blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4012173

EP4012173 - A SYSTEM FOR A TOWER SEGMENT OF A TOWER, A RESPECTIVE TOWER SEGMENT, AND A WIND TURBINE HAVING A TOWER SEGMENT [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  16.12.2022
Database last updated on 01.10.2024
FormerThe application has been published
Status updated on  13.05.2022
Most recent event   Tooltip19.07.2024Change - classificationpublished on 21.08.2024  [2024/34]
19.07.2024Change - classificationpublished on 21.08.2024  [2024/34]
Applicant(s)For all designated states
General Electric Renovables España S.L.
C/ Roc Boronat, 78
08005 Barcelona / ES
[2022/24]
Inventor(s)01 / Voss, Stefan
48499 Salzbergen / DE
 [2022/24]
Representative(s)Zimmermann & Partner Patentanwälte mbB
Postfach 330 920
80069 München / DE
[2022/24]
Application number, filing date20212544.908.12.2020
[2022/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4012173
Date:15.06.2022
Language:EN
[2022/24]
Search report(s)(Supplementary) European search report - dispatched on:EP17.05.2021
ClassificationIPC:F03D13/10, F03D13/20
[2022/24]
CPC:
F03D13/10 (EP); F03D13/20 (EP,CN,US); F15D1/10 (US);
F03D17/00 (CN); F03D80/00 (CN); F05B2240/122 (EP,US);
F05B2240/912 (US); F05B2260/96 (EP); F05B2260/964 (US);
Y02E10/72 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/03]
Former [2022/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SYSTEM FÜR EIN TURMSEGMENT EINES TURMS, ENTSPRECHENDES TURMSEGMENT UND EINE WINDTURBINE MIT EINEM TURMSEGMENT[2022/24]
English:A SYSTEM FOR A TOWER SEGMENT OF A TOWER, A RESPECTIVE TOWER SEGMENT, AND A WIND TURBINE HAVING A TOWER SEGMENT[2022/24]
French:SYSTÈME D'UN SEGMENT D'UNE TOUR, SEGMENT DE TOUR RESPECTIF, ET ÉOLIENNE DOTÉE D'UN SEGMENT DE TOUR[2022/24]
Examination procedure15.12.2022Amendment by applicant (claims and/or description)
15.12.2022Examination requested  [2023/03]
15.12.2022Date on which the examining division has become responsible
Fees paidRenewal fee
20.12.2022Renewal fee patent year 03
19.12.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]EP3029313  (SIEMENS AG [DE]);
 [XI]CN206785562U  (BEIJING GOLDWIND SCIENCE & CREATION WINDPOWER EQUIPMENT CO LTD);
 [X]WO2018149527  (SIEMENS WIND POWER AS [DK]);
 [X]CN211474341U  (MING YANG SMART ENERGY GROUP CO LTD);
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.