blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3838542

EP3838542 - METHOD AND APPARATUS FOR FORMING A COMPOSITE FUSELAGE STRUCTURE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  12.05.2023
Database last updated on 06.07.2024
FormerRequest for examination was made
Status updated on  24.12.2021
FormerThe application has been published
Status updated on  21.05.2021
Most recent event   Tooltip27.11.2023New entry: Renewal fee paid 
Applicant(s)For all designated states
The Boeing Company
929 Long Bridge Drive
Arlington, VA 22202 / US
[2023/12]
Former [2021/25]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / MARCOE, Jeffery Lee
100 N. Riverside Plaza
CHICAGO, IL 60606 / US
02 / MATSEN, Marc R.
100 N. Riverside Plaza
CHICAGO, IL 60606 / US
 [2021/25]
Representative(s)Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
[2021/25]
Application number, filing date20209778.825.11.2020
[2021/25]
Priority number, dateUS20191671870918.12.2019         Original published format: US201916718709
[2021/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3838542
Date:23.06.2021
Language:EN
[2021/25]
Search report(s)(Supplementary) European search report - dispatched on:EP17.05.2021
ClassificationIPC:B29C35/08, B29C65/18, B29C65/32, B29C65/00, B29C70/46, B29D99/00, B29C70/22, B29C70/34, B29C70/44, // B29C35/16, B29C43/36, B29K101/12, B29L31/30
[2021/25]
CPC:
B29C70/549 (EP); B64F5/10 (CN); B29C70/342 (EP,US);
B29C35/0805 (EP); B29C70/222 (EP); B29C70/345 (EP,US);
B29C70/446 (EP); B29C70/462 (EP,US); B29C70/541 (US);
B29D99/0014 (EP); B29C2035/0811 (EP); B29C2043/3649 (EP);
B29K2101/12 (EP,US); B29L2031/3082 (EP,US); B32B2305/184 (EP);
B64C2001/0072 (CN); Y02T50/40 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/04]
Former [2021/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM FORMEN EINER ZUSAMMENGESETZTEN RUMPFSTRUKTUR[2021/25]
English:METHOD AND APPARATUS FOR FORMING A COMPOSITE FUSELAGE STRUCTURE[2021/25]
French:PROCÉDÉ ET APPAREIL DE FORMATION D'UNE STRUCTURE DE FUSELAGE COMPOSITE[2021/25]
Examination procedure21.12.2021Amendment by applicant (claims and/or description)
21.12.2021Examination requested  [2022/04]
21.12.2021Date on which the examining division has become responsible
11.05.2023Despatch of a communication from the examining division (Time limit: M04)
16.08.2023Reply to a communication from the examining division
Fees paidRenewal fee
28.11.2022Renewal fee patent year 03
27.11.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO02072337  (EMS CHEMIE AG [CH], et al) [A] 1-15* abstract *;
 [Y]US8770081  (DAVID PATRICK [FR], et al) [Y] 9 * abstract * * column 1, line 31 - line 46 * * column 2, line 26 - line 32 * * column 3, line 18 - line 26 *;
 [IA]US2015013883  (MATSEN MARC ROLLO [US], et al) [I] 1,3,8 * abstract * * paragraph [0015] * * paragraph [0060] * * paragraph [0091] * * paragraph [0093] * * paragraph [0095] * * paragraph [0109] * * paragraph [0129] * * paragraph [0132] * * paragraph [0133] * * paragraph [0135] - paragraph [0137] * * paragraph [0139] * * paragraph [0141] * * paragraph [0153] - paragraph [0155] * * paragraph [0130] * * paragraph [0138] * [A] 9-15;
 [Y]WO2019020583  (ROCTOOL [FR], et al) [Y] 9 * figures 1,3,5 * * page 5, line 29 - page 6, line 4 * * page 13, line 16 - page 14, line 20 * * page 5, line 15 - line 20 * * page 11, line 11 - line 13 * * page 6, line 25 - line 31 * * page 6, line 32 - page 7, line 12 * * page 11, line 29 - line 30 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.