blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3921495

EP3921495 - ACTUATION TRANSMISSION DEVICE FOR A LIFTING AND SLIDING ELEMENT WITH STOPPABLE ACTUATION LEVER AND LIFTING AND SLIDING ELEMENT EQUIPPED WITH SUCH A DEVICE [Right-click to bookmark this link]
Former [2021/50]ACTUATION GEAR MECHANISM FOR A LIFT AND SLIDE ELEMENT COMPRISING A LOCKABLE ACTUATION LEVER, AND A LIFT AND SLIDE ELEMENT EQUIPPED WITH SUCH AN ACTUATION GEAR MECHANISM
[2023/08]
StatusNo opposition filed within time limit
Status updated on  27.04.2024
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  19.05.2023
FormerGrant of patent is intended
Status updated on  08.03.2023
FormerRequest for examination was made
Status updated on  12.11.2021
FormerThe international publication has been made
Status updated on  16.10.2020
Formerunknown
Status updated on  06.04.2020
Most recent event   Tooltip02.08.2024Change - lapse in a contracting state
State(s) deleted from list of lapses: PL
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
MACO Technologie GmbH
Alpenstrasse 173
5020 Salzburg / AT
[2021/50]
Inventor(s)01 / MITTERLEHNER, Stefan
Morzger Straße 74
5020 Salzburg / AT
 [2023/25]
Former [2021/50]01 / MITTERLEHNER, Stefan
5020 Salzburg / AT
Representative(s)Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Strasse 1
80336 München / DE
[2021/50]
Application number, filing date20714122.709.03.2020
[2021/50]
WO2020EP56145
Priority number, dateDE20191010964211.04.2019         Original published format: DE102019109642
[2021/50]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2020207677
Date:15.10.2020
Language:DE
[2020/42]
Type: A1 Application with search report 
No.:EP3921495
Date:15.12.2021
Language:DE
The application published by WIPO in one of the EPO official languages on 15.10.2020 takes the place of the publication of the European patent application.
[2021/50]
Type: B1 Patent specification 
No.:EP3921495
Date:21.06.2023
Language:DE
[2023/25]
Search report(s)International search report - published on:EP15.10.2020
ClassificationIPC:E05B15/00, E05B15/04, E05C9/02, E05C9/16, E05D15/56
[2021/50]
CPC:
E05B15/0013 (EP); E05B15/006 (EP); E05B15/04 (EP);
E05C9/02 (EP); E05C9/16 (EP); E05D15/565 (EP);
E05Y2201/478 (EP); E05Y2900/148 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/50]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BETÄTIGUNGSGETRIEBE FÜR EIN HEBE-SCHIEBEELEMENT MIT ARRETIERBAREM BETÄTIGUNGSHEBEL SOWIE MIT SOLCH EINEM BETÄTIGUNGSGETRIEBE AUSGESTATTETES HEBE-SCHIEBEELEMENT[2021/50]
English:ACTUATION TRANSMISSION DEVICE FOR A LIFTING AND SLIDING ELEMENT WITH STOPPABLE ACTUATION LEVER AND LIFTING AND SLIDING ELEMENT EQUIPPED WITH SUCH A DEVICE[2023/08]
French:DISPOSITIF DE TRANSMISSION D'ACTIONNEMENT POUR UN ÉLÉMENT LEVANT ET COULISSANT AVEC LEVIER D'ARRÊT ET ÉLÉMENT LEVANT ET COULISSANT AVEC UN TEL DISPOSITIF[2023/08]
Former [2021/50]ACTUATION GEAR MECHANISM FOR A LIFT AND SLIDE ELEMENT COMPRISING A LOCKABLE ACTUATION LEVER, AND A LIFT AND SLIDE ELEMENT EQUIPPED WITH SUCH AN ACTUATION GEAR MECHANISM
Former [2021/50]MÉCANISME D'ACTIONNEMENT POUR UN ÉLÉMENT LEVANT ET COULISSANT POURVU D'UN LEVIER D'ACTIONNEMENT POUVANT ÊTRE BLOQUÉ AINSI QU'ÉLÉMENT LEVANT ET COULISSANT ÉQUIPÉ D'UN TEL MÉCANISME D'ACTIONNEMENT
Entry into regional phase09.09.2021National basic fee paid 
09.09.2021Designation fee(s) paid 
09.09.2021Examination fee paid 
Examination procedure09.09.2021Examination requested  [2021/50]
09.09.2021Date on which the examining division has become responsible
13.10.2021Amendment by applicant (claims and/or description)
09.03.2023Communication of intention to grant the patent
12.05.2023Fee for grant paid
12.05.2023Fee for publishing/printing paid
12.05.2023Receipt of the translation of the claim(s)
Opposition(s)22.03.2024No opposition filed within time limit [2024/22]
Fees paidRenewal fee
25.03.2022Renewal fee patent year 03
23.03.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
[2024/36]
Former [2024/26]CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SI21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/22]CZ21.06.2023
DK21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/10]CZ21.06.2023
EE21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
PL21.06.2023
RO21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
PT23.10.2023
Former [2024/09]CZ21.06.2023
ES21.06.2023
FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
IS21.10.2023
Former [2024/08]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
RS21.06.2023
SE21.06.2023
SK21.06.2023
SM21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/03]FI21.06.2023
HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2024/01]HR21.06.2023
LT21.06.2023
LV21.06.2023
NL21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/52]HR21.06.2023
NL21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/51]HR21.06.2023
RS21.06.2023
SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/50]SE21.06.2023
NO21.09.2023
GR22.09.2023
Former [2023/48]SE21.06.2023
NO21.09.2023
Cited inInternational search[XAY]DE1002656  (GRETSCH UNITAS GMBH) [X] 1,11,12 * the whole document * [A] 3-10 [Y] 2;
 [XYI]KR200466047Y  (-) [X] 1,11,12 * the whole document * [Y] 3-10 [I] 2;
 [YA]US2017298652  (LIAU WAN LAI [TW]) [Y] 2-10 * the whole document *[A] 1,11,12
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.