EP3835546 - STRUT STRUCTURE WITH STRIP FOR EXHAUST DIFFUSER AND GAS TURBINE HAVING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 28.04.2023 | ||
Former | Grant of patent is intended Status updated on 11.01.2023 | ||
Former | Request for examination was made Status updated on 14.05.2021 | Most recent event Tooltip | 18.10.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 20.11.2024 [2024/47] | Applicant(s) | For all designated states Doosan Enerbility Co., Ltd. 22, Doosanvolvo-ro Seongsan-gu Changwon-si, Gyeongsangnam-do 51711 / KR | [2022/40] |
Former [2021/24] | For all designated states Doosan Heavy Industries & Construction Co., Ltd. 22, Doosan volvo-ro, Seongsan-gu Changwon-si Gyeongsangnam-do, 51711 / KR | Inventor(s) | 01 /
CHO, Seung Hyun 109-1103, 197, Hapseongbuk 16-gil, Masanhoewon-gu Changwon-si 51208 Gyeongsangnam-do / KR | 02 /
LEE, Ik Sang 201, 267-5, Neungdong-ro, Gwangjin-gu 04997 Seoul / KR | [2021/24] | Representative(s) | Ter Meer Steinmeister & Partner Patentanwälte mbB Nymphenburger Straße 4 80335 München / DE | [2021/24] | Application number, filing date | 20208526.2 | 19.11.2020 | [2021/24] | Priority number, date | KR20190167192 | 13.12.2019 Original published format: KR 20190167192 | [2021/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3835546 | Date: | 16.06.2021 | Language: | EN | [2021/24] | Type: | B1 Patent specification | No.: | EP3835546 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.04.2021 | Classification | IPC: | F01D5/14, F01D25/16, F01D25/30 | [2021/24] | CPC: |
F01D5/145 (EP);
F01D25/30 (EP,CN,KR,US);
F01D25/162 (EP);
F02C7/00 (CN);
F02C7/18 (KR);
F05D2220/32 (KR,US);
F05D2240/12 (US);
F05D2240/127 (KR);
F05D2240/35 (KR);
F05D2250/12 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/34] |
Former [2021/24] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STREBENSTRUKTUR MIT LEISTE FÜR EINEN ABGASDIFFUSOR UND GASTURBINE DAMIT | [2021/24] | English: | STRUT STRUCTURE WITH STRIP FOR EXHAUST DIFFUSER AND GAS TURBINE HAVING THE SAME | [2021/24] | French: | STRUCTURE DE PLAQUE D'APPUI AVEC BANDE DE DIFFUSEUR D'ÉCHAPPEMENT ET TURBINE À GAZ LA COMPRENANT | [2021/24] | Examination procedure | 19.11.2020 | Examination requested [2021/24] | 15.07.2021 | Amendment by applicant (claims and/or description) | 12.01.2023 | Communication of intention to grant the patent | 29.03.2023 | Fee for grant paid | 29.03.2023 | Fee for publishing/printing paid | 20.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2024 | No opposition filed within time limit [2024/19] | Fees paid | Renewal fee | 14.11.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | IT | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | MC | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | NO | 31.08.2023 | GR | 01.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | IE | 19.11.2023 | LU | 19.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | [2024/47] |
Former [2024/46] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
IE | 19.11.2023 | ||
LU | 19.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/34] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
LU | 19.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/32] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/26] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/10] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/08] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/03] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/01] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/52] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/51] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/50] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
PL | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/48] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
Former [2023/46] | ES | 31.05.2023 | Documents cited: | Search | [X]EP0970292 (NORRIS THOMAS R [US]) [X] 1-4,8,11,15 * paragraph [0013] - paragraph [0015]; figures 1,2a,2b * * paragraph [0036]; figure 4 *; | [X]WO2005100752 (NORRIS THOMAS R [US]) [X] 1-4,8,11,15 * paragraph [0048] - paragraph [0050] * * paragraph [0095] - paragraph [0096]; figures 6a,6b2 * * paragraph [0099] - paragraph [0100]; figure 8b * * paragraph [0108] - paragraph [0109]; figure 11d *; | [X]US2013164488 (WOOD TREVOR HOWARD [US], et al) [X] 1-3,8,11,12,14,15 * paragraph [0022] * * paragraph [0034]; figure 4 * * paragraph [0041]; figures 9-10 *; | [A]EP2679793 (ALSTOM TECHNOLOGY LTD [CH]) [A] 1-3,9-13,15 * paragraph [0019] - paragraph [0020]; figure 1 ** paragraph [0023] - paragraph [0027]; figure 3 *; | [XA]US2014060062 (SUBBAREDDYAR THANGARAJ [IN], et al) [X] 1-3,8,15 * paragraph [0017]; figure 1 * * paragraph [0019]; figures 2-3 * * paragraph [0027] - paragraph [0030]; figures 4-5 * [A] 4-7; | [A]EP3543463 (UNITED TECHNOLOGIES CORP [US]) [A] 1-3,9,11-13,15 * paragraph [0025]; figure 1 * * paragraph [0035] - paragraph [0037]; figure 5 * * paragraph [0038]; figure 6 * |