EP3839983 - OVERVOLTAGE PROTECTION DEVICE AND SYSTEM [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 09.11.2023 Database last updated on 16.11.2024 | |
Former | Request for examination was made Status updated on 29.10.2021 | ||
Former | The application has been published Status updated on 21.05.2021 | Most recent event Tooltip | 01.03.2024 | New entry: Reply to examination report | Applicant(s) | For all designated states Karl Storz SE & Co. KG Dr. Karl-Storz-Straße 34 78532 Tuttlingen / DE | [2021/25] | Inventor(s) | 01 /
STORZ, Klaus Dr.-Karl-Storz-Straße 34 78532 Tuttlingen / DE | [2021/25] | Representative(s) | Patent- und Rechtsanwälte Behrmann Wagner PartG mbB Hegau-Tower Maggistraße 5 (11. OG) 78224 Singen / DE | [2021/25] | Application number, filing date | 20213378.1 | 11.12.2020 | [2021/25] | Priority number, date | DE201910135206 | 19.12.2019 Original published format: DE102019135206 | [2021/25] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3839983 | Date: | 23.06.2021 | Language: | DE | [2021/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.05.2021 | Classification | IPC: | H01C7/12, H01H36/00, H02H9/04 | [2021/25] | CPC: |
H02H9/041 (EP);
H01C7/12 (EP);
H02H9/042 (EP);
H02H9/06 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/48] |
Former [2021/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ÜBERSPANNUNGSSCHUTZVORRICHTUNG SOWIE SYSTEM | [2021/25] | English: | OVERVOLTAGE PROTECTION DEVICE AND SYSTEM | [2021/25] | French: | DISPOSITIF ET SYSTÈME DE PROTECTION CONTRE LES SURTENSIONS | [2021/25] | Examination procedure | 27.10.2021 | Amendment by applicant (claims and/or description) | 27.10.2021 | Examination requested [2021/48] | 27.10.2021 | Date on which the examining division has become responsible | 08.11.2023 | Despatch of a communication from the examining division (Time limit: M04) | 28.02.2024 | Reply to a communication from the examining division | Fees paid | Renewal fee | 20.12.2022 | Renewal fee patent year 03 | 19.12.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]FR2494925 (PHILIPS NV [NL], et al) [A] 1-10 * page 14, line 3 - page 15, line 15; figure 8 *; | [XAI]DE4204559 (SLAMECKA ERNST [DE]) [X] 1 * column 4, line 64 - column 5, line 66; figures 1,2 * [A] 3-9 [I] 2,10; | [A]CN203326599U (HEFEI YUKAI ELECTRIC POWER TECHNOLOGY CO LTD) [A] 1-10 * figure 1 *; | [A]DE102016113267 (EPCOS AG [DE]) [A] 1-10 * paragraphs [0026] - [0047]; figures 1,2 *; | [AP]US2020052484 (ZAHRTE SR DONALD [US]) [AP] 1-10* paragraphs [0008] - [0027] * |