EP3833065 - METHODS AND APPARATUSES FOR CONTROL RESOURCE BUNDLING AND MAPPING IN WIRELESS COMMUNICATION SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.06.2024 Database last updated on 18.01.2025 | |
Former | The patent has been granted Status updated on 21.07.2023 | ||
Former | Grant of patent is intended Status updated on 08.05.2023 | ||
Former | Request for examination was made Status updated on 07.04.2023 | ||
Former | Grant of patent is intended Status updated on 08.02.2023 | ||
Former | Request for examination was made Status updated on 10.12.2021 | ||
Former | The application has been published Status updated on 07.05.2021 | Most recent event Tooltip | 17.01.2025 | Lapse of the patent in a contracting state New state(s): BE | published on 19.02.2025 [2025/08] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18, Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | [2021/23] | Inventor(s) | 01 /
XU, Hua 5 Appaloosa Drive Ottawa, Ontario / CA | [2021/23] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2021/23] | Application number, filing date | 20215488.6 | 13.04.2018 | [2021/23] | Priority number, date | US201762500156P | 02.05.2017 Original published format: US 201762500156 P | [2021/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3833065 | Date: | 09.06.2021 | Language: | EN | [2021/23] | Type: | B1 Patent specification | No.: | EP3833065 | Date: | 23.08.2023 | Language: | EN | [2023/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.04.2021 | Classification | IPC: | H04W4/70, H04L5/00, // H04W72/00 | [2021/23] | CPC: |
H04L5/003 (EP,IL);
H04L5/0053 (EP,IL,KR,RU);
H04W72/535 (CN,IL);
H04W72/12 (IL,RU,US);
H04L1/0038 (IL,KR,RU);
H04L1/0071 (IL,KR);
H04L5/0048 (EP,IL);
H04L5/0051 (EP,IL);
H04L5/0058 (EP,IL,KR,RU);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/02] |
Former [2021/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUR STEUERUNG VON RESSOURCENBÜNDELUNG UND -ABBILDUNG IN DRAHTLOSKOMMUNIKATIONSSYSTEMEN | [2021/23] | English: | METHODS AND APPARATUSES FOR CONTROL RESOURCE BUNDLING AND MAPPING IN WIRELESS COMMUNICATION SYSTEMS | [2021/23] | French: | PROCÉDÉS ET APPAREILS DE COMMANDE POUR COMMANDER LE GROUPAGE ET LA MISE EN CORRESPONDANCE DE RESSOURCES DANS DES SYSTÈMES DE COMMUNICATION SANS FIL | [2021/23] | Examination procedure | 08.12.2021 | Amendment by applicant (claims and/or description) | 08.12.2021 | Examination requested [2022/02] | 08.12.2021 | Date on which the examining division has become responsible | 09.02.2023 | Communication of intention to grant the patent | 06.04.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.05.2023 | Communication of intention to grant the patent | 14.07.2023 | Fee for grant paid | 14.07.2023 | Fee for publishing/printing paid | 14.07.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18794610.8 / EP3607764 | Opposition(s) | 24.05.2024 | No opposition filed within time limit [2024/31] | Fees paid | Renewal fee | 18.12.2020 | Renewal fee patent year 03 | 28.04.2021 | Renewal fee patent year 04 | 25.03.2022 | Renewal fee patent year 05 | 17.03.2023 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 23.08.2023 | BG | 23.08.2023 | CZ | 23.08.2023 | DK | 23.08.2023 | EE | 23.08.2023 | ES | 23.08.2023 | FI | 23.08.2023 | HR | 23.08.2023 | IT | 23.08.2023 | LT | 23.08.2023 | LV | 23.08.2023 | MC | 23.08.2023 | NL | 23.08.2023 | PL | 23.08.2023 | RO | 23.08.2023 | RS | 23.08.2023 | SE | 23.08.2023 | SI | 23.08.2023 | SK | 23.08.2023 | SM | 23.08.2023 | NO | 23.11.2023 | GR | 24.11.2023 | IS | 23.12.2023 | PT | 26.12.2023 | LU | 13.04.2024 | BE | 30.04.2024 | [2025/08] |
Former [2025/04] | AT | 23.08.2023 | |
BG | 23.08.2023 | ||
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
MC | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
LU | 13.04.2024 | ||
Former [2024/52] | AT | 23.08.2023 | |
BG | 23.08.2023 | ||
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
MC | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/51] | AT | 23.08.2023 | |
BG | 23.08.2023 | ||
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/36] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SI | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/26] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/23] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/22] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/20] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/10] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/09] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
LT | 23.08.2023 | ||
NL | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
Former [2024/08] | LT | 23.08.2023 | |
NL | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | Documents cited: | Search | [A] - PANASONIC, "The relation among RS, REG, CCE, and CORSET", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1705173, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051243304 [A] 1-15 * Section 2 * |