blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3921144

EP3921144 - COMPOSITE MATERIAL FOR LIGHTENING VARIOUS STRUCTURES [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  12.11.2021
Database last updated on 16.07.2024
FormerThe international publication has been made
Status updated on  14.08.2020
Formerunknown
Status updated on  26.02.2020
Most recent event   Tooltip27.02.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Frattelli Mazzocchia S.p.A.
Via Enrico Fermi, 39
03100 Frosinone (FR) / IT
[2021/50]
Inventor(s)01 / PAPETTI, Roberto
FRATELLI MAZZOCCHIA S.p.A. Via Enrico Fermi, 39
03100 Frosinone (FR) / IT
02 / SISTO, Vittorio
FRATELLI MAZZOCCHIA S.p.A. Via Enrico Fermi, 39
03100 Frosinone (FR) / IT
03 / DAVID, Francesco
FRATELLI MAZZOCCHIA S.p.A. Via Enrico Fermi, 39
03100 Frosinone (FR) / IT
04 / TAGLIAFERRI, Vincenzo
Via Domenico Fontana, 194
80131 Naples / IT
[N/P]
Former [2021/50]01 / PAPETTI, Roberto
03100 Frosinone (FR) / IT
02 / SISTO, Vittorio
03100 Frosinone (FR) / IT
03 / DAVID, Francesco
03100 Frosinone (FR) / IT
04 / TAGLIAFERRI, Vincenzo
80131 Naples / IT
Representative(s)Tagliafico, Giulia
Litapat
Via Simone Martini, 125
00142 Roma / IT
[2021/50]
Application number, filing date20705125.106.02.2020
[2021/50]
WO2020EP52951
Priority number, dateIT2019000168106.02.2019         Original published format: IT201900001681
[2021/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020161220
Date:13.08.2020
Language:EN
[2020/33]
Type: A1 Application with search report 
No.:EP3921144
Date:15.12.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 13.08.2020 takes the place of the publication of the European patent application.
[2021/50]
Search report(s)International search report - published on:EP13.08.2020
ClassificationIPC:B29C70/44, B29C70/08, C08J5/04, D04H1/10
[2021/50]
CPC:
B29C70/548 (EP); B29C70/12 (EP); B29C70/443 (EP);
C08J5/047 (EP); D04H1/4209 (EP); D04H1/4242 (EP);
D04H1/43835 (EP); D04H1/558 (EP); D04H1/58 (EP);
C08J2363/00 (EP); C08J5/042 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/50]
TitleGerman:VERBUNDMATERIAL ZUR AUFHELLUNG VERSCHIEDENER STRUKTUREN[2021/50]
English:COMPOSITE MATERIAL FOR LIGHTENING VARIOUS STRUCTURES[2021/50]
French:MATÉRIAU COMPOSITE POUR ALLÉGER DIVERSES STRUCTURES[2021/50]
Entry into regional phase16.08.2021National basic fee paid 
16.08.2021Designation fee(s) paid 
16.08.2021Examination fee paid 
Examination procedure16.08.2021Examination requested  [2021/50]
16.08.2021Date on which the examining division has become responsible
10.03.2022Amendment by applicant (claims and/or description)
Fees paidRenewal fee
28.03.2022Renewal fee patent year 03
27.02.2023Renewal fee patent year 04
27.02.2024Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
28.02.202203   M06   Fee paid on   28.03.2022
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XYI]WO2013144844  (AGENZIA NAZ PER LE NUOVE TECNOLOGIE L EN E LO SVILUPPO ECONOMICO SOSTENIBILE ENEA [IT], et al) [X] 8,9 * figure 1 * * page 3, lines 22-26 * * page 6, line 16 - page 7, line 8 * * page 8, line 15 - page 9, line 30 * * page 11, lines 18-20 * * page 14, lines 7-17,27-30 * [Y] 1-9 [I] 1-7;
 [Y]EP2642007  (TORAY INDUSTRIES [JP]) [Y] 1-9 * paragraphs [0092] - [0095] *;
 [Y]WO2009035403  (MOTSANOS GIOTTIS [SE], et al) [Y] 1-9 * claim 10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.