blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3822025

EP3822025 - CLAMPING FIXTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.06.2024
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  30.06.2023
FormerGrant of patent is intended
Status updated on  01.06.2023
FormerRequest for examination was made
Status updated on  01.05.2023
FormerGrant of patent is intended
Status updated on  28.02.2023
FormerRequest for examination was made
Status updated on  08.10.2021
FormerThe application has been published
Status updated on  16.04.2021
Most recent event   Tooltip12.07.2024Lapse of the patent in a contracting state
New state(s): IE
published on 14.08.2024  [2024/33]
Applicant(s)For all designated states
Sikla Holding GmbH
Kornstrasse 4
4614 Marchtrenk / AT
[2021/20]
Inventor(s)01 / Menz, Peter
Ulmenring 15
78661 Dietingen / DE
02 / Braack, Ellen
Böttinger Straße 2/1
78549 Spaichingen / DE
 [2021/20]
Representative(s)Mertzlufft-Paufler, Cornelius, et al
Maucher Jenkins
Patent- und Rechtsanwälte
Urachstraße 23
79102 Freiburg im Breisgau / DE
[2021/20]
Application number, filing date20193709.131.08.2020
[2021/20]
Priority number, dateDE20191013047812.11.2019         Original published format: DE102019130478
[2021/20]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3822025
Date:19.05.2021
Language:DE
[2021/20]
Type: B1 Patent specification 
No.:EP3822025
Date:02.08.2023
Language:DE
[2023/31]
Search report(s)(Supplementary) European search report - dispatched on:EP10.02.2021
ClassificationIPC:B25B5/10, B25B5/12, B25B5/14, F16L3/24, // F16L3/10
[2023/10]
CPC:
B25B5/102 (EP); B25B5/12 (EP); B25B5/14 (EP);
F16L3/24 (EP); F16L3/1016 (EP)
Former IPC [2021/20]B25B5/10, B25B5/12, B25B5/14, F16L3/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/45]  
Former [2021/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINSPANNBEFESTIGUNG[2021/20]
English:CLAMPING FIXTURE[2021/20]
French:FIXATION DE SERRAGE[2021/20]
Examination procedure01.10.2021Amendment by applicant (claims and/or description)
01.10.2021Examination requested  [2021/45]
01.10.2021Date on which the examining division has become responsible
01.03.2023Communication of intention to grant the patent
27.04.2023Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
27.04.2023Fee for grant paid
27.04.2023Fee for publishing/printing paid
02.06.2023Communication of intention to grant the patent
23.06.2023Receipt of the translation of the claim(s)
Opposition(s)03.05.2024No opposition filed within time limit [2024/28]
Fees paidRenewal fee
15.08.2022Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ02.08.2023
ES02.08.2023
HR02.08.2023
MC02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SK02.08.2023
SM02.08.2023
CH31.08.2023
IE31.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
[2024/33]
Former [2024/28]CZ02.08.2023
ES02.08.2023
HR02.08.2023
MC02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SK02.08.2023
SM02.08.2023
CH31.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/23]CZ02.08.2023
ES02.08.2023
HR02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SK02.08.2023
SM02.08.2023
CH31.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/20]HR02.08.2023
PL02.08.2023
RS02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/10]HR02.08.2023
PL02.08.2023
RS02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/09]NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/08]NO02.11.2023
GR03.11.2023
Documents cited:Search[A]DE4435556  (STANGE PAUL [DE]) [A] 1-9 * column 2, line 25 - column 3, line 15; figures 1,5,7 *;
 [A]DE29513823U  (BERNECKER KLAUS D [DE]) [A] 1-9 * page 9, line 30 - page 16, line 11; figures 1,2,3,4 *;
 [Y]DE29515032U  (BERNECKER KLAUS DIETER [DE]) [Y] 2-4,9 * page 6, line 21 - page 8, line 30; figures 3,5 *;
 [A]DE19653538  (SIKLA GMBH & CO KG [DE]) [A] 1-9 * column 6, line 16 - column 7, line 60; figures 5,6 *;
 [A]DE29922212U  (STANGE PAUL [DE]) [A] 1-9 * paragraphs [0037] - [0050]; figures 1,3 *;
 [XY]EP1043532  (STANGE PAUL [DE]) [X] 1,6-8 * paragraphs [0014] - [0037]; figures 1-8,17 * [Y] 2-4,9;
 [A]DE19961003  (STANGE PAUL [DE]) [A] 1-9* paragraphs [0017] - [0032]; figures 1,3,5,8 *;
 [A]DE202010006322U  (SIKLA HOLDING GMBH [AT]) [A] 1-9 * paragraphs [0026] - [0033]; figure 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.