EP3954976 - METHOD AND DEVICE FOR TEMPERATURE PREDICTION [Right-click to bookmark this link] | |||
Former [2022/07] | METHOD AND DEVICE FOR TEMPERATURE PREDICTION AS WELL AS SENSOR SYSTEM WITH SUCH A DEVICE | ||
[2023/39] | Status | No opposition filed within time limit Status updated on 11.10.2024 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 03.11.2023 | ||
Former | Grant of patent is intended Status updated on 13.09.2023 | ||
Former | Examination is in progress Status updated on 05.08.2022 | ||
Former | Request for examination was made Status updated on 14.01.2022 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Baumer A/S Runetoften 19 8210 Arhus / DK | [2022/07] | Inventor(s) | 01 /
Jensen, Kurt Möller 8700 Horsens / DK | 02 /
Dawood, Martin 8000 Aarhus / DK | [2022/07] | Representative(s) | Strauss, Steffen Baumer Innotec AG Hummelstrasse 17 Group Intellectual Property 8501 Frauenfeld / CH | [2022/07] | Application number, filing date | 20190758.1 | 12.08.2020 | [2022/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3954976 | Date: | 16.02.2022 | Language: | EN | [2022/07] | Type: | B1 Patent specification | No.: | EP3954976 | Date: | 06.12.2023 | Language: | EN | [2023/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.01.2021 | Classification | IPC: | G01K3/02, G01K7/42 | [2022/07] | CPC: |
G01K7/42 (EP);
G01K3/02 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/07] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR TEMPERATURVORHERSAGE | [2023/39] | English: | METHOD AND DEVICE FOR TEMPERATURE PREDICTION | [2023/39] | French: | PROCÉDÉ ET DISPOSITIF DE PRÉDICTION DE TEMPÉRATURE | [2023/39] |
Former [2022/07] | VERFAHREN UND VORRICHTUNG ZUR TEMPERATURVORHERSAGE SOWIE SENSORSYSTEM MIT SOLCH EINER VORRICHTUNG | ||
Former [2022/07] | METHOD AND DEVICE FOR TEMPERATURE PREDICTION AS WELL AS SENSOR SYSTEM WITH SUCH A DEVICE | ||
Former [2022/07] | PROCÉDÉ ET DISPOSITIF DE PRÉDICTION DE TEMPÉRATURE ET SYSTÈME DE CAPTEUR COMPORTANT UN TEL DISPOSITIF | Examination procedure | 08.06.2021 | Amendment by applicant (claims and/or description) | 08.06.2021 | Examination requested [2022/07] | 08.06.2021 | Date on which the examining division has become responsible | 04.08.2022 | Despatch of a communication from the examining division (Time limit: M04) | 17.11.2022 | Reply to a communication from the examining division | 23.06.2023 | Despatch of a communication from the examining division (Time limit: M04) | 18.08.2023 | Reply to a communication from the examining division | 14.09.2023 | Communication of intention to grant the patent | 23.10.2023 | Fee for grant paid | 23.10.2023 | Fee for publishing/printing paid | 23.10.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 09.09.2024 | No opposition filed within time limit [2024/46] | Fees paid | Renewal fee | 18.08.2022 | Renewal fee patent year 03 | 17.08.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 06.12.2023 | CZ | 06.12.2023 | DK | 06.12.2023 | EE | 06.12.2023 | ES | 06.12.2023 | HR | 06.12.2023 | LT | 06.12.2023 | LV | 06.12.2023 | NL | 06.12.2023 | PL | 06.12.2023 | RO | 06.12.2023 | RS | 06.12.2023 | SE | 06.12.2023 | SI | 06.12.2023 | SK | 06.12.2023 | SM | 06.12.2023 | BG | 06.03.2024 | NO | 06.03.2024 | GR | 07.03.2024 | IS | 06.04.2024 | PT | 08.04.2024 | [2024/49] |
Former [2024/47] | AT | 06.12.2023 | |
CZ | 06.12.2023 | ||
DK | 06.12.2023 | ||
EE | 06.12.2023 | ||
ES | 06.12.2023 | ||
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
PL | 06.12.2023 | ||
RO | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
SK | 06.12.2023 | ||
SM | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
PT | 08.04.2024 | ||
Former [2024/36] | AT | 06.12.2023 | |
CZ | 06.12.2023 | ||
EE | 06.12.2023 | ||
ES | 06.12.2023 | ||
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
PL | 06.12.2023 | ||
RO | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
SK | 06.12.2023 | ||
SM | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
PT | 08.04.2024 | ||
Former [2024/35] | AT | 06.12.2023 | |
CZ | 06.12.2023 | ||
EE | 06.12.2023 | ||
ES | 06.12.2023 | ||
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
RO | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
SM | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
Former [2024/34] | EE | 06.12.2023 | |
ES | 06.12.2023 | ||
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
SM | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
Former [2024/33] | ES | 06.12.2023 | |
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
SM | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
Former [2024/32] | ES | 06.12.2023 | |
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
IS | 06.04.2024 | ||
Former [2024/26] | ES | 06.12.2023 | |
HR | 06.12.2023 | ||
LT | 06.12.2023 | ||
LV | 06.12.2023 | ||
NL | 06.12.2023 | ||
RS | 06.12.2023 | ||
SE | 06.12.2023 | ||
BG | 06.03.2024 | ||
NO | 06.03.2024 | ||
GR | 07.03.2024 | ||
Former [2024/21] | LT | 06.12.2023 | |
BG | 06.03.2024 | ||
GR | 07.03.2024 | ||
Former [2024/20] | GR | 07.03.2024 | Documents cited: | Search | [XI]JPS60114729 (OMRON TATEISI ELECTRONICS CO) [X] 13 * the whole document * [I] 1-12,14,15; | [XI]US2005041722 (TOKITA MUNEO [JP], et al) [X] 13 * paragraphs [0006] , [0007] , [0026] , [0030] - [0041] * [I] 1-12,14,15; | [XI]US2010169050 (RAZZAGHI MAHMOUD [US]) [X] 13 * paragraphs [0018] - [0023] * [I] 1-12,14,15; | [XI]US2010324851 (SCHNEIDER ULRICH [DE]) [X] 13 * paragraphs [0005] , [0009] , [0013] , [0014] , [0018] - [0022] * [I] 1-12,14,15; | [A] - Anonymous, "Forecast Combination Model Specification Window", (19990101), URL: https://web.archive.org/web/20040427222838/https://v8doc.sas.com/sashtml/ets/chap25/sect8.htm, (20201217), XP055761186 [A] 1-15 * page 1, paragraph 1 * | Examination | - Rozante J. R. ET AL, "Multi-model ensemble: technique and validation", Geoscientific Model Development Discussions, doi:10.5194/gmdd-7-2933-2014, (20141014), pages 1 - 12, URL: https://www.researchgate.net/profile/Demerval-Moreira/publication/274679130_Multi-model_ensemble_Technique_and_validation/links/5645e90408ae9f9c13e72365/Multi-model-ensemble-Technique-and-validation.pdf, (20230616), XP093054937 DOI: http://dx.doi.org/10.5194/gmdd-7-2933-2014 |