EP3790145 - POWER DISTRIBUTION UNIT FOR MANAGING TRANSPORT CLIMATE CONTROL LOADS [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 14.10.2022 Database last updated on 30.10.2024 | |
Former | Request for examination was made Status updated on 17.09.2021 | ||
Former | The application has been published Status updated on 05.02.2021 | Most recent event Tooltip | 19.09.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Thermo King LLC 314 West 90th Street Minneapolis, MN 55420 / US | [2023/18] |
Former [2021/10] | For all designated states Thermo King Corporation 314 West 90th Street Minneapolis, MN 55420 / US | Inventor(s) | 01 /
SCHUMACHER, Ryan Wayne 4107 Pebblebrook Drive Bloomington, MN 55437 / US | 02 /
CREGAN, Nicholas Allan 1816 Chatsworth St N Roseville, MN 55113 / US | 03 /
LEASURE, Mark D 2077 Marble Lane Eagan, MN 55122 / US | 04 /
VANOUS, Michael James 5732 Sheridan Ave S. Minneapolis, MN 55410 / US | [2021/10] | Representative(s) | Haseltine Lake Kempner LLP One Portwall Square Portwall Lane Bristol BS1 6BH / GB | [N/P] |
Former [2021/10] | Haseltine Lake Kempner LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 20195240.5 | 09.09.2020 | [2021/10] | Priority number, date | US201916565205 | 09.09.2019 Original published format: US201916565205 | [2021/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3790145 | Date: | 10.03.2021 | Language: | EN | [2021/10] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.02.2021 | Classification | IPC: | H02J1/08, H02J7/34 | [2021/10] | CPC: |
H02J1/084 (EP,US);
B60H1/32 (CN);
B60L1/02 (US);
B60H1/00428 (CN,US);
B60R16/033 (CN,US);
B65D90/00 (CN);
H02J7/34 (EP);
H02J7/35 (EP);
H02M1/10 (CN);
H02M3/00 (CN);
H02M7/66 (CN);
B60H1/3226 (US);
B60H1/3232 (US);
B60L1/003 (US);
B60P3/20 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/42] |
Former [2021/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | STROMVERTEILUNGSEINHEIT ZUR STEUERUNG VON TRANSPORTKLIMAREGELUNGSLASTEN | [2021/10] | English: | POWER DISTRIBUTION UNIT FOR MANAGING TRANSPORT CLIMATE CONTROL LOADS | [2021/10] | French: | UNITÉ DE DISTRIBUTION D'ÉNERGIE ACCESSOIRE POUR LA GESTION DES CHARGES DE RÉGULATION CLIMATIQUE DANS LE TRANSPORT | [2021/10] | Examination procedure | 10.09.2021 | Amendment by applicant (claims and/or description) | 10.09.2021 | Examination requested [2021/42] | 10.09.2021 | Date on which the examining division has become responsible | 14.10.2022 | Despatch of a communication from the examining division (Time limit: M06) | 24.04.2023 | Reply to a communication from the examining division | Fees paid | Renewal fee | 21.09.2022 | Renewal fee patent year 03 | 20.09.2023 | Renewal fee patent year 04 | 19.09.2024 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]US2015246593 (LARSON GERALD [US], et al) [X] 1,2,4,5,7-12,14,15 * figure 3 * * paragraphs [0002] , [0 19] - [0041] *[I] 3,6,13 | by applicant | US8441228 | US19630165650 | US20100165651 | EP20190382776 |