Extract from the Register of European Patents

EP About this file: EP3927513

EP3927513 - RESINING PLANT FOR SLABS OF STONE MATERIAL AND METHOD FOR RESINING SLABS OF STONE MATERIAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.04.2024
Database last updated on 11.04.2026
FormerThe patent has been granted
Status updated on  05.05.2023
FormerGrant of patent is intended
Status updated on  14.12.2022
FormerRequest for examination was made
Status updated on  26.11.2021
FormerThe international publication has been made
Status updated on  28.08.2020
Formerunknown
Status updated on  24.03.2020
Most recent event   Tooltip05.09.2025Lapse of the patent in a contracting state
New state(s): HU
published on 08.10.2025  [2025/41]
Applicant(s)For all designated states
Prometec S.r.l.
Via Dorsale 13
Parco Produttivo Apuania
54100 Massa (MS) / IT
[2021/52]
Inventor(s)01 / NOE', Alessio
Via Parlascio, 1
54038 Montignoso (MS) / IT
 [2023/23]
Former [2021/52]01 / NOE', Alessio
54038 Montignoso (MS) / IT
Representative(s)Mannucci, Michele, et al
Ufficio Tecnico
Ing. A. Mannucci S.r.l.
Via della Scala, 4
50123 Firenze / IT
[2021/52]
Application number, filing date20710994.319.02.2020
[2021/52]
WO2020IB51366
Priority number, dateIT2019000248320.02.2019         Original published format: IT201900002483
[2021/52]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020170144
Date:27.08.2020
Language:EN
[2020/35]
Type: A1 Application with search report 
No.:EP3927513
Date:29.12.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 27.08.2020 takes the place of the publication of the European patent application.
[2021/52]
Type: B1 Patent specification 
No.:EP3927513
Date:07.06.2023
Language:EN
[2023/23]
Search report(s)International search report - published on:EP27.08.2020
ClassificationIPC:B28D1/00, B28B11/04, B28D7/04
[2021/52]
CPC:
B28D7/04 (EP); B28D1/00 (EP); C04B41/009 (EP);
C04B41/48 (EP)
C-Set:
C04B41/009, C04B14/00 (EP);
C04B41/009, C04B14/048 (EP);
C04B41/009, C04B14/285 (EP);
C04B41/48, C04B41/4515 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/52]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERHARZUNGSANLAGE FÜR PLATTEN AUS STEINMATERIAL UND VERFAHREN ZUR VERHARZUNG VON PLATTEN AUS STEINMATERIAL[2021/52]
English:RESINING PLANT FOR SLABS OF STONE MATERIAL AND METHOD FOR RESINING SLABS OF STONE MATERIAL[2021/52]
French:USINE DE RÉSINAGE DE DALLES EN MATÉRIAU PIERREUX ET MÉTHODE DE RÉSINAGE DE TELLES DALLES[2022/49]
Former [2021/52]INSTALLATION D'APPLICATION DE RÉSINE POUR DALLES DE MATÉRIAU EN PIERRE ET PROCÉDÉ D'APPLICATION DE RÉSINE DE DALLES DE MATÉRIAU EN PIERRE
Entry into regional phase05.08.2021National basic fee paid 
05.08.2021Designation fee(s) paid 
05.08.2021Examination fee paid 
Examination procedure16.11.2020Request for preliminary examination filed
International Preliminary Examining Authority: EP
05.08.2021Examination requested  [2021/52]
05.08.2021Date on which the examining division has become responsible
13.05.2022Amendment by applicant (claims and/or description)
15.12.2022Communication of intention to grant the patent
21.04.2023Fee for grant paid
21.04.2023Fee for publishing/printing paid
21.04.2023Receipt of the translation of the claim(s)
Opposition(s)08.03.2024No opposition filed within time limit [2024/20]
Fees paidRenewal fee
23.03.2022Renewal fee patent year 03
24.02.2023Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
28.02.202203   M06   Fee paid on   23.03.2022
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY19.02.2020
HU19.02.2020
AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
GB19.02.2024
IE19.02.2024
LU19.02.2024
BE29.02.2024
CH29.02.2024
[2025/41]
Former [2025/37]CY19.02.2020
AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
GB19.02.2024
IE19.02.2024
LU19.02.2024
BE29.02.2024
CH29.02.2024
Former [2025/10]AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
GB19.02.2024
IE19.02.2024
LU19.02.2024
BE29.02.2024
CH29.02.2024
Former [2025/09]AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
GB19.02.2024
LU19.02.2024
BE29.02.2024
CH29.02.2024
Former [2025/08]AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
LU19.02.2024
BE29.02.2024
CH29.02.2024
Former [2024/51]AT07.06.2023
BG07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
LU19.02.2024
CH29.02.2024
Former [2024/48]AT07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
LU19.02.2024
CH29.02.2024
Former [2024/47]AT07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
LU19.02.2024
Former [2024/45]AT07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
Former [2024/26]AT07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
Former [2024/22]AT07.06.2023
CZ07.06.2023
DK07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
Former [2024/10]AT07.06.2023
CZ07.06.2023
EE07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
Former [2024/09]AT07.06.2023
CZ07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
IS07.10.2023
Former [2024/08]FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
Former [2024/03]FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
Former [2024/01]HR07.06.2023
LT07.06.2023
LV07.06.2023
NL07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
Former [2023/52]HR07.06.2023
NL07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
Former [2023/51]HR07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
Former [2023/48]SE07.06.2023
NO07.09.2023
Cited inInternational search[YA] WO2007054995  (PROTEC SRL et al.) [Y] 1,2,4,5,8-11 * page 2, lines 2-20 * * page 5, line 16 - page 6, line 14 * * page 6, line 28 - page 7, line 29 * * figures 1,2,3,4,5,10,11,12,12A *[A] 3,6,7,12-18
 [YA] ES2228263  (INVEST DE IND DE LA CONSTRUCCI et al.) [Y] 13,18 * abstract * * figure - *[A] 1-12,14-17
 [YA] WO2018215898  (TONCELLI LUCA et al.) [Y] 1,2,4,5,8-11,13,18 * page 1, line 35 - page 2, line 6 * * page 7, line 35 - page 8, line 10 * * page 9, lines 18-33 * * figures 6-9 *[A] 3,6,7,12,14-17
 [AD] WO2018073776  (PROMETEC S R L et al.) [AD] 1-18 * page 1, lines 4-7,18-28 * * page 9, line 31 - page 10, line 12 * * figure - *
 [A] EP2724999  (ANTOLINI LUIGI & C S P A et al.) [A] 1-18 * paragraphs [0001] , [0002] , [0022] , [0023] , [0025] , [0029] , [0033] - [0036] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.