| EP3927513 - RESINING PLANT FOR SLABS OF STONE MATERIAL AND METHOD FOR RESINING SLABS OF STONE MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 05.05.2023 | ||
| Former | Grant of patent is intended Status updated on 14.12.2022 | ||
| Former | Request for examination was made Status updated on 26.11.2021 | ||
| Former | The international publication has been made Status updated on 28.08.2020 | ||
| Former | unknown Status updated on 24.03.2020 | Most recent event Tooltip | 05.09.2025 | Lapse of the patent in a contracting state New state(s): HU | published on 08.10.2025 [2025/41] | Applicant(s) | For all designated states Prometec S.r.l. Via Dorsale 13 Parco Produttivo Apuania 54100 Massa (MS) / IT | [2021/52] | Inventor(s) | 01 /
NOE', Alessio Via Parlascio, 1 54038 Montignoso (MS) / IT | [2023/23] |
| Former [2021/52] | 01 /
NOE', Alessio 54038 Montignoso (MS) / IT | Representative(s) | Mannucci, Michele, et al Ufficio Tecnico Ing. A. Mannucci S.r.l. Via della Scala, 4 50123 Firenze / IT | [2021/52] | Application number, filing date | 20710994.3 | 19.02.2020 | [2021/52] | WO2020IB51366 | Priority number, date | IT20190002483 | 20.02.2019 Original published format: IT201900002483 | [2021/52] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020170144 | Date: | 27.08.2020 | Language: | EN | [2020/35] | Type: | A1 Application with search report | No.: | EP3927513 | Date: | 29.12.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.08.2020 takes the place of the publication of the European patent application. | [2021/52] | Type: | B1 Patent specification | No.: | EP3927513 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | International search report - published on: | EP | 27.08.2020 | Classification | IPC: | B28D1/00, B28B11/04, B28D7/04 | [2021/52] | CPC: |
B28D7/04 (EP);
B28D1/00 (EP);
C04B41/009 (EP);
C04B41/48 (EP)
| C-Set: |
C04B41/009, C04B14/00 (EP);
C04B41/009, C04B14/048 (EP);
C04B41/009, C04B14/285 (EP);
C04B41/48, C04B41/4515 (EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERHARZUNGSANLAGE FÜR PLATTEN AUS STEINMATERIAL UND VERFAHREN ZUR VERHARZUNG VON PLATTEN AUS STEINMATERIAL | [2021/52] | English: | RESINING PLANT FOR SLABS OF STONE MATERIAL AND METHOD FOR RESINING SLABS OF STONE MATERIAL | [2021/52] | French: | USINE DE RÉSINAGE DE DALLES EN MATÉRIAU PIERREUX ET MÉTHODE DE RÉSINAGE DE TELLES DALLES | [2022/49] |
| Former [2021/52] | INSTALLATION D'APPLICATION DE RÉSINE POUR DALLES DE MATÉRIAU EN PIERRE ET PROCÉDÉ D'APPLICATION DE RÉSINE DE DALLES DE MATÉRIAU EN PIERRE | Entry into regional phase | 05.08.2021 | National basic fee paid | 05.08.2021 | Designation fee(s) paid | 05.08.2021 | Examination fee paid | Examination procedure | 16.11.2020 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 05.08.2021 | Examination requested [2021/52] | 05.08.2021 | Date on which the examining division has become responsible | 13.05.2022 | Amendment by applicant (claims and/or description) | 15.12.2022 | Communication of intention to grant the patent | 21.04.2023 | Fee for grant paid | 21.04.2023 | Fee for publishing/printing paid | 21.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 23.03.2022 | Renewal fee patent year 03 | 24.02.2023 | Renewal fee patent year 04 | Penalty fee | Additional fee for renewal fee | 28.02.2022 | 03   M06   Fee paid on   23.03.2022 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 19.02.2020 | HU | 19.02.2020 | AT | 07.06.2023 | BG | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | NL | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | NO | 07.09.2023 | IS | 07.10.2023 | GB | 19.02.2024 | IE | 19.02.2024 | LU | 19.02.2024 | BE | 29.02.2024 | CH | 29.02.2024 | [2025/41] |
| Former [2025/37] | CY | 19.02.2020 | |
| AT | 07.06.2023 | ||
| BG | 07.06.2023 | ||
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| GB | 19.02.2024 | ||
| IE | 19.02.2024 | ||
| LU | 19.02.2024 | ||
| BE | 29.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2025/10] | AT | 07.06.2023 | |
| BG | 07.06.2023 | ||
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| GB | 19.02.2024 | ||
| IE | 19.02.2024 | ||
| LU | 19.02.2024 | ||
| BE | 29.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2025/09] | AT | 07.06.2023 | |
| BG | 07.06.2023 | ||
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| GB | 19.02.2024 | ||
| LU | 19.02.2024 | ||
| BE | 29.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2025/08] | AT | 07.06.2023 | |
| BG | 07.06.2023 | ||
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| LU | 19.02.2024 | ||
| BE | 29.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2024/51] | AT | 07.06.2023 | |
| BG | 07.06.2023 | ||
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| LU | 19.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2024/48] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| LU | 19.02.2024 | ||
| CH | 29.02.2024 | ||
| Former [2024/47] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| LU | 19.02.2024 | ||
| Former [2024/45] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| MC | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| Former [2024/26] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SI | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| Former [2024/22] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| DK | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| Former [2024/10] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| EE | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| PL | 07.06.2023 | ||
| RO | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| Former [2024/09] | AT | 07.06.2023 | |
| CZ | 07.06.2023 | ||
| FI | 07.06.2023 | ||
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| IS | 07.10.2023 | ||
| Former [2024/08] | FI | 07.06.2023 | |
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| SK | 07.06.2023 | ||
| SM | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| Former [2024/03] | FI | 07.06.2023 | |
| HR | 07.06.2023 | ||
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| Former [2024/01] | HR | 07.06.2023 | |
| LT | 07.06.2023 | ||
| LV | 07.06.2023 | ||
| NL | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| Former [2023/52] | HR | 07.06.2023 | |
| NL | 07.06.2023 | ||
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| Former [2023/51] | HR | 07.06.2023 | |
| RS | 07.06.2023 | ||
| SE | 07.06.2023 | ||
| NO | 07.09.2023 | ||
| Former [2023/48] | SE | 07.06.2023 | |
| NO | 07.09.2023 | Cited in | International search | [YA] WO2007054995 (PROTEC SRL et al.) [Y] 1,2,4,5,8-11 * page 2, lines 2-20 * * page 5, line 16 - page 6, line 14 * * page 6, line 28 - page 7, line 29 * * figures 1,2,3,4,5,10,11,12,12A *[A] 3,6,7,12-18 | [YA] ES2228263 (INVEST DE IND DE LA CONSTRUCCI et al.) [Y] 13,18 * abstract * * figure - *[A] 1-12,14-17 | [YA] WO2018215898 (TONCELLI LUCA et al.) [Y] 1,2,4,5,8-11,13,18 * page 1, line 35 - page 2, line 6 * * page 7, line 35 - page 8, line 10 * * page 9, lines 18-33 * * figures 6-9 *[A] 3,6,7,12,14-17 | [AD] WO2018073776 (PROMETEC S R L et al.) [AD] 1-18 * page 1, lines 4-7,18-28 * * page 9, line 31 - page 10, line 12 * * figure - * | [A] EP2724999 (ANTOLINI LUIGI & C S P A et al.) [A] 1-18 * paragraphs [0001] , [0002] , [0022] , [0023] , [0025] , [0029] , [0033] - [0036] * |