blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3852207

EP3852207 - ARRANGEMENT COMPRISING A CONNECTOR AND A WALL PART TO WHICH THE CONNECTOR IS FIXED [Right-click to bookmark this link]
Former [2021/29]CONNECTOR
[2021/48]
StatusNo opposition filed within time limit
Status updated on  16.12.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  07.01.2022
FormerGrant of patent is intended
Status updated on  23.11.2021
FormerRequest for examination was made
Status updated on  18.06.2021
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Yazaki Corporation
4-28, Mita 1-chome
Minato-ku
Tokyo 108-8333 / JP
[2021/29]
Inventor(s)01 / SEKINO, Tetsuya
c/o Yazaki Parts Co., Ltd.
206-1, Nunohikihara
Makinohara-shi, Shizuoka 421-0407 / JP
 [2021/29]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2021/29]
Application number, filing date20217559.229.12.2020
[2021/29]
Priority number, dateJP2020000422115.01.2020         Original published format: JP 2020004221
[2021/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3852207
Date:21.07.2021
Language:EN
[2021/29]
Type: B1 Patent specification 
No.:EP3852207
Date:09.02.2022
Language:EN
[2022/06]
Search report(s)(Supplementary) European search report - dispatched on:EP31.05.2021
ClassificationIPC:H01R13/74, H01R13/506, H01R13/52, H01R13/631
[2021/29]
CPC:
H01R13/748 (EP); H01R13/502 (CN); H01R13/521 (US);
H01R13/506 (EP); H01R13/512 (US); H01R13/518 (US);
H01R13/52 (CN); H01R13/5202 (EP); H01R13/6315 (EP,US);
H01R13/74 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/29]
TitleGerman:ANORDNUNG AUS EINEM STECKVERBINDER UND EINEM WANDTEIL, AN DEM DER STECKVERBINDER BEFESTIGT WIRD[2021/48]
English:ARRANGEMENT COMPRISING A CONNECTOR AND A WALL PART TO WHICH THE CONNECTOR IS FIXED[2021/48]
French:AGENCEMENT COMPRENANT UN CONNECTEUR ET UNE PARTIE DE PAROI AUQUELLE LE CONNECTEUR EST FIXE[2021/48]
Former [2021/29]VERBINDER
Former [2021/29]CONNECTOR
Former [2021/29]CONNECTEUR
Examination procedure29.12.2020Examination requested  [2021/29]
11.08.2021Amendment by applicant (claims and/or description)
24.11.2021Communication of intention to grant the patent
29.12.2021Fee for grant paid
29.12.2021Fee for publishing/printing paid
29.12.2021Receipt of the translation of the claim(s)
Opposition(s)10.11.2022No opposition filed within time limit [2023/03]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
MK09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
[2024/29]
Former [2024/27]AL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MK09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2024/21]AL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/35]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/01]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/49]AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/48]AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/47]AT09.02.2022
DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/46]AT09.02.2022
DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/42]AT09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/39]AT09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/36]AT09.02.2022
ES09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/35]ES09.02.2022
HR09.02.2022
LT09.02.2022
NL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
PT09.06.2022
Former [2022/34]ES09.02.2022
LT09.02.2022
NL09.02.2022
NO09.05.2022
PT09.06.2022
Former [2022/33]LT09.02.2022
NO09.05.2022
Documents cited:Search[A]WO2013094774  (YAZAKI CORP [JP]) [A] 1-7 * figure 7; claim 1 *;
 [A]EP2882045  (YAZAKI CORP [JP]) [A] 1-7* paragraph [0030]; figure 7 *;
 [A]US2019237899  (MAKINO KENJI [JP]) [A] 1-7 * paragraph [0047]; figure 4 *;
 [A]WO2019193992  (AUTONETWORKS TECHNOLOGIES LTD [JP], et al) [A] 1-7 * abstract *
by applicantJP2015011946
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.