EP4139389 - OPTICAL BONDING SILICONE WITH UV BLOCKER FOR OUTDOOR APPLICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.10.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 27.10.2023 | ||
Former | Grant of patent is intended Status updated on 19.06.2023 | ||
Former | Request for examination was made Status updated on 27.01.2023 | ||
Former | The international publication has been made Status updated on 29.10.2021 | ||
Former | unknown Status updated on 08.05.2020 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Wacker Chemie AG Gisela-Stein-Straße 1 81671 München / DE | [2024/32] |
Former [2023/09] | For all designated states Wacker Chemie AG Hanns-Seidel-Platz 4 81737 München / DE | Inventor(s) | 01 /
SHAO, Yan Dillon 2825 48105 Ann Arbor, MI / US | [2023/48] |
Former [2023/09] | 01 /
SHAO, Yan Dillon 2825 48105 Ann Arbor, MI / US | Representative(s) | Mieskes, Klaus Theoderich, et al Wacker Chemie AG Gisela-Stein-Straße 1 81671 München / DE | [N/P] |
Former [2023/09] | Mieskes, Klaus Theoderich, et al Wacker Chemie AG Intellectual Property Hanns-Seidel-Platz 4 81737 München / DE | Application number, filing date | 20721545.0 | 23.04.2020 | [2023/09] | WO2020EP61377 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021213662 | Date: | 28.10.2021 | Language: | EN | [2021/43] | Type: | A1 Application with search report | No.: | EP4139389 | Date: | 01.03.2023 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.10.2021 takes the place of the publication of the European patent application. | [2023/09] | Type: | B1 Patent specification | No.: | EP4139389 | Date: | 29.11.2023 | Language: | EN | [2023/48] | Search report(s) | International search report - published on: | EP | 28.10.2021 | Classification | IPC: | C08K5/3475, C09J183/04 | [2023/09] | CPC: |
C08K5/3475 (EP,KR);
C09J183/04 (EP,KR);
C08G77/12 (EP,KR,US);
C08G77/20 (EP,KR,US)
| C-Set: |
C09J183/04, C08L83/00, C08K5/56, C08K5/3475 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SILIKONVERBINDUNG MIT UV-BLOCKER ZUR AUSSENANWENDUNG | [2023/09] | English: | OPTICAL BONDING SILICONE WITH UV BLOCKER FOR OUTDOOR APPLICATION | [2023/09] | French: | SILICONE POUR COLLAGE OPTIQUE AVEC BLOQUEUR UV POUR APPLICATION EN EXTÉRIEUR | [2023/09] | Entry into regional phase | 17.10.2022 | National basic fee paid | 17.10.2022 | Designation fee(s) paid | 17.10.2022 | Examination fee paid | Examination procedure | 19.03.2021 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 17.10.2022 | Examination requested [2023/09] | 17.10.2022 | Date on which the examining division has become responsible | 20.06.2023 | Communication of intention to grant the patent | 18.10.2023 | Fee for grant paid | 18.10.2023 | Fee for publishing/printing paid | 18.10.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 30.08.2024 | No opposition filed within time limit [2024/45] | Fees paid | Renewal fee | 17.10.2022 | Renewal fee patent year 03 | 25.04.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 29.11.2023 | CZ | 29.11.2023 | DK | 29.11.2023 | EE | 29.11.2023 | ES | 29.11.2023 | HR | 29.11.2023 | IT | 29.11.2023 | LT | 29.11.2023 | LV | 29.11.2023 | NL | 29.11.2023 | PL | 29.11.2023 | RO | 29.11.2023 | RS | 29.11.2023 | SE | 29.11.2023 | SI | 29.11.2023 | SK | 29.11.2023 | SM | 29.11.2023 | BG | 29.02.2024 | NO | 29.02.2024 | GR | 01.03.2024 | IS | 29.03.2024 | PT | 01.04.2024 | [2024/49] |
Former [2024/36] | AT | 29.11.2023 | |
CZ | 29.11.2023 | ||
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
IT | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
NL | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SE | 29.11.2023 | ||
SK | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
PT | 01.04.2024 | ||
Former [2024/35] | AT | 29.11.2023 | |
CZ | 29.11.2023 | ||
DK | 29.11.2023 | ||
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
NL | 29.11.2023 | ||
PL | 29.11.2023 | ||
RO | 29.11.2023 | ||
RS | 29.11.2023 | ||
SE | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/34] | DK | 29.11.2023 | |
EE | 29.11.2023 | ||
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
NL | 29.11.2023 | ||
PL | 29.11.2023 | ||
RS | 29.11.2023 | ||
SE | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/33] | DK | 29.11.2023 | |
ES | 29.11.2023 | ||
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
NL | 29.11.2023 | ||
PL | 29.11.2023 | ||
RS | 29.11.2023 | ||
SE | 29.11.2023 | ||
SM | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/26] | ES | 29.11.2023 | |
HR | 29.11.2023 | ||
LT | 29.11.2023 | ||
LV | 29.11.2023 | ||
NL | 29.11.2023 | ||
PL | 29.11.2023 | ||
RS | 29.11.2023 | ||
SE | 29.11.2023 | ||
BG | 29.02.2024 | ||
NO | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/21] | LT | 29.11.2023 | |
BG | 29.02.2024 | ||
GR | 01.03.2024 | ||
IS | 29.03.2024 | ||
Former [2024/20] | GR | 01.03.2024 | |
IS | 29.03.2024 | Cited in | International search | [I]EP3070748 (SHINETSU CHEMICAL CO [JP]); | [I]WO2019133580 (HENKEL IP & HOLDING GMBH [DE], et al) | by applicant | WO2009147020 | US9482788 |