EP3983674 - A METHOD FOR DETECTING A WIND SPEED, A METHOD FOR CONTROLLING A WIND TURBINE, A METHOD FOR CONTROLLING A WIND FARM, AND A WIND TURBINE [Right-click to bookmark this link] | |||
Former [2022/16] | METHOD AND WIND TURBINE FOR DETECTING A WIND SPEED | ||
[2023/16] | Status | No opposition filed within time limit Status updated on 26.07.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 18.08.2023 | ||
Former | Grant of patent is intended Status updated on 19.04.2023 | ||
Former | Request for examination was made Status updated on 18.03.2022 | ||
Former | The international publication has been made Status updated on 18.12.2020 | ||
Former | unknown Status updated on 20.06.2020 | Most recent event Tooltip | 26.07.2024 | No opposition filed within time limit | published on 28.08.2024 [2024/35] | Applicant(s) | For all designated states Wobben Properties GmbH Borsigstraße 26 26607 Aurich / DE | [2022/16] | Inventor(s) | 01 /
STOLTENJOHANNES, Jürgen Parkstraße 38 26605 Aurich / DE | 02 /
GESCHE, Timo Rüskeweg 53 26624 Südbrookmerland / DE | [2022/16] | Representative(s) | Eisenführ Speiser Patentanwälte Rechtsanwälte PartGmbB Postfach 10 60 78 28060 Bremen / DE | [2022/16] | Application number, filing date | 20732153.0 | 04.06.2020 | [2022/16] | WO2020EP65500 | Priority number, date | DE201910116050 | 13.06.2019 Original published format: DE102019116050 | [2022/16] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020249463 | Date: | 17.12.2020 | Language: | DE | [2020/51] | Type: | A1 Application with search report | No.: | EP3983674 | Date: | 20.04.2022 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.12.2020 takes the place of the publication of the European patent application. | [2022/16] | Type: | B1 Patent specification | No.: | EP3983674 | Date: | 20.09.2023 | Language: | DE | [2023/38] | Search report(s) | International search report - published on: | EP | 17.12.2020 | Classification | IPC: | F03D17/00, F03D7/04, F03D9/25 | [2022/16] | CPC: |
F03D17/00 (EP);
F03D7/048 (EP);
F05B2240/96 (EP);
F05B2260/82 (EP);
F05B2260/821 (EP);
F05B2260/84 (EP);
F05B2270/32 (EP);
F05B2270/321 (EP);
F05B2270/8042 (EP);
Y02E10/72 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUM ERFASSEN EINER WINDGESCHWINDIGKEIT, VERFAHREN ZUM STEUERN EINER WINDENERGIEANLAGE, VERFAHREN ZUM STEUERN EINES WINDPARKS; UND WINDENERGIEANLAGE | [2023/16] | English: | A METHOD FOR DETECTING A WIND SPEED, A METHOD FOR CONTROLLING A WIND TURBINE, A METHOD FOR CONTROLLING A WIND FARM, AND A WIND TURBINE | [2023/16] | French: | PROCÉDÉ PERMETTANT DE DÉTECTER LA VITESSE DU VENT, PROCÉDÉ PERMETTANT DE COMMANDER UNE ÉOLIENNE, PROCÉDÉ PERMETTANT DE COMMANDER UN PARC ÉOLIEN; ET ÉOLIENNE | [2023/18] |
Former [2022/16] | VERFAHREN UND WINDENERGIEANLAGE ZUM ERFASSEN EINER WINDGESCHWINDIGKEIT | ||
Former [2022/16] | METHOD AND WIND TURBINE FOR DETECTING A WIND SPEED | ||
Former [2022/16] | PROCÉDÉ ET ÉOLIENNE PERMETTANT DE DÉTECTER LA VITESSE DU VENT | Entry into regional phase | 13.01.2022 | National basic fee paid | 13.01.2022 | Designation fee(s) paid | 13.01.2022 | Examination fee paid | Examination procedure | 13.01.2022 | Examination requested [2022/16] | 13.01.2022 | Date on which the examining division has become responsible | 27.07.2022 | Amendment by applicant (claims and/or description) | 20.04.2023 | Communication of intention to grant the patent | 10.08.2023 | Fee for grant paid | 10.08.2023 | Fee for publishing/printing paid | 10.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 21.06.2024 | No opposition filed within time limit [2024/35] | Fees paid | Renewal fee | 30.06.2022 | Renewal fee patent year 03 | 30.06.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 20.09.2023 | DK | 20.09.2023 | EE | 20.09.2023 | ES | 20.09.2023 | FI | 20.09.2023 | HR | 20.09.2023 | IT | 20.09.2023 | LT | 20.09.2023 | LV | 20.09.2023 | NL | 20.09.2023 | PL | 20.09.2023 | RO | 20.09.2023 | RS | 20.09.2023 | SE | 20.09.2023 | SK | 20.09.2023 | SM | 20.09.2023 | NO | 20.12.2023 | GR | 21.12.2023 | IS | 20.01.2024 | PT | 22.01.2024 | [2024/33] |
Former [2024/26] | CZ | 20.09.2023 | |
EE | 20.09.2023 | ||
ES | 20.09.2023 | ||
FI | 20.09.2023 | ||
HR | 20.09.2023 | ||
IT | 20.09.2023 | ||
LT | 20.09.2023 | ||
LV | 20.09.2023 | ||
NL | 20.09.2023 | ||
PL | 20.09.2023 | ||
RO | 20.09.2023 | ||
RS | 20.09.2023 | ||
SE | 20.09.2023 | ||
SK | 20.09.2023 | ||
SM | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
IS | 20.01.2024 | ||
PT | 22.01.2024 | ||
Former [2024/23] | CZ | 20.09.2023 | |
EE | 20.09.2023 | ||
ES | 20.09.2023 | ||
FI | 20.09.2023 | ||
HR | 20.09.2023 | ||
LT | 20.09.2023 | ||
LV | 20.09.2023 | ||
NL | 20.09.2023 | ||
RO | 20.09.2023 | ||
RS | 20.09.2023 | ||
SE | 20.09.2023 | ||
SK | 20.09.2023 | ||
SM | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
IS | 20.01.2024 | ||
PT | 22.01.2024 | ||
Former [2024/20] | FI | 20.09.2023 | |
HR | 20.09.2023 | ||
LT | 20.09.2023 | ||
LV | 20.09.2023 | ||
NL | 20.09.2023 | ||
RS | 20.09.2023 | ||
SE | 20.09.2023 | ||
SM | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
IS | 20.01.2024 | ||
Former [2024/14] | FI | 20.09.2023 | |
HR | 20.09.2023 | ||
LT | 20.09.2023 | ||
LV | 20.09.2023 | ||
NL | 20.09.2023 | ||
RS | 20.09.2023 | ||
SE | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
Former [2024/10] | FI | 20.09.2023 | |
HR | 20.09.2023 | ||
LT | 20.09.2023 | ||
LV | 20.09.2023 | ||
RS | 20.09.2023 | ||
SE | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
Former [2024/09] | FI | 20.09.2023 | |
LT | 20.09.2023 | ||
SE | 20.09.2023 | ||
NO | 20.12.2023 | ||
GR | 21.12.2023 | ||
Former [2024/08] | LT | 20.09.2023 | |
NO | 20.12.2023 | ||
GR | 21.12.2023 | Cited in | International search | [Y]DE10219062 (SCHOPF WALTER [DE]) [Y] 1-6,9-11,14-19 * paragraphs [0007] , [00 8] , [0 26] - [0028]; figures 3-5; claim 1 *; | [A]EP2460034 (MICHIGAN AEROSPACE CORP [US]) [A] 1* paragraphs [0051] , [0232] , [0306]; figures 1,2; claim 1 *; | [YA]DE102015103757 (LUCKS CHRISTOPH [DE]) [Y] 1-6,9-11,14-19 * paragraphs [0045] , [0053] , [0054]; figures 4,5; claims 1,2 * [A] 7,8,12,13 | by applicant | DE102005045516 | US2018017039 |