendment by applicant (claims and/or description) | 15.09.2021 | Examination requested [2021/42] | 15.09.2021 | Date on which the examining division has become responsible | 14.04.2023 | Communication of intention to grant the patent | 16.06.2023 | Fee for grant paid | 16.06.2023 | Fee for publishing/printing paid | 16.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2024 | No opposition filed within time limit [2024/27] | Fees paid | Renewal fee | 25.08.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.07.2023 | CZ | 26.07.2023 | DK | 26.07.2023 | EE | 26.07.2023 | FI | 26.07.2023 | HR | 26.07.2023 | IT | 26.07.2023 | LT | 26.07.2023 | LV | 26.07.2023 | MC | 26.07.2023 | NL | 26.07.2023 | PL | 26.07.2023 | RO | 26.07.2023 | RS | 26.07.2023 | SE | 26.07.2023 | SI | 26.07.2023 | SK | 26.07.2023 | SM | 26.07.2023 | IE | 11.08.2023 | LU | 11.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | NO | 26.10.2023 | GR | 27.10.2023 | IS | 26.11.2023 | PT | 27.11.2023 | [2024/36] |
Former [2024/33] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
IE | 11.08.2023 | ||
LU | 11.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/26] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 11.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/23] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 11.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/22] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 11.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/21] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 11.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/20] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/10] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
NL | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/09] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
LT | 26.07.2023 | ||
NL | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/08] | LT | 26.07.2023 | |
NL | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
Former [2024/05] | NL | 26.07.2023 | Documents cited: | Search | [XI]US2012227265 (TOMASSETTI LOUIS D [US], et al) [X] 14,15 * paragraphs [0005] - [0007] * * paragraphs [0027] - [0036] * * figures 1-10 * [I] 1-13; | [A]US2012248882 (URANO TAKASHI [JP]) [A] 1-15* the whole document *; | [A]US2015135538 (TOMASSETTI LOUIS D [US], et al) [A] 1-15 * the whole document *; | [A]EP3354425 (BRAUN GMBH [DE]) [A] 1-15 * paragraphs [0008] - [0036] * * figures 1-5 * |